Supporting official record
Cottage Grove Cleveland Ave. Wastewater Pump Station
City of Cottage Grove · Official webpage passage
This passage is cited in Waterline IQ’s reviewed records. Read it alongside the cited record to understand the fact it supports and what remains unresolved.
The cited passage
“The project consists of installing an owner-provided wastewater pump station and standby natural gas generator on Cleveland Avenue, approximately 1,500 feet west of S. 6th Street, and extending the existing pressure and gravity wastewater systems. The work includes excavation and trenching for...”Read the official document
Opens the publisher’s record in a new tab. The passage is an extract; use the original document for the surrounding context.
Saved excerpt and document details
The full captured excerpt is preserved below, including any partial sentences at its boundaries.
The project consists of installing an owner-provided wastewater pump station and standby natural gas generator on Cleveland Avenue, approximately 1,500 feet west of S. 6th Street, and extending the existing pressure and gravity wastewater systems. The work includes excavation and trenching for stormwater, wastewater, and natural gas piping and electrical conduits, along with the installation of wastewater structures, electrical equipment and instrumentation, fencing, and bollards. Additional work includes construction of a gravel access road, concrete pads and foundation, and site restoration.
- Retrieved
- October 13, 2026 01:42
- Source location
- body
- Document version fingerprint (SHA-256)
259f0b19cb83f24c0adfa6c6174a5bc1311770d04c0268eef4a4ba7b3eede3a9
This fingerprint identifies the saved document version. The publisher’s current file may have changed since retrieval.