Newberg Water Treatment Plant Resilience Improvements
Replace the 70-year old groundwater TP with uncovered basins and filters and design/construct a new groundwater TP that is seismically resilient and will have the capacity to serve future City demands.
Last verified Sep 25, 2026 2 official source families
Project brief
What is proposed
Replace the 70-year old groundwater TP with uncovered basins and filters and design/construct a new groundwater TP that is seismically resilient and will have the capacity to serve future City demands.
Latest material change
OHA publishes project in revised DWSRF public-comment list
The project appears in OHA's June 9, 2026 revised public-comment PPL, preserving a second official project-specific publication record.
Commercial scope
Confirmed work and commercial interpretation
What is proposed
Replace the 70-year old groundwater TP with uncovered basins and filters and design/construct a new groundwater TP that is seismically resilient and will have the capacity to serve future City demands.
Potential commercial work
Waterline IQ interpretation of accepted scope. These items are not confirmed contract packages or specifications.
Treatment plant
Water treatment plant and Water treatment filtration
Process and controls
Electrical and controls
Civil and site work
Concrete and structural
Selected lifecycle
Key official milestones
-
Official event
Added during OHA's 1Q2023 DWSRF priority-list cycle
OHA lists the project for DWSRF funding consideration; the workbook does not establish a formal procurement date.
View evidence for Added during OHA's 1Q2023 DWSRF priority-list cycle -
Official event
OHA publishes project in revised DWSRF public-comment list
The project appears in OHA's June 9, 2026 revised public-comment PPL, preserving a second official project-specific publication record.
View evidence for OHA publishes project in revised DWSRF public-comment list
Evidence and sources
9 accepted claims across 2 official document versions
Selected official evidence · Inspect exact excerpts and locators
2026 Q3 Combined Base DWSRF and IIJA General Supplemental PPL — public-comment PDF
OHA DWSRF infrastructure project priority list — public-comment edition“hichever is lower), and interest rates as low as 1%. City of Newberg Issue: The City of Newberg’s System TP contains uncovered settling Rating results include: SD-23-377 basins and filters used for iron removal outdoors; this atmospheric 40 pts (Health Risk...”
2026 Q3 Combined Base DWSRF and IIJA General Supplemental PPL
OHA DWSRF infrastructure project priority list“6 | City of Newberg SD-23-377 Yamhill Arthur Chaput / Michelle Bilberry 25,138 | | Issue: The City of Newberg’s System TP contains uncovered settling basins and filters used for iron removal outdoors; this atmospheric exposure puts disinfected drinking wat...”