Reviewed project signal · Procurement
Formal procurement opportunity published
Ashland Water Treatment Plant: The City of Ashland is requesting Bids for the construction of the Ashland Creek Water Treatment Plant. The Project includes the Construction of a new drinking water treatment plant including raw water conveyance, pressure reduction, chemical pretreatment equipment, filtration, filtered water storage and pumping, chemical storage and metering, water and sewer lines, and all other work described in the contract documents for a complete and functioning system.
Waterline IQ interpretation
What this changes.
The formal pursuit window is active or has materially changed.
Suggested next step · at review
Where to focus next.
Review the solicitation, shortlist, and dates now; make a documented pursue-or-pass decision.
The official record
The evidence behind the signal.
Oregon public agencies via OregonBuys
Source document
Ashland Water Treatment Plant
Table row on the official webpage
Retrieved Oct 4, 2026
Read official document ↗Source excerpt · Scroll to read in full
Bid Number: S-KA0010-00018090 Description: Ashland Water Treatment Plant Bid Opening Date: 11/05/2026 01:00:00 PM Purchaser: Scott Fleury Organization: City of Ashland Department: KA001006 - Public Works Location: KA002 - Engineering Fiscal Year: 27 Allow Electronic Quote: No Alternate Id: 2018-20 Required Date: 11/05/2026 Available Date : 09/29/2026 01:00:00 PM Info Contact: Scott Fleury, 541-488-5587, [email protected] Bid Type: OPEN Informal Bid Flag: No Purchase Method: Open Market Pre Bid Conference: Mandatory pre-bid conference for the Project will be held on Tuesday, October 13, 2026 at 10:00 AM at the Community Development building located at 51 Winburn Way, Ashland, OR 97520. Bulletin Desc: The City of Ashland is requesting Bids for the construction of the Ashland Creek Water Treatment Plant. The Project includes the Construction of a new drinking water treatment plant including raw water conveyance, pressure reduction, chemical pretreatment equipment, filtration, filtered water storage and pumping, chemical storage and metering, water and sewer lines, and all other work described in the contract documents for a complete and functioning system. Ship-to Address: Scott Fleury51 Winburn WayAshland, OR 97520USEmail: Phone: (541) 552-2412 Bill-to Address: Scott Fleury51 Winburn WayAshland, OR 97520USEmail: Phone: (541) 552-2412 Print Format: Bid Print New File Attachments: WTP Bid Advertisement.pdf City-of-Ashland_WTP_IFB-Specs_09252026-Front End Vol 1.pdf City-of-Ashland_WTP_IFB-Specs_09252026-Back End Vol 2.pdf City-of-Ashland_WTP_IFB-Drawings_09252026.pdf COA Prequal Application-2025-27~2.pdf Form Attachments: Required Quote Attachments Desired Attachment Name Description Discipline Type: Public Improvement Procurement Method: Competitive Sealed Bid Item Information Item # 1: ( 913 - 60 ) The City of Ashland is requesting Bids for the construction of the Ashland Creek Water Treatment Plant. The Project includes the construction of a new drinking water treatment plant including raw water conveyance, pressure reduction, chemical pretreatment equipment, filtration, filtered water storage and pumping, chemical storage and metering, water and sewer lines, and all other work described in the contract documents for a complete and functioning system. NIGP Code: 913-60 Construction, Water System, Plants, Main and Service Line Qty Unit Cost UOM Total Discount Amt. Total Cost 1.0 EA - Each Manufacturer: Brand: Model: Make: Packaging: Item # 2: ( 913 - 92 ) The City of Ashland is requesting Bids for the construction of the Ashland Creek Water Treatment Plant. The Project includes the construction of a new drinking water treatment plant including raw water conveyance, pressure reduction, chemical pretreatment equipment, filtration, filtered water storage and pumping, chemical storage and metering, water and sewer lines, and all other work described in the contract documents for a complete and functioning system NIGP Code: 913-92 Maintenance and Repair, Water System, Main and Service Line Qty Unit Cost UOM Total Discount Amt. Total Cost 1.0 EA - Each Manufacturer: Brand: Model: Make: Packaging: Item # 3: ( 909 - 30 ) The City of Ashland is requesting Bids for the construction of the Ashland Creek Water Treatment Plant. The Project includes the construction of a new drinking water treatment plant including raw water conveyance, pressure reduction, chemical pretreatment equipment, filtration, filtered water storage and pumping, chemical storage and metering, water and sewer lines, and all other work described in the contract documents for a complete and functioning system NIGP Code: 909-30 Building Construction, (Not Otherwise Classified) Qty Unit Cost UOM Total Discount Amt. Total Cost 1.0 EA - Each Manufacturer: Brand: Model: Make: Packaging: Copyright © 2026 Periscope Holdings, Inc. - All Rights Reserved. window.dataLayer = window.dataLayer || []; window.dataLayer.push({ 'event': 'uxToggle', 'uxChosen': 'old' }); (function(w,d,s,l,i) { w[l]=w[l]||[]; w[l].push( { 'gtm.start': new Date().getTime(), event:'gtm.js' } ); let f=d.getElementsByTagName(s)[0], j=d.createElement(s),dl=l!='dataLayer'?'&l='+l:''; j.async=true; j.src= 'https://www.googletagmanager.com/gtm.js?id='+i+dl; f.parentNode.insertBefore(j,f); })(window,document,'script','dataLayer','GTM-TDBMP45Z');
Project intelligence · subscriber access
Ashland Water Treatment Plant Resilience Project
The solicitations for this work are free to browse. The project behind them is Waterline IQ intelligence for subscribers.
- Where it stands across planning, funding, design, permitting, procurement and construction
- Every procurement, past and planned, and the next checkpoint
- Who is involved, what changed and what is still unknown
- The official source behind every fact
New purchasing organizations: 14 days · $0 today · card required