Supporting official record
2026 Q3 Combined Base DWSRF and IIJA General Supplemental PPL — public-comment PDF
Oregon Health Authority · PDF page 6
This passage is cited in Waterline IQ’s reviewed records. Read it alongside the project history to understand the fact it supports and what remains unresolved.
The cited passage
“is lower), and interest rates as low as 1%. City of Milton-Freewater Issue: Existing wells operate at near capacity during peak demand Rating results include: SD-26-15 after well #9 was taken out of service. Middle reservoir nearing end of 15 pts (Health Risk) due to middle Umatilla useful life...”Read the official document · page 6
Opens the publisher’s record in a new tab. The passage is an extract; use the original document for the surrounding context.
Saved excerpt and document details
The full captured excerpt is preserved below, including any partial sentences at its boundaries.
is lower), and interest rates as low as 1%. City of Milton-Freewater Issue: Existing wells operate at near capacity during peak demand Rating results include: SD-26-15 after well #9 was taken out of service. Middle reservoir nearing end of 15 pts (Health Risk) due to middle Umatilla useful life and documented storage deficit in middle pressure zone. reservoir nearing end of useful life as Project: Drill well #10, construct new reservoir to replace existing documented in 2022 water storage Ryan DeGrofft / Gail Nelson middle reservoir. To be confirmed at the time study. 7,145 of invitation to apply and subject to subsidy 0 pts (Compliance) 0 pts (Consolidation) Storage availability. Disadvantaged 2026 25 pts (Affordability) Source $4,028,800 $1,500,000 $4,028,800 $1,500,000 communities may qualify (LOI expires on 3Q2026 1 pts (Water System Size) 16 for up to $1,500,000 in Yes 41 Engineering forgivable loan funding, or TBD) 50% of total project costs (whichever is lower), and interest rates as low as 1%. Maple Elsie Water Service Issue: Old, leaky and fragile distribution system. No service meters Rating results include: and few valves. System also has insufficient groundwater supply and 15 pts (Health Risk) due to the SD-26-09 Clatsop is on frequent boil water notices. unreliability of the system. These issues Melanie Olson / Melinda Hautala Project: are documented and demonstrated in 100 • Alternative 1: Transition from GW to SW. Install bag filters. Replace To be confirmed a
- Retrieved
- July 14, 2026 20:08
- Source location
- PDF page 6
- Document version fingerprint (SHA-256)
8010b94ca72a797080071cd90ad62855c3a3255d8a0a3b9ea1375f7e2b28cf38
This fingerprint identifies the saved document version. The publisher’s current file may have changed since retrieval.