Supporting official record
2026 Q3 Combined Base DWSRF and IIJA General Supplemental PPL
Oregon Health Authority · 2026 COMBINED (H&C&C) PPL!A22:S22
This passage is cited in Waterline IQ’s reviewed records. Read it alongside the project history to understand the fact it supports and what remains unresolved.
The cited passage
“9 | City of Junction City SD-25-451 Lane Heather Stevens / Carolyn Craig 7,000 | | Issue: a.) Loss of water production from wells, b.) Inefficiency of wells c.) Water distribution lines leaks d.) “Front Well” E.coli and nitrate contamination. Project: a.) Due to loss of water production from...”Read the official document
Opens the publisher’s record in a new tab. The passage is an extract; use the original document for the surrounding context.
Saved excerpt and document details
The full captured excerpt is preserved below, including any partial sentences at its boundaries.
9 | City of Junction City SD-25-451 Lane Heather Stevens / Carolyn Craig 7,000 | | Issue: a.) Loss of water production from wells, b.) Inefficiency of wells c.) Water distribution lines leaks d.) “Front Well” E.coli and nitrate contamination. Project: a.) Due to loss of water production from wells, the system requires a new well to be drilled (Raintree Well) to provide at least 1000 gpm for the community. b.) To improve efficiency of other wells variable frequency drives and emergency power generators are needed to be installed. c.) Water distribution lines containing asbestos, steel, and lead-jointed cast iron leak and require replacement. d.) Front Well needs proper abandonment due to E.coli and nitrate contamination. | | | | | Distribution/Trans. Source | 8380553 | 650000 | 8380553 | 1500000 | To be confirmed at the time of invitation to apply and subject to subsidy availability. Disadvantaged communities may qualify for up to $1,500,000 in forgivable loan funding, or 50% of total project costs (whichever is lower), and interest rates as low as 1%. | Yes | 2025 (LOI expires on TBD) | 3Q2025 | 56 | Rating results include: 40 pts (Health Risk) Abandonment of E.coli and nitrate contaminated well, removal of asbestos and cast iron jointed cast iron pipes. 10 pts (Compliance) Abandonment of E.coli contaminated well, replace leaking distribution documented in prelim engineering report. 0 pts (Consolidation) 5 pts (Affordability) 1 pts (Water System Size)
- Retrieved
- July 14, 2026 18:34
- Source location
- 2026 COMBINED (H&C&C) PPL!A22:S22
- Document version fingerprint (SHA-256)
b9057387bb5476a629adc37193aa704e21ab14bc0c01e2e08539ede447fca4b7
This fingerprint identifies the saved document version. The publisher’s current file may have changed since retrieval.