Canby Utility
Reviewed intelligence covers 1 project across funding pipeline. Current commercial scope concentrates on process and controls, pumping and storage, and treatment plant.
Last verified Sep 25, 2026 1 published project history
- Last verified
- Sep 25, 2026
- Reviewed portfolio
- 1 project
- Source families
- 3 official families
- Historical depth
- 2024
Account brief
Current reviewed account position
Current Waterline IQ coverage includes 1 published project history across funding pipeline. Accepted project records cover drinking water, with reviewed work concentrated in process and controls, pumping and storage, and treatment plant. This is a portfolio-derived account view, not a complete capital-program, staffing, facility, or procurement inventory.
- Published projects
- 1
- Official source families
- 3
- Lifecycle breadth
- 1 stage
- Recent material changes
- 1
- Nearest external milestone
- Jul 2026–Jun 2027
What changed
Highest-value recent account changes
-
Funding signal
Added during OHA's 3Q2026 DWSRF priority-list cycle
The project has entered an official funding pipeline, improving credibility without confirming an award.
Canby Water Supply and Treatment Improvements · Q3 2026
Reviewed project portfolio
What the owner is planning and building
Funding pipeline
1Upcoming external milestones
Next reviewed decision points
Business Oregon financing invitation and confirmation of the current project delivery plan
Canby Water Supply and Treatment Improvements
- Timing
- Jul 2026–Jun 2027
- Confidence
- Moderate confidence
- Could change timing
- No accepted project relationship establishes the current design lead.
Funding profile
Funding progression by project
Canby Water Supply and Treatment Improvements
Requested / Priority-listed / Awarded · $9,615,000 requested
Awarded funding confirmed- Programs
- OHA Drinking Water State Revolving Fund (DWSRF)
- Remaining funding gap
- Not established
Procurement and delivery
Reviewed buying position
Canby Water Supply and Treatment Improvements
Awarded procurement
Awarded procurement
Awarded to Stantec Consulting Services, Inc. · $1,896,373Organizations and relationships
Documented project-specific roles
Contractor
- Stantec Consulting Services, Inc.Canby Water Supply and Treatment ImprovementsEvidence
Facilities and systems
Commercially relevant public assets
No reviewed facility record is available. Waterline IQ does not infer facilities from project names.
Consequential unknowns and conflicts
What current coverage does not establish
-
Coverage boundary
Portfolio completeness is not established
Current coverage includes published Waterline IQ project histories; it is not a complete capital-program inventory.
-
Coverage limitation
Canby Water Supply and Treatment Improvements
The confirmed award covers conceptual engineering and Year 1 owner’s representation; future design and construction procurements are not yet confirmed.
Open project
Chronological owner activity
Complete reviewed account history
-
Funding signal · Project-level
Added during OHA's 3Q2026 DWSRF priority-list cycle
OHA lists the project for DWSRF funding consideration; the workbook does not establish a formal procurement date.
Canby Water Supply and Treatment Improvements · Official evidence -
Baseline history · Project-level
Conceptual engineering and owner’s representative contract authorized
The Canby Utility Board authorized a $1,896,373.32 professional-services agreement with Stantec.
