Location
Oregon
Project code
7207

ITB - Foothill Drive Sanitary Sewer Upgrade Project No. 7207

The Project consists of the following work: This Project consists of upsizing an existing 1,587 linear feet, 10-inch sanitary sewer line to a 14-inch sanitary sewer line through the pipebursting method within Commonwealth Lake Park.

Last verified Oct 9, 2026 2 official source families

What is proposed

The Project consists of the following work: This Project consists of upsizing an existing 1,587 linear feet, 10-inch sanitary sewer line to a 14-inch sanitary sewer line through the pipebursting method within Commonwealth Lake Park.

FY2026–27 adopted budget lists $910,000 for Foothill project 7207

The adopted budget lists $910,000 FY27 for project 7207 in Fund 112, Sanitary Sewer Construction Fund. This is an owner budget allocation, not an external funding award or contractor amount. July 1 represents the fiscal-year boundary; the exact adoption/publication date is not established here.

Verified award outcome, executed contract and actual construction progression

Timing is not established in reviewed records.

Confirmed work and commercial interpretation

What is proposed

The Project consists of the following work: This Project consists of upsizing an existing 1,587 linear feet, 10-inch sanitary sewer line to a 14-inch sanitary sewer line through the pipebursting method within Commonwealth Lake Park.

Potential commercial work

Waterline IQ interpretation of accepted scope. These items are not confirmed contract packages or specifications.

Wastewater collection

Gravity sewer main and Sewer piping

Documented permitting

Permit records have not been captured; requirements and approval remain unverified.

Key official milestones

  1. Official event

    FY23 planning began for Commonwealth Lake sewer capacity upgrade

    The proposed FY2027–2031 CIP retrospectively reports planning began in FY23 (FY2022–23). The stored July 1 date represents the fiscal-year boundary, not an actual action/publication date. Planning scope was 1,587 LF from 10-inch to 12-inch within Commonwealth Lake Park; the later formal procurement specifies 14-inch.

    View evidence for FY23 planning began for Commonwealth Lake sewer capacity upgrade
  2. Official event

    Official solicitation scope changed

    ITB - Foothill Drive Sanitary Sewer Upgrade Project No. 7207: The official record establishes a formal response path. Responses due 2026-07-14.

    View evidence for Official solicitation scope changed
  3. Official event

    FY2026–27 adopted budget lists $910,000 for Foothill project 7207

    The adopted budget lists $910,000 FY27 for project 7207 in Fund 112, Sanitary Sewer Construction Fund. This is an owner budget allocation, not an external funding award or contractor amount. July 1 represents the fiscal-year boundary; the exact adoption/publication date is not established here.

    View evidence for FY2026–27 adopted budget lists $910,000 for Foothill project 7207
Evidence and sources
3 accepted claims across 4 official document versions
Selected official evidence · Inspect exact excerpts and locators

Fiscal Year 2026-27: FY 2026-27 Adopted Budget

Clean Water Services budgets and capital planning publications
Inspect exact excerpt and locator
“FOOTHILL DR (COMMONWEALTH LAKE) SANITARY UPGRADE 7207 112 750,000 130,000 910,000 - - - - 910,000”

Fiscal Year 2026-27: FY 2027-2031 Capital Improvement Plan

Clean Water Services budgets and capital planning publications
Inspect exact excerpt and locator
“Project Detail Project Name: FOOTHILL DR (COMMONWEALTH LAKE) SANITARY UPGRADE Project Number: 7207 Project Subtype: Sanitary Collection System Fund: 112 - Sanitary Sewer Construction Fund Project Manager: Doug Gresham Project Status: Open Department/Program...”

ITB - Foothill Drive Sanitary Sewer Upgrade Project No. 7207 — 6119

Clean Water Services formal opportunities
Inspect exact excerpt and locator
“ITB - Foothill Drive Sanitary Sewer Upgrade Project No. 7207”