Skip to main content
Waterline IQ — Water Infrastructure

Supporting official record

Salem Willow Lake north secondary clarifier rehabilitation

Oregon public agencies via OregonBuys · Official webpage passage

This passage is cited in Waterline IQ’s reviewed records. Read it alongside the cited record to understand the fact it supports and what remains unresolved.

The cited passage

“Bid Number: S-KS0043-00000250 Description: #212069 Willow Lake Water Pollution Control Facility North Secondary Clarifier Rehabilitation Projec Bid Opening Date: 08/24/2021 02:30:00 PM Purchaser: Tracy MacDermott Organization: City of Salem Department: KS004302 - Engineering Location: KS004 -...”
Read the official document

Opens the publisher’s record in a new tab. The passage is an extract; use the original document for the surrounding context.

Saved excerpt and document details

The full captured excerpt is preserved below, including any partial sentences at its boundaries.

Bid Number: S-KS0043-00000250 Description: #212069 Willow Lake Water Pollution Control Facility North Secondary Clarifier Rehabilitation Projec Bid Opening Date: 08/24/2021 02:30:00 PM Purchaser: Tracy MacDermott Organization: City of Salem Department: KS004302 - Engineering Location: KS004 - Engineering Fiscal Year: 22 Allow Electronic Quote: No Alternate Id: Required Date: Available Date : 07/16/2021 08:00:00 AM Info Contact: Bid Type: OPEN Informal Bid Flag: No Purchase Method: Open Market Pre Bid Conference: A mandatory pre-bid conference will be on August 2, 2021, at 10:00 AM located at 5919 Windsor Island Road N, Keizer, Oregon 97303. Please refer to contract for other details. Bulletin Desc: Engineer's Estimate $1,600,000 to $2,000,000 Ship-to Address: Tracy MacDermott555 Liberty Street SE Room 325Salem, OR 97301USEmail: [email protected]: (503) 588-6211 Bill-to Address: Tracy MacDermott555 Liberty Street SE Room 325Salem, OR 97301USEmail: [email protected]: (503) 588-6211 Print Format: Bid Print New File Attachments: Intent to Award Willow Lake Water Pollution Control Facility North Secondary Clarifier Rehabilitation Project Bid Opening Bid No 212069 Zoom Meeting Addendum Number 1 Supplemental Letter 1 Addendum Number 2 Bid Register Form Attachments: Required Quote Attachments Desired Attachment Name Description Discipline Type: Public Improvement Procurement Method: Competitive Sealed Bid Amendments: Amendment # Amendment Date Amendment Note 1 08/10/2021 08:58:44 AM Attachment File Changes: Header 1. File 'Bid Opening Bid No 212069 Zoom Meeting': File 'Bid Opening Bid No 212069 Zoom Meeting' added . 2 08/11/2021 01:44:43 PM Addendum Number 1 Attachment File Changes: Header 1. File 'Addendum Number 1': File 'Addendum Number 1' added . See attachment. 3 08/12/2021 04:01:16 PM Bid date change Attachment File Changes: Header 1. File 'Supplemental Letter 1': File 'Supplemental Letter 1' added . Bid date change 4 08/13/2021 03:03:17 PM Change of Bid Date Header 1. Bid Opening Date changed from "08/17/2021 02:30:00 PM" to "08/24/2021 02:30:00 PM". 5 08/18/2021 02:32:09 PM Attachment File Changes: Header 1. File 'Addendum Number 2': File 'Addendum Number 2' added . 6 09/15/2021 01:31:45 PM Bid Registere Attachment File Changes: Header 1. File 'Bid Register': File 'Bid Register' added . 2. File 'Intent to Award': File 'Intent to Award' added . Item Information Item # 1: ( 913 - 59 ) The Work under this contract consists of the removal and replacement of the existing North Secondary clarifier mechanism, weir, scum baffle, spray system, scum beach/trough, bridge and all other items associated with the clarifier mechanism to make a complete and operational clarifier mechanism; demolition of cable piers around the perimeter of the tank; clarifier center pier structural improvements; electrical controls and wiring; site electrical and instrumentation and control including new conduits for power and signal wiring to the clarifier drive, new power feed and signal conductors to the mechanism drive, concrete slab and wall rehabilitation and grout repair within the clarifier; demolition of necessary surface improvements to replace a 48-inch with a 72-inch pipe; temporary relocation of existing buried utilities within the work area and replacement within the original location at the conclusion of pipe backfilling; backfill and replacement of surface improvements within the disturbed area; removal recalibration and re-installation of the propeller flow meter at the flow control box; together with all appurtenances. NIGP Code: 913-59 Construction and Upgrades, Wastewater Treatment Plant Qty Unit Cost UOM Total Discount Amt. Total Cost 1.0 EA - Each Manufacturer: Brand: Model: Make: Packaging: Copyright © 2026 Periscope Holdings, Inc. - All Rights Reserved. window.dataLayer = window.dataLayer || []; window.dataLayer.push({ 'event': 'uxToggle', 'uxChosen': 'old' }); (function(w,d,s,l,i) { w[l]=w[l]||[]; w[l].push( { 'gtm.start': new Date().getTime(), event:'gtm.js' } ); let f=d.getElementsByTagName(s)[0], j=d.createElement(s),dl=l!='dataLayer'?'&l='+l:''; j.async=true; j.src= 'https://www.googletagmanager.com/gtm.js?id='+i+dl; f.parentNode.insertBefore(j,f); })(window,document,'script','dataLayer','GTM-TDBMP45Z');
Retrieved
October 13, 2026 11:07
Source location
body:nth-of-type(1) > form#bidDetail:nth-of-type(1) > table:nth-of-type(1) > tbody:nth-of-type(1) > tr:nth-of-type(1)
Document version fingerprint (SHA-256)
9e1fc2d9575dd35103962031bbbace70ebfa8f45e1b162485859882e4a69f7d2

This fingerprint identifies the saved document version. The publisher’s current file may have changed since retrieval.