Skip to main content
Waterline IQ — Water Infrastructure

Supporting official record

Ashland Wastewater Treatment Plant Headworks Upgrade

Oregon public agencies via OregonBuys · Official webpage passage

This passage is cited in Waterline IQ’s reviewed records. Read it alongside the cited record to understand the fact it supports and what remains unresolved.

The cited passage

“Bid Number: S-KA0010-00017932 Description: Ashland Wastewater Treatment Plant Headworks Upgrade Bid Opening Date: 10/08/2026 01:00:00 PM Purchaser: Chance Metcalf Organization: City of Ashland Department: KA001006 - Public Works Location: KA002 - Engineering Fiscal Year: 27 Allow Electronic...”
Read the official document

Opens the publisher’s record in a new tab. The passage is an extract; use the original document for the surrounding context.

Saved excerpt and document details

The full captured excerpt is preserved below, including any partial sentences at its boundaries.

Bid Number: S-KA0010-00017932 Description: Ashland Wastewater Treatment Plant Headworks Upgrade Bid Opening Date: 10/08/2026 01:00:00 PM Purchaser: Chance Metcalf Organization: City of Ashland Department: KA001006 - Public Works Location: KA002 - Engineering Fiscal Year: 27 Allow Electronic Quote: No Alternate Id: 2024-02 Required Date: 10/08/2026 Available Date : 09/09/2026 07:59:49 AM Info Contact: Chance Metcalf, 541-552-2448, [email protected] Bid Type: OPEN Informal Bid Flag: No Purchase Method: Open Market Pre Bid Conference: The prebid conference is mandatory and will be held on September 21, 2026 at I :00 p.m. local time at the Ashland WWTP, 1195 Oak Street, Ashland, Oregon 97520. Refer to Instructions to Bidders for additional information. Bulletin Desc: Sealed Bids for construction of Ashland Wastewater Treatment Plant Headworks Upgrade. The Project consists of wastewater treatment headworks improvements and includes two new influent screens with associated washer/compactors, a new downstream stacked tray grit removal facility with grit separation and grit slurry pumping equipment, grit classifier, and integral flow splitting to the downstream oxidation ditch aeration basins. Work also included, associated yard piping, electrical and Controls. Ship-to Address: Chance Metcalf51 Winburn WayAshland, OR 97520USEmail: Phone: (541) 552-2448 Bill-to Address: Chance Metcalf51 Winburn WayAshland, OR 97520USEmail: Phone: (541) 552-2448 Print Format: Bid Print New File Attachments: 2024-02 COA WWTP Headworks Upgrade - Pre Bid Agenda.pdf 2024-02 COA WWTP Headworks Upgrade - Pre Bid Sign In.pdf COA Prequal Application-2025-27.pdf 2003 Ashland WWTP Plans.pdf 2024-02 COA WWTP Headworks Upgrade - Addendum_No.1 - 10.1.26.pdf Ashland WWTP Headworks Upgrade -Specs - Final.pdf Ashland WWTP Headworks Upgrade - Stamped_Drawings.pdf Ashland WWTP Headworks Upgrade - Geotechnical Engineering Report_STAMPED.pdf Form Attachments: Required Quote Attachments Desired Attachment Name Description Discipline Type: Public Improvement Procurement Method: Competitive Sealed Bid Amendments: Amendment # Amendment Date Amendment Note 1 09/22/2026 02:33:26 PM Informational Uploads Attachment File Changes: Header 1. File '2024-02 COA WWTP Headworks Upgrade - Pre Bid Agenda.pdf': File '2024-02 COA WWTP Headworks Upgrade - Pre Bid Agenda.pdf' added . 2. File '2024-02 COA WWTP Headworks Upgrade - Pre Bid Sign In.pdf': File '2024-02 COA WWTP Headworks Upgrade - Pre Bid Sign In.pdf' added . 3. File 'COA Prequal Application-2025-27.pdf': File 'COA Prequal Application-2025-27.pdf' added . 4. File '2003 Ashland WWTP Plans.pdf': File '2003 Ashland WWTP Plans.pdf' added . 2 10/02/2026 08:05:17 AM Addendum 1 Attachment File Changes: Header 1. File '2024-02 COA WWTP Headworks Upgrade - Addendum_No.1 - 10.1.26.pdf': File '2024-02 COA WWTP Headworks Upgrade - Addendum_No.1 - 10.1.26.pdf' added . Item Information Item # 1: ( 913 - 59 ) Sealed Bids for construction of Ashland Wastewater Treatment Plant Headworks Upgrades. The Project consists of wastewater treatment headworks improvements and includes two new influent screens with associated washer/compactors, a new downstream stacked tray grit removal facility with grit separation and grit slurry pumping equipment, grit classifier, and integral flow splitting to the downstream oxidation ditch aeration basins. Work also included, associated yard piping, electrical and Controls. NIGP Code: 913-59 Construction and Upgrades, Wastewater Treatment Plant Qty Unit Cost UOM Total Discount Amt. Total Cost 1.0 EA - Each Manufacturer: Brand: Model: Make: Packaging: Item # 2: ( 909 - 30 ) Sealed Bids for construction of Ashland Wastewater Treatment Plant Headworks Upgrades. The Project consists of wastewater treatment headworks improvements and includes two new influent screens with associated washer/compactors, a new downstream stacked tray grit removal facility with grit separation and grit slurry pumping equipment, grit classifier, and integral flow splitting to the downstream oxidation ditch aeration basins. Work also included, associated yard piping, electrical and Controls. NIGP Code: 909-30 Building Construction, (Not Otherwise Classified) Qty Unit Cost UOM Total Discount Amt. Total Cost 1.0 EA - Each Manufacturer: Brand: Model: Make: Packaging: Copyright © 2026 Periscope Holdings, Inc. - All Rights Reserved. window.dataLayer = window.dataLayer || []; window.dataLayer.push({ 'event': 'uxToggle', 'uxChosen': 'old' }); (function(w,d,s,l,i) { w[l]=w[l]||[]; w[l].push( { 'gtm.start': new Date().getTime(), event:'gtm.js' } ); let f=d.getElementsByTagName(s)[0], j=d.createElement(s),dl=l!='dataLayer'?'&l='+l:''; j.async=true; j.src= 'https://www.googletagmanager.com/gtm.js?id='+i+dl; f.parentNode.insertBefore(j,f); })(window,document,'script','dataLayer','GTM-TDBMP45Z');
Retrieved
October 04, 2026 18:10
Source location
body:nth-of-type(1) > form#bidDetail:nth-of-type(1) > table:nth-of-type(1) > tbody:nth-of-type(1) > tr:nth-of-type(1)
Document version fingerprint (SHA-256)
18e93f37d2cef18efa764e49b04f65be3bfacc72462c01bbd1c4a9cd71a9919c

This fingerprint identifies the saved document version. The publisher’s current file may have changed since retrieval.