Supporting official record
2026 Q3 Combined Base DWSRF and IIJA General Supplemental PPL
Oregon Health Authority · 2026 COMBINED (H&C&C) PPL!A25:S25
This passage is cited in Waterline IQ’s reviewed records. Read it alongside the project history to understand the fact it supports and what remains unresolved.
The cited passage
“11 | City of Port Orford SD-26-18 Curry Christopher Frazier / Tawni Bean 1,200 | | Issue: Aging and failing WTP infrastructure, specifically: - Failing tube settlers and filter media - Nonfunctional SCADA emergency callouts - Backwash/scour system unable to properly clean filters - Structural...”Read the official document
Opens the publisher’s record in a new tab. The passage is an extract; use the original document for the surrounding context.
Saved excerpt and document details
The full captured excerpt is preserved below, including any partial sentences at its boundaries.
11 | City of Port Orford SD-26-18 Curry Christopher Frazier / Tawni Bean 1,200 | | Issue: Aging and failing WTP infrastructure, specifically: - Failing tube settlers and filter media - Nonfunctional SCADA emergency callouts - Backwash/scour system unable to properly clean filters - Structural deterioration and near failure of part of the treatment train. Severe leaks and failure of the distribution lines: - Two of the major drinking water distribution lines are leaking over 50% of their flow. These lines are also prone to break, creating reliability and maintenance problems. Project: The project is to replace failing components of the City of Port Orford’s Water Treatment Plant and to replace two of the City’s most leak prone drinking water distribution lines. | | | | | Treatment Distribution/Trans. Engineering | 6682594 | 1500000 | 6682594 | 1500000 | To be confirmed at the time of invitation to apply and subject to subsidy availability. Disadvantaged communities may qualify for up to $1,500,000 in forgivable loan funding, or 50% of total project costs (whichever is lower), and interest rates as low as 1%. | Yes | 2026 (LOI expires on TBD) | 3Q2026 | 53 | Rating results include: 15 pts (Health Risk) due to leaking pipes throughout system which prevents system from keeping pressure consistently above 20 psi. 10 pts (Compliance) due to the project mitigating the pressure related issues to keep system in compliance. 0 pts (Consolidation) 25 pts (Affordability) 3 pts (Water System Size)
- Retrieved
- July 14, 2026 18:34
- Source location
- 2026 COMBINED (H&C&C) PPL!A25:S25
- Document version fingerprint (SHA-256)
b9057387bb5476a629adc37193aa704e21ab14bc0c01e2e08539ede447fca4b7
This fingerprint identifies the saved document version. The publisher’s current file may have changed since retrieval.