Canby Water Supply and Treatment Improvements · Official evidence
Source coverage and freshness
What Waterline IQ has reviewed
Canby drinking-water supply professional-services award
Canby Utility
OHA DWSRF infrastructure project priority list
Oregon Health Authority
OHA DWSRF infrastructure project priority list — public-comment edition
Oregon Health Authority
Evidence and official sources
Accepted owner and portfolio facts
Evidence and material facts — 11 verified claims
Organization governance type
municipal_utility_bureau
“Canby Utility Board”
Professional services award
Stantec selected for conceptual engineering and Year 1 owner’s representative services
“Canby Utility Regular Board Meeting Minutes January 14, 2025 Page 2 of 4 Chair Thompson presented the annual election of the Board’s Chairperson for 2025 and then opened the floor for nominations. Member Molamphy made a *MOTION to appoint the present board chair, Melody Thompson, as Chairperson for 2025. Chair Thompson accepted the nomination. Member Hill seconded the motion. Member Molamphy made another motion to close nominations. Member Hill seconded the motion. The motion passed with four yes votes and one abstention. Thompson abstained from the voting process. Let the record show that the second motion was to close nominations; however, the first motion appointed Thompson as chair. General Manager Carol Sullivan introduced Mark Knudson, the consultant from the Special Districts Association of Oregon whom Canby Utility retained as project advisor for procurement of professional services for Conceptual Engineering and Owner’s Representative Services for the Canby Drinking Water Supply System project. Knudson said that in working with Canby Utility’s leadership team, they conducted a comprehensive professional services procurement process to comply with ORS 279C requirements, procurement of contracts for engineering and other certain professional services, and Canby Utility’s board-established policies. Knudson reviewed the complete process, beginning with preparing the scope of work for the project and the request for proposals (RFP) to the seven-member Consultant Evaluation Committee’s recommended selection of Stantec. The notice of intent to award was issued on November 27, 2024; no protests were received. Canby Utility staff entered into negotiations with Stantec to finalize the scope of work, project schedule, and fee for the requested services. Staff also consulted with Canby Utility’s legal counsel to prepare the final professional services agreement for the project. Knudson highlighted features of the agreement. These included two major work elements and separate fees associated with each: Conceptual Engineering and Project Definition for $1,481,983.10 and Year 1 Owner’s Representative Services for $414,390.22. The total fee awarded under this contract is $1,896,373.32. Since the water supply project will continue over several years, the Owner’s Representative Services will be a year-to-year agreement, and the board is only being asked to authorize Year 1 services. Near the end of the project's first year, s”
Oha dwsrf loi
SD-26-10
“SD-26-10”
Priority rank
36
“36”
Project description
Issue: The Molalla River doesn’t currently meet available volumes above the treatment plants 8 MGD capacity. The current treatment plant also cannot treat for cyanotoxins or taste & odor problems associated with geosmin and MIB. The treatment plant is also not seismic ready. Project: New intake on Willamette River with greater capacity (up to 20.9MGD). New 17 MGD WTP: flocculation, ozone, filtration, chlorination. New finished water clearwell, pumping station, transmission main connected to existing distribution system.
“Issue: The Molalla River doesn’t currently meet available volumes above the treatment plants 8 MGD capacity. The current treatment plant also cannot treat for cyanotoxins or taste & odor problems associated with geosmin and MIB. The treatment plant is also not seismic ready. Project: New intake on Willamette River with greater capacity (up to 20.9MGD). New 17 MGD WTP: flocculation, ozone, filtration, chlorination. New finished water clearwell, pumping station, transmission main connected to existing distribution system.”
Project focus
Treatment Engineering
“Treatment Engineering”
Amount requested
$9,615,000 USD
“9615000”
Disadvantaged community
No
“No”
Ppl quarter added
3Q2026
“3Q2026”
Project rating
5
“5”
Public comment ppl listing
loi_id: SD-26-10, revised_on: 2026-06-09
“s lower), and interest rates at 80% of the market rate. Canby Utility Issue: The Molalla River doesn’t currently meet available volumes Rating results include: SD-26-10 above the treatment plants 8 MGD capacity. The current treatment 5 pts (Health Risk) due to proposed new plant also cannot treat for cyanotoxins or taste & odor problems treatment plant to mitigate potential Clackamas Jeff Hampton / Matt Celentano associated with geosmin and MIB. The treatment plant is also not Project is included on the Project is included on Project is included on the cyanotoxins and taste & odor issues. 18,754 seismic ready. 2026 IIJA Emerging the 2026 IIJA Emerging 2026 IIJA Emerging 0 pts (Compliance) Project: New intake on Willamette River with greater capacity (up to Contaminants Funding Contaminants Funding Contaminants Funding 0 pts (Consolidation) 20.9MGD). New 17 MGD WTP: flocculation, ozone, filtration, 2026 0 pts (Affordability) 36 chlorination. New finished water clearwell, pumping station, Treatment $9,615,000 $400,000 Project Priority List (PPL) Project Priority List Project Priority List (PPL) (LOI expires on 3Q2026 0 pts (Water System Size) transmission main connected to existing distribution system. Engineering and is eligible for up to(PPL) and is eligible forand is eligible for up to No TBD) 5 100% principal up to 100% principal 100% principal forgiveness forgiveness under that forgiveness under that under that funding funding program. funding program. program. $548,500,31”