Skip to main content
Waterline IQ — Water Infrastructure

Supporting official record

Salem Willow Lake WPCF bar screen No. 3

Oregon public agencies via OregonBuys · Official webpage passage

This passage is cited in Waterline IQ’s reviewed records. Read it alongside the cited record to understand the fact it supports and what remains unresolved.

The cited passage

“New File Attachments: Bid Tabulation Intent to Award Letter Project Manual Drawings Mandatory PreBid Conference Attendance Sign-In 212168 Bid Opening Zoom Link.pdf Preliminary Results Form Attachments: Required Quote Attachments Desired Attachment Name Description Discipline Type: Public...”
Read the official document

Opens the publisher’s record in a new tab. The passage is an extract; use the original document for the surrounding context.

Saved excerpt and document details

The full captured excerpt is preserved below, including any partial sentences at its boundaries.

New File Attachments: Bid Tabulation Intent to Award Letter Project Manual Drawings Mandatory PreBid Conference Attendance Sign-In 212168 Bid Opening Zoom Link.pdf Preliminary Results Form Attachments: Required Quote Attachments Desired Attachment Name Description Discipline Type: Public Improvement Procurement Method: Competitive Sealed Bid Amendments: Amendment # Amendment Date Amendment Note 1 04/18/2022 04:26:19 PM Attachment File Changes: Header 1. File 'Mandatory PreBid Conference Attendance Sign-In': File 'Mandatory PreBid Conference Attendance Sign-In' added . 2 04/25/2022 01:36:36 PM Bid Opening Zoom Link Attachment File Changes: Header 1. File '212168 Bid Opening Zoom Link.pdf': File '212168 Bid Opening Zoom Link.pdf' added . Bid Opening Zoom Link 3 05/03/2022 03:23:39 PM Attachment File Changes: Header 1. File 'Preliminary Results': File 'Preliminary Results' added . 4 05/12/2022 08:36:20 AM Attachment File Changes: Header 1. File 'Bid Tabulation': File 'Bid Tabulation' added . 2. File 'Intent to Award Letter': File 'Intent to Award Letter' added . Item Information Item # 1: ( 913 - 59 ) The Work under this Contract consists of supplying and installing bar screen No. 3 (4th bar screen) in an existing channel at the headworks of the facility. This includes the connection of the new bar screen to the existing screenings conveyor, and all necessary electrical and control connections for startup and commissioning. NIGP Code: 913-59 Construction and Upgrades, Wastewater Treatment Plant Qty Unit Cost UOM Total Discount Amt. Total Cost 1.0 EA - Each Manufacturer: Brand: Model: Make: Packaging: Copyright © 2026 Periscope Holdings, Inc. - All Rights Reserved. window.dataLayer = window.dataLayer || []; window.dataLayer.push({ 'event': 'uxToggle', 'uxChosen': 'old' }); (function(w,d,s,l,i) { w[l]=w[l]||[]; w[l].push( { 'gtm.start': new Date().getTime(), event:'gtm.js' } ); let f=d.getElementsByTagName(s)[0], j=d.createElement(s),dl=l!='dataLayer'?'&l='+l:''; j.async=true; j.src= 'https://www.googletagmanager.com/gtm.js?id='+i+dl; f.parentNode.insertBefore(j,f); })(window,document,'script','dataLayer','GTM-TDBMP45Z');
Retrieved
July 22, 2026 01:02
Source location
body:nth-of-type(1) > form#bidDetail:nth-of-type(1) > table:nth-of-type(1) > tbody:nth-of-type(1) > tr:nth-of-type(1)
Document version fingerprint (SHA-256)
65d0659279c1627dc9ecbc5c4d5b33de4fda60048635b2a0790ace1434eae62b

This fingerprint identifies the saved document version. The publisher’s current file may have changed since retrieval.