Supporting official record
2026 Q3 Combined Base DWSRF and IIJA General Supplemental PPL — public-comment PDF
Oregon Health Authority · PDF page 3
This passage is cited in Waterline IQ’s reviewed records. Read it alongside the project history to understand the fact it supports and what remains unresolved.
The cited passage
“d pump it once or twice a week up to the storage tank. City of Milwaukie Issue: PFAS detections above MCL, treatment required to reduce Rating results include: SD-25-454 levels below MCL by 2029. Aging/obsolete VOC treatment (potentially 30 pts (Health Risk) Chronic MCL at end of life). The gas...”Read the official document · page 3
Opens the publisher’s record in a new tab. The passage is an extract; use the original document for the surrounding context.
Saved excerpt and document details
The full captured excerpt is preserved below, including any partial sentences at its boundaries.
d pump it once or twice a week up to the storage tank. City of Milwaukie Issue: PFAS detections above MCL, treatment required to reduce Rating results include: SD-25-454 levels below MCL by 2029. Aging/obsolete VOC treatment (potentially 30 pts (Health Risk) Chronic MCL at end of life). The gas chlorine treatment has minimal safety controls exceedances for EC (PFAS) Clackamas Jeff Hampton / Matt Mattia and has been identified by emergency responders with concerns 20 pts (Compliance) Must install 20,946 about response capabilities. treatment to reduce levels to below Project: Treatment Project: MCL by 2029 (future deadline) a.) Install PFAS treatment for at least 5 wells (method determined by 0 pts (Consolidation) PFAS feasibility study) Replace gas chlorination with hypochlorite 10 pts (Affordability) based disinfection. 0 pts (Water System Size) b.) Upgrade VOC air stripping tower for seismic resilience, reliability, To be confirmed at the time and efficiency. of invitation to apply and c.) Improve clearwells to reduce risk of exterior contaminants. subject to subsidy Relocate backup generators from on top of clearwells. Treatment availability. Disadvantaged 2025 8 d.) Reconfigure treatment structures, electrical equipment and Source $27,170,000 $650,000 $10,000,000 $1,500,000 communities may qualify (LOI expires on 3Q2025 mechanical equipment to support above changes. Pump Stations for up to $1,500,000 in Yes TBD) 60 e.) Evaluate Well 8 to determine if it can be rehabilitat
- Retrieved
- July 14, 2026 20:08
- Source location
- PDF page 3
- Document version fingerprint (SHA-256)
8010b94ca72a797080071cd90ad62855c3a3255d8a0a3b9ea1375f7e2b28cf38
This fingerprint identifies the saved document version. The publisher’s current file may have changed since retrieval.