Skip to main content
Waterline IQ — Water Infrastructure

Supporting official record

2026 Q3 Combined Base DWSRF and IIJA General Supplemental PPL

Oregon Health Authority · 2026 COMBINED (H&C&C) PPL!D25

This passage is cited in Waterline IQ’s reviewed records. Read it alongside the project history to understand the fact it supports and what remains unresolved.

The cited passage

“Issue: Aging and failing WTP infrastructure, specifically: - Failing tube settlers and filter media - Nonfunctional SCADA emergency callouts - Backwash/scour system unable to properly clean filters - Structural deterioration and near failure of part of the treatment train. Severe leaks and...”
Read the official document

Opens the publisher’s record in a new tab. The passage is an extract; use the original document for the surrounding context.

Saved excerpt and document details

The full captured excerpt is preserved below, including any partial sentences at its boundaries.

Issue: Aging and failing WTP infrastructure, specifically: - Failing tube settlers and filter media - Nonfunctional SCADA emergency callouts - Backwash/scour system unable to properly clean filters - Structural deterioration and near failure of part of the treatment train. Severe leaks and failure of the distribution lines: - Two of the major drinking water distribution lines are leaking over 50% of their flow. These lines are also prone to break, creating reliability and maintenance problems. Project: The project is to replace failing components of the City of Port Orford’s Water Treatment Plant and to replace two of the City’s most leak prone drinking water distribution lines.
Retrieved
July 14, 2026 18:34
Source location
2026 COMBINED (H&C&C) PPL!D25
Document version fingerprint (SHA-256)
b9057387bb5476a629adc37193aa704e21ab14bc0c01e2e08539ede447fca4b7

This fingerprint identifies the saved document version. The publisher’s current file may have changed since retrieval.