Initial record from an official solicitation. Earlier planning history, funding and award are not yet established.

Location
St. Helens, Oregon
Project code
W-487

PARK ST WATER MAIN REPLACEMENT

The PARK ST WATER MAIN REPLACEMENT Project is for the the installation of over 520 linear feet of 6-inch diameter Class 52 ductile iron water main complete with the installation of new gate valves, permanent blow-off assembly and all required fittings, bends, tees, and appurtenances. Work also includes the removal and replacement of a fire hydrant assembly, reconnection of ten water services, the abandonment of existing water main in-place, the installation, maintenance, and removal of temporary traffic control and erosion control measures, rock excavation, roadway paving. and the removal and replacement of existing landscaping, and concrete surfaces.

Last verified Oct 13, 2026 1 official source family

What is proposed

The PARK ST WATER MAIN REPLACEMENT Project is for the the installation of over 520 linear feet of 6-inch diameter Class 52 ductile iron water main complete with the installation of new gate valves, permanent blow-off assembly and all required fittings, bends, tees, and appurtenances. Work also includes the removal and replacement of a fire hydrant assembly, reconnection of ten water services, the abandonment of existing water main in-place, the installation, maintenance, and removal of temporary traffic control and erosion control measures, rock excavation, roadway paving. and the removal and replacement of existing landscaping, and concrete surfaces.

Formal procurement opportunity published

PARK ST WATER MAIN REPLACEMENT: The PARK ST WATER MAIN REPLACEMENT Project is for the the installation of over 520 linear feet of 6-inch diameter Class 52 ductile iron water main complete with the installation of new gate valves, permanent blow-off assembly and all required fittings, bends, tees, and appurtenances. Work also includes the removal and replacement of a fire hydrant assembly, reconnection of ten water services, the abandonment of existing water main in-place, the installation, maintenance, and removal of temporary traffic control and erosion control measures, rock excavation, roadway paving. and the removal and replacement of existing landscaping, and concrete surfaces. Responses due 2026-11-10.

Official response deadline

Timing is not established in reviewed records.

Confirmed work and commercial interpretation

What is proposed

The PARK ST WATER MAIN REPLACEMENT Project is for the the installation of over 520 linear feet of 6-inch diameter Class 52 ductile iron water main complete with the installation of new gate valves, permanent blow-off assembly and all required fittings, bends, tees, and appurtenances. Work also includes the removal and replacement of a fire hydrant assembly, reconnection of ten water services, the abandonment of existing water main in-place, the installation, maintenance, and removal of temporary traffic control and erosion control measures, rock excavation, roadway paving. and the removal and replacement of existing landscaping, and concrete surfaces.

Potential commercial work

Waterline IQ interpretation of accepted scope. These items are not confirmed contract packages or specifications.

Distribution

Water main replacement

Documented permitting

Permit records have not been captured; requirements and approval remain unverified.

Key official milestones

  1. Official event

    Formal procurement opportunity published

    PARK ST WATER MAIN REPLACEMENT: The PARK ST WATER MAIN REPLACEMENT Project is for the the installation of over 520 linear feet of 6-inch diameter Class 52 ductile iron water main complete with the installation of new gate valves, permanent blow-off assembly and all required fittings, bends, tees, and appurtenances. Work also includes the removal and replacement of a fire hydrant assembly, reconnection of ten water services, the abandonment of existing water main in-place, the installation, maintenance, and removal of temporary traffic control and erosion control measures, rock excavation, roadway paving. and the removal and replacement of existing landscaping, and concrete surfaces. Responses due 2026-11-10.

    View evidence for Formal procurement opportunity published
Evidence and sources
1 accepted claims across 1 official document version
Selected official evidence · Inspect exact excerpts and locators

PARK ST WATER MAIN REPLACEMENT

St. Helens public bid discovery
Inspect exact excerpt and locator
“Skip to Main Content Create a Website Account - Manage notification subscriptions, save form progress and more. Website Sign In Search HomeBid Postings Print Sign up to receive a text message or email when new bids are added! Print Bid Number: W-487 Bid Tit...”