Reviewed project signal · Funding signal
Added during OHA's 3Q2026 DWSRF priority-list cycle
OHA lists the project for DWSRF funding consideration; the workbook does not establish a formal procurement date.
Waterline IQ interpretation
What this changes.
The project has entered an official funding pipeline, improving credibility without confirming an award.
Suggested next step · at review
Where to focus next.
Verify whether treatment and distribution work will be packaged together and who is leading preliminary engineering.
The official record
The evidence behind the signal.
Oregon Health Authority
Source document
2026 Q3 Combined Base DWSRF and IIJA General Supplemental PPL
2026 COMBINED (H&C&C) PPL!A25:S25
Retrieved Jul 14, 2026
Read official document ↗Source excerpt · Scroll to read in full
11 | City of Port Orford SD-26-18 Curry Christopher Frazier / Tawni Bean 1,200 | | Issue: Aging and failing WTP infrastructure, specifically: - Failing tube settlers and filter media - Nonfunctional SCADA emergency callouts - Backwash/scour system unable to properly clean filters - Structural deterioration and near failure of part of the treatment train. Severe leaks and failure of the distribution lines: - Two of the major drinking water distribution lines are leaking over 50% of their flow. These lines are also prone to break, creating reliability and maintenance problems. Project: The project is to replace failing components of the City of Port Orford’s Water Treatment Plant and to replace two of the City’s most leak prone drinking water distribution lines. | | | | | Treatment Distribution/Trans. Engineering | 6682594 | 1500000 | 6682594 | 1500000 | To be confirmed at the time of invitation to apply and subject to subsidy availability. Disadvantaged communities may qualify for up to $1,500,000 in forgivable loan funding, or 50% of total project costs (whichever is lower), and interest rates as low as 1%. | Yes | 2026 (LOI expires on TBD) | 3Q2026 | 53 | Rating results include: 15 pts (Health Risk) due to leaking pipes throughout system which prevents system from keeping pressure consistently above 20 psi. 10 pts (Compliance) due to the project mitigating the pressure related issues to keep system in compliance. 0 pts (Consolidation) 25 pts (Affordability) 3 pts (Water System Size)
Project intelligence · subscriber access
Port Orford Water Treatment Plant and Distribution Line Improvements
The solicitations for this work are free to browse. The project behind them is Waterline IQ intelligence for subscribers.
- Where it stands across planning, funding, design, permitting, procurement and construction
- Every procurement, past and planned, and the next checkpoint
- Who is involved, what changed and what is still unknown
- The official source behind every fact
New purchasing organizations: 14 days · $0 today · card required