Skip to main content
Waterline IQ — Water Infrastructure

Supporting official record

RFP for City of Detroit Water System Rehabilitation, Loan Administration, & Civil Engineering — S-Q10041-00016890

Oregon public agencies via OregonBuys · Official webpage passage

This passage is cited in Waterline IQ’s reviewed records. Read it alongside the cited record to understand the fact it supports and what remains unresolved.

The cited passage

“Bid Number: S-Q10041-00016890 Description: RFP for City of Detroit Water System Rehabilitation, Loan Administration, & Civil Engineering Bid Opening Date: 06/04/2026 02:00:00 PM Purchaser: Michelle Connor Organization: City of Detroit Department: Q1004101 - City Hall Location: CH - City Hall...”
Read the official document

Opens the publisher’s record in a new tab. The passage is an extract; use the original document for the surrounding context.

Saved excerpt and document details

The full captured excerpt is preserved below, including any partial sentences at its boundaries.

Bid Number: S-Q10041-00016890 Description: RFP for City of Detroit Water System Rehabilitation, Loan Administration, & Civil Engineering Bid Opening Date: 06/04/2026 02:00:00 PM Purchaser: Michelle Connor Organization: City of Detroit Department: Q1004101 - City Hall Location: CH - City Hall Fiscal Year: 27 Allow Electronic Quote: Yes Alternate Id: Required Date: Available Date : 05/07/2026 02:18:07 PM Info Contact: Bid Type: OPEN Informal Bid Flag: No Purchase Method: Open Market Pre Bid Conference: Bulletin Desc: The project will construct an emergency potable water intertie between Detroit and Idanha. The two communities are located approximately five miles apart. The intertie would consist of approximately 25,000 feet of new water main installed along highway 22, alterations to existing pressure reducing valve stations, a new bidirectional pump station, and a bidirectional flow meter. Water should be able to be pumped back and forth between the treated water reservoirs for both Detroit and Idanha. Ship-to Address: Michelle Connor345 Santiam Ave.Detroit, OR 97342USEmail: [email protected]: (503) 854-3496 Bill-to Address: Michelle Connor345 Santiam Ave.Detroit, OR 97342USEmail: [email protected]: (503) 854-3496 File Attachments: City of Detroit Water System Rehabilitation, Loan Administration, and Civil Engineering RFP RFP Amendment #1 - Extension of RFP deadline Revised RFP Addendum 4 Form Attachments: Required Quote Attachments Desired Attachment Name Description Discipline Type: Public Improvement Procurement Method: Competitive Sealed Proposal Amendments: Amendment # Amendment Date Amendment Note 1 05/18/2026 03:55:12 PM Attachment File Changes: Header 1. File 'RFP Amendment #1 - Extension of RFP deadline': File 'RFP Amendment #1 - Extension of RFP deadline' added . 2 05/19/2026 03:57:59 PM Header 1. Bid Opening Date changed from "05/21/2026 02:00:00 PM" to "05/28/2026 02:00:00 PM". 3 05/27/2026 03:06:30 PM Header 1. Bid Opening Date changed from "05/28/2026 02:00:00 PM" to "06/04/2026 02:00:00 PM". 4 05/29/2026 02:29:11 PM Attachment File Changes: Header 1. File 'Revised RFP': File 'Revised RFP' added . 2. File 'Addendum 4': File 'Addendum 4' added . Item Information Item # 1: ( 925 - 97 ) The proposed project will construct an emergency potable water intertie between Detroit and Idanha. The two communities are located approximately five miles apart. The intertie would consist of approximately 25,000 feet of new water main installed along highway 22, alterations to existing pressure reducing valve stations, a new bidirectional pump station, and a bidirectional flow meter. Water should be able to be pumped back and forth between the treated water reservoirs for both Detroit and Idanha. Phase 1 of this project will be for engineering design and feasibility. Should the project be able to be constructed, phase 2 will consist of construction oversight and construction management of the project designed in phase 1. While only phase 1 work is guaranteed, the owner shall reserve the right to award phase 2 of the project to the winning proposal. NIGP Code: 925-97 Water Supply, Treatment, and Distribution Engineering Qty Unit Cost UOM Total Discount Amt. Total Cost 1.0 EA - Each Manufacturer: Brand: Model: Make: Packaging: Copyright © 2026 Periscope Holdings, Inc. - All Rights Reserved. window.dataLayer = window.dataLayer || []; window.dataLayer.push({ 'event': 'uxToggle', 'uxChosen': 'old' }); (function(w,d,s,l,i) { w[l]=w[l]||[]; w[l].push( { 'gtm.start': new Date().getTime(), event:'gtm.js' } ); let f=d.getElementsByTagName(s)[0], j=d.createElement(s),dl=l!='dataLayer'?'&l='+l:''; j.async=true; j.src= 'https://www.googletagmanager.com/gtm.js?id='+i+dl; f.parentNode.insertBefore(j,f); })(window,document,'script','dataLayer','GTM-TDBMP45Z');
Retrieved
October 04, 2026 18:18
Source location
body:nth-of-type(1) > form#bidDetail:nth-of-type(1) > table:nth-of-type(1) > tbody:nth-of-type(1) > tr:nth-of-type(1)
Document version fingerprint (SHA-256)
b4800e3fac15f4374269b535f288b00c9845fa46966a9b805863bbcc1696fde6

This fingerprint identifies the saved document version. The publisher’s current file may have changed since retrieval.