Skip to main content
Waterline IQ — Water Infrastructure

Supporting official record

Salem Willow Lake hydraulic improvements

Oregon public agencies via OregonBuys · body:nth-of-type(1) > form#bidDetail:nth-of-type(1) > table:nth-of-type(1) > tbody:nth-of-type(1) > tr:nth-of-type(1)

This passage is cited in Waterline IQ’s reviewed records. Read it alongside the project history to understand the fact it supports and what remains unresolved.

The cited passage

“New File Attachments: Bid Tabulation Notice of Intent to Award 234047 Contract Book 234047 Contract Drawings 234047 Record Drawings 234047 Bid Opening Zoom Link.pdf Addendum No. 1 Addendum No. 2 Bid Register Preliminary Results Form Attachments: Required Quote Attachments Desired Attachment Name...”
Read the official document

Opens the publisher’s record in a new tab. The passage is an extract; use the original document for the surrounding context.

Saved excerpt and document details

The full captured excerpt is preserved below, including any partial sentences at its boundaries.

New File Attachments: Bid Tabulation Notice of Intent to Award 234047 Contract Book 234047 Contract Drawings 234047 Record Drawings 234047 Bid Opening Zoom Link.pdf Addendum No. 1 Addendum No. 2 Bid Register Preliminary Results Form Attachments: Required Quote Attachments Desired Attachment Name Description Discipline Type: Public Improvement Procurement Method: Competitive Sealed Bid Amendments: Amendment # Amendment Date Amendment Note 1 07/10/2023 11:39:37 AM Bid Opening Zoom Link Attachment File Changes: Header 1. File '234047 Bid Opening Zoom Link.pdf': File '234047 Bid Opening Zoom Link.pdf' added . 2 07/10/2023 04:31:12 PM Addendum No. 1 Attachment File Changes: Header 1. File 'Addendum No. 1': File 'Addendum No. 1' added . 3 07/13/2023 09:25:50 AM Addendum No. 2 Attachment File Changes: Header 1. File 'Addendum No. 2': File 'Addendum No. 2' added . 4 07/18/2023 04:32:52 PM Attachment File Changes: Header 1. File 'Bid Register Preliminary Results': File 'Bid Register Preliminary Results' added . 5 07/25/2023 08:36:42 AM Attachment File Changes: Header 1. File 'Bid Tabulation': File 'Bid Tabulation' added . 2. File 'Notice of Intent to Award': File 'Notice of Intent to Award' added . Item Information Item # 1: ( 913 - 59 ) Demolishing the existing Return Activated Sludge and South Primary Effluent flumes at the Aeration Mixing box, installing new magnetic flow meters, constructing a new 42-inch force main from the South Primary Pump Station to the Aeration Basin, and all necessary electrical and control connections for startup and commissioning. NIGP Code: 913-59 Construction and Upgrades, Wastewater Treatment Plant Qty Unit Cost UOM Total Discount Amt. Total Cost 1.0 EA - Each Manufacturer: Brand: Model: Make: Packaging: Copyright © 2026 Periscope Holdings, Inc. - All Rights Reserved. window.dataLayer = window.dataLayer || []; window.dataLayer.push({ 'event': 'uxToggle', 'uxChosen': 'old' }); (function(w,d,s,l,i) { w[l]=w[l]||[]; w[l].push( { 'gtm.start': new Date().getTime(), event:'gtm.js' } ); let f=d.getElementsByTagName(s)[0], j=d.createElement(s),dl=l!='dataLayer'?'&l='+l:''; j.async=true; j.src= 'https://www.googletagmanager.com/gtm.js?id='+i+dl; f.parentNode.insertBefore(j,f); })(window,document,'script','dataLayer','GTM-TDBMP45Z');
Retrieved
July 31, 2026 19:11
Source location
body:nth-of-type(1) > form#bidDetail:nth-of-type(1) > table:nth-of-type(1) > tbody:nth-of-type(1) > tr:nth-of-type(1)
Document version fingerprint (SHA-256)
53ebfd075695167d148e81255126e09670a585cec9b6af7454e4226a1e3d6537

This fingerprint identifies the saved document version. The publisher’s current file may have changed since retrieval.