Supporting official record
Salem Willow Lake north secondary clarifier rehabilitation
Oregon public agencies via OregonBuys · Official webpage passage
This passage is cited in Waterline IQ’s reviewed records. Read it alongside the cited record to understand the fact it supports and what remains unresolved.
The cited passage
“New File Attachments: Intent to Award Willow Lake Water Pollution Control Facility North Secondary Clarifier Rehabilitation Project Bid Opening Bid No 212069 Zoom Meeting Addendum Number 1 Supplemental Letter 1 Addendum Number 2 Bid Register Form Attachments: Required Quote Attachments Desired...”Read the official document
Opens the publisher’s record in a new tab. The passage is an extract; use the original document for the surrounding context.
Saved excerpt and document details
The full captured excerpt is preserved below, including any partial sentences at its boundaries.
New File Attachments: Intent to Award Willow Lake Water Pollution Control Facility North Secondary Clarifier Rehabilitation Project Bid Opening Bid No 212069 Zoom Meeting Addendum Number 1 Supplemental Letter 1 Addendum Number 2 Bid Register Form Attachments: Required Quote Attachments Desired Attachment Name Description Discipline Type: Public Improvement Procurement Method: Competitive Sealed Bid Amendments: Amendment # Amendment Date Amendment Note 1 08/10/2021 08:58:44 AM Attachment File Changes: Header 1. File 'Bid Opening Bid No 212069 Zoom Meeting': File 'Bid Opening Bid No 212069 Zoom Meeting' added . 2 08/11/2021 01:44:43 PM Addendum Number 1 Attachment File Changes: Header 1. File 'Addendum Number 1': File 'Addendum Number 1' added . See attachment. 3 08/12/2021 04:01:16 PM Bid date change Attachment File Changes: Header 1. File 'Supplemental Letter 1': File 'Supplemental Letter 1' added . Bid date change 4 08/13/2021 03:03:17 PM Change of Bid Date Header 1. Bid Opening Date changed from "08/17/2021 02:30:00 PM" to "08/24/2021 02:30:00 PM". 5 08/18/2021 02:32:09 PM Attachment File Changes: Header 1. File 'Addendum Number 2': File 'Addendum Number 2' added . 6 09/15/2021 01:31:45 PM Bid Registere Attachment File Changes: Header 1. File 'Bid Register': File 'Bid Register' added . 2. File 'Intent to Award': File 'Intent to Award' added . Item Information Item # 1: ( 913 - 59 ) The Work under this contract consists of the removal and replacement of the existing North Secondary clarifier mechanism, weir, scum baffle, spray system, scum beach/trough, bridge and all other items associated with the clarifier mechanism to make a complete and operational clarifier mechanism; demolition of cable piers around the perimeter of the tank; clarifier center pier structural improvements; electrical controls and wiring; site electrical and instrumentation and control including new conduits for power and signal wiring to the clarifier drive, new power feed and signal conductors to the mechanism drive, concrete slab and wall rehabilitation and grout repair within the clarifier; demolition of necessary surface improvements to replace a 48-inch with a 72-inch pipe; temporary relocation of existing buried utilities within the work area and replacement within the original location at the conclusion of pipe backfilling; backfill and replacement of surface improvements within the disturbed area; removal recalibration and re-installation of the propeller flow meter at the flow control box; together with all appurtenances. NIGP Code: 913-59 Construction and Upgrades, Wastewater Treatment Plant Qty Unit Cost UOM Total Discount Amt. Total Cost 1.0 EA - Each Manufacturer: Brand: Model: Make: Packaging: Copyright © 2026 Periscope Holdings, Inc. - All Rights Reserved. window.dataLayer = window.dataLayer || []; window.dataLayer.push({ 'event': 'uxToggle', 'uxChosen': 'old' }); (function(w,d,s,l,i) { w[l]=w[l]||[]; w[l].push( { 'gtm.start': new Date().getTime(), event:'gtm.js' } ); let f=d.getElementsByTagName(s)[0], j=d.createElement(s),dl=l!='dataLayer'?'&l='+l:''; j.async=true; j.src= 'https://www.googletagmanager.com/gtm.js?id='+i+dl; f.parentNode.insertBefore(j,f); })(window,document,'script','dataLayer','GTM-TDBMP45Z');
- Retrieved
- July 22, 2026 01:02
- Source location
- body:nth-of-type(1) > form#bidDetail:nth-of-type(1) > table:nth-of-type(1) > tbody:nth-of-type(1) > tr:nth-of-type(1)
- Document version fingerprint (SHA-256)
9027f74c82d4384b655f9cf9d7eec305ca21af624120c1d923c14f245697fe03
This fingerprint identifies the saved document version. The publisher’s current file may have changed since retrieval.