Location
Weston, Oregon
Project code
SD-26-12

Weston Well, Storage, Pump Station, and Distribution Improvements

The project entails: drilling a new well, adding a pump station, adding a back up generator, adding a new storage tank, transmission line upsize and other distribution items(current reservoir maintenance, new water meters and new fire hydrants).

Last verified Sep 25, 2026 3 official source families

What is proposed

The project entails: drilling a new well, adding a pump station, adding a back up generator, adding a new storage tank, transmission line upsize and other distribution items(current reservoir maintenance, new water meters and new fire hydrants).

Added during OHA's 3Q2026 DWSRF priority-list cycle

OHA lists the project for DWSRF funding consideration; the workbook does not establish a formal procurement date.

Official confirmation of funding invitation, final master-plan basis, and design packaging

Jul 2026–Jun 2027 Moderate confidence

Waterline IQ forecast

Confirmed work and commercial interpretation

What is proposed

The project entails: drilling a new well, adding a pump station, adding a back up generator, adding a new storage tank, transmission line upsize and other distribution items(current reservoir maintenance, new water meters and new fire hydrants).

Potential commercial work

Waterline IQ interpretation of accepted scope. These items are not confirmed contract packages or specifications.

Distribution

Water meters and Fire hydrants

Pumping and storage

Water well drilling and Water storage tank

Process and controls

Electrical and controls

Civil and site work

Trenching and restoration

Key official milestones

  1. Official event

    Council considers engineering and USDA planning support

    Council minutes document engineering-services and possible USDA SEARCH grant work for the water system master plan.

    View evidence for Council considers engineering and USDA planning support
  2. Official event

    Added during OHA's 3Q2026 DWSRF priority-list cycle

    OHA lists the project for DWSRF funding consideration; the workbook does not establish a formal procurement date.

    View evidence for Added during OHA's 3Q2026 DWSRF priority-list cycle
Evidence and sources
10 accepted claims across 3 official document versions
Selected official evidence · Inspect exact excerpts and locators

2026 Q3 Combined Base DWSRF and IIJA General Supplemental PPL

OHA DWSRF infrastructure project priority list
Inspect exact excerpt and locator
“11 | City of Weston SD-26-12 Umatilla Ryan DeGrofft / Gail Nelson 714 | | Issue: The water system has one well and experience areas of town where the 20psi is not maintained at all times. This is documented in the draft WSMP. Project: The project entails: ...”

Weston City Council minutes — February 14, 2024

Weston City Council water-system planning minutes
Inspect exact excerpt and locator
“Brad Baird from Anderson Perry presented information in addition to an updated engineering services contract for possible USDA Search Grant for the water system master plan. An agreement for professional series for the development code codification and refo...”