Canby Utility

Reviewed intelligence covers 1 project across funding pipeline. Current commercial scope concentrates on process and controls, pumping and storage, and treatment plant.

Last verified Sep 25, 2026 1 published project history

Last verified
Sep 25, 2026
Reviewed portfolio
1 project
Source families
3 official families
Historical depth
2024

What changed

Highest-value recent account changes

1 published material signal

Reviewed project portfolio

What the owner is planning and building

Published coverage, not a complete capital program

Funding pipeline

1
Current position Funding pipeline Requested / Priority-listed / Awarded · Awarded procurement
Latest change Added during OHA's 3Q2026 DWSRF priority-list cycle Q3 2026
Confirmed scope Treatment plant, Pumping and storage, and Process and controls
Next external milestone Business Oregon financing invitation and confirmation of the current project delivery plan Jul 2026–Jun 2027 · Moderate confidence
Evidence / exception 3 official source families Last verified Sep 25, 2026

Upcoming external milestones

Next reviewed decision points

Chronological, bounded forecasts
Funding decision

Business Oregon financing invitation and confirmation of the current project delivery plan

Canby Water Supply and Treatment Improvements

Timing
Jul 2026–Jun 2027
Confidence
Moderate confidence
Could change timing
No accepted project relationship establishes the current design lead.
OHA has ranked and publicly noticed the project for DWSRF consideration, but the reviewed records do not establish a formal procurement date or delivery method.

Funding profile

Funding progression by project

Canby Water Supply and Treatment Improvements

Requested / Priority-listed / Awarded · $9,615,000 requested

Awarded funding confirmed
Programs
OHA Drinking Water State Revolving Fund (DWSRF)
Remaining funding gap
Not established

Procurement and delivery

Reviewed buying position

Organizations and relationships

Documented project-specific roles

Not account-wide incumbency

Contractor

Facilities and systems

Commercially relevant public assets

Public information only

No reviewed facility record is available. Waterline IQ does not infer facilities from project names.

Consequential unknowns and conflicts

What current coverage does not establish

Ranked qualification limits
  1. Coverage boundary

    Portfolio completeness is not established

    Current coverage includes published Waterline IQ project histories; it is not a complete capital-program inventory.

  2. Coverage limitation

    Canby Water Supply and Treatment Improvements

    The confirmed award covers conceptual engineering and Year 1 owner’s representation; future design and construction procurements are not yet confirmed.

    Open project

Chronological owner activity

Complete reviewed account history

Official event date · newest first
  1. Funding signal · Project-level

    Added during OHA's 3Q2026 DWSRF priority-list cycle

    OHA lists the project for DWSRF funding consideration; the workbook does not establish a formal procurement date.

    Canby Water Supply and Treatment Improvements · Official evidence
  2. Baseline history · Project-level

    Conceptual engineering and owner’s representative contract authorized

    The Canby Utility Board authorized a $1,896,373.32 professional-services agreement with Stantec.

    Canby Water Supply and Treatment Improvements · Official evidence

Source coverage and freshness

What Waterline IQ has reviewed

Historical depth2024
Official document versions3
Last successful reviewSep 25, 2026
Accepted claims11

Canby drinking-water supply professional-services award

Canby