Supporting official record
Port Orford City Council packet — February 17, 2022
City of Port Orford · PDF page 72
This passage is cited in Waterline IQ’s reviewed records. Read it alongside the project history to understand the fact it supports and what remains unresolved.
The cited passage
“LakeshoreDrive(a): The existing unknown-size water main needs to be replaced due to excessive leakage and other high maintenance issues. The new 6-inch diameter line will begin at the intersection ofLakeshore Drive and Hamlet Place. The line will continue west along Lakeshore Dl'ive, in the same...”Read the official document · page 72
Opens the publisher’s record in a new tab. The passage is an extract; use the original document for the surrounding context.
Saved excerpt and document details
The full captured excerpt is preserved below, including any partial sentences at its boundaries.
LakeshoreDrive(a): The existing unknown-size water main needs to be replaced due to excessive leakage and other high maintenance issues. The new 6-inch diameter line will begin at the intersection ofLakeshore Drive and Hamlet Place. The line will continue west along Lakeshore Dl'ive, in the same location as the existing waterline, to the end ofLakeshore Drive. The total improvement length is approximately 1,550 feet. B. HamletPJaee: The existing 4-illCh water main needs 10 be replaced due to excessive leakage and other high maintenance issues. The new 6-inch diameter line will begin at the intersection of Lakeshore Dl'ive and Hamlet Place. The line will continue west along Hamlet Place in the same location as the existing waterline, to the end ofLakeshore Drive. The total ilnpl'Ovement length is approximately
- Retrieved
- July 14, 2026 18:52
- Source location
- PDF page 72
- Document version fingerprint (SHA-256)
94c0cb8d676452935564b152b740a230c4d38ef74f9df47e99341f8d831c9614
This fingerprint identifies the saved document version. The publisher’s current file may have changed since retrieval.