2026 Q3 Combined Base DWSRF and IIJA General Supplemental PPL — public-comment PDF

Oregon Health Authority · PDF page 3

This passage is cited in Waterline IQ’s reviewed records. Read it alongside the project history to understand the fact it supports and what remains unresolved.

The cited passage

“funding, or 50% of total project costs (whichever is lower), and interest rates at 80% of the market rate. City of Junction City Issue: Rating results include: SD-25-451 a.) Loss of water production from wells, 40 pts (Health Risk) Abandonment of Lane b.) Inefficiency of wells E.coli and nitrate...”
Read the official document · page 3

Opens the publisher’s record in a new tab. The passage is an extract; use the original document for the surrounding context.

Saved excerpt and document details

The full captured excerpt is preserved below, including any partial sentences at its boundaries.

funding, or 50% of total project costs (whichever is lower), and interest rates at 80% of the market rate. City of Junction City Issue: Rating results include: SD-25-451 a.) Loss of water production from wells, 40 pts (Health Risk) Abandonment of Lane b.) Inefficiency of wells E.coli and nitrate contaminated well, c.) Water distribution lines leaks removal of asbestos and cast iron Heather Stevens / Carolyn Craig d.) “Front Well” E.coli and nitrate contamination. To be confirmed at the time jointed cast iron pipes. 7,000 Project: of invitation to apply and 10 pts (Compliance) Abandonment of a.) Due to loss of water production from wells, the system requires a subject to subsidy E.coli contaminated well, replace new well to be drilled (Raintree Well) to provide at least 1000 gpm for availability. Disadvantaged 2025 leaking distribution documented in the community. Distribution/Trans. communities may qualify prelim engineering report. 9 b.) To improve efficiency of other wells variable frequency drives and Source $8,380,553 $650,000 $8,380,553 $1,500,000 for up to $1,500,000 in Yes (LOI expires on 3Q2025 56 0 pts (Consolidation) forgivable loan funding, or TBD) emergency power generators are needed to be installed. 5 pts (Affordability) c.) Water distribution lines containing asbestos, steel, and lead-jointed 50% of total project costs 1 pts (Water System Size) cast iron leak and require replacement. (whichever is lower), and d.) Front Well needs proper abandonment due to E.col
Retrieved
July 14, 2026 20:08
Source location
PDF page 3
Document version fingerprint (SHA-256)
8010b94ca72a797080071cd90ad62855c3a3255d8a0a3b9ea1375f7e2b28cf38

This fingerprint identifies the saved document version. The publisher’s current file may have changed since retrieval.