Location
Newberg, Oregon
Project code
SD-23-377

Newberg Water Treatment Plant Resilience Improvements

Replace the 70-year old groundwater TP with uncovered basins and filters and design/construct a new groundwater TP that is seismically resilient and will have the capacity to serve future City demands.

Last verified Sep 25, 2026 2 official source families

What is proposed

Replace the 70-year old groundwater TP with uncovered basins and filters and design/construct a new groundwater TP that is seismically resilient and will have the capacity to serve future City demands.

OHA publishes project in revised DWSRF public-comment list

The project appears in OHA's June 9, 2026 revised public-comment PPL, preserving a second official project-specific publication record.

Business Oregon financing invitation and confirmation of the current project delivery plan

Jul 2026–Jun 2027 Moderate confidence

Waterline IQ forecast

Confirmed work and commercial interpretation

What is proposed

Replace the 70-year old groundwater TP with uncovered basins and filters and design/construct a new groundwater TP that is seismically resilient and will have the capacity to serve future City demands.

Potential commercial work

Waterline IQ interpretation of accepted scope. These items are not confirmed contract packages or specifications.

Treatment plant

Water treatment plant and Water treatment filtration

Process and controls

Electrical and controls

Civil and site work

Concrete and structural

Key official milestones

  1. Official event

    Added during OHA's 1Q2023 DWSRF priority-list cycle

    OHA lists the project for DWSRF funding consideration; the workbook does not establish a formal procurement date.

    View evidence for Added during OHA's 1Q2023 DWSRF priority-list cycle
  2. Official event

    OHA publishes project in revised DWSRF public-comment list

    The project appears in OHA's June 9, 2026 revised public-comment PPL, preserving a second official project-specific publication record.

    View evidence for OHA publishes project in revised DWSRF public-comment list
Evidence and sources
9 accepted claims across 2 official document versions
Selected official evidence · Inspect exact excerpts and locators

2026 Q3 Combined Base DWSRF and IIJA General Supplemental PPL — public-comment PDF

OHA DWSRF infrastructure project priority list — public-comment edition
Inspect exact excerpt and locator
“hichever is lower), and interest rates as low as 1%. City of Newberg Issue: The City of Newberg’s System TP contains uncovered settling Rating results include: SD-23-377 basins and filters used for iron removal outdoors; this atmospheric 40 pts (Health Risk...”

2026 Q3 Combined Base DWSRF and IIJA General Supplemental PPL

OHA DWSRF infrastructure project priority list
Inspect exact excerpt and locator
“6 | City of Newberg SD-23-377 Yamhill Arthur Chaput / Michelle Bilberry 25,138 | | Issue: The City of Newberg’s System TP contains uncovered settling basins and filters used for iron removal outdoors; this atmospheric exposure puts disinfected drinking wat...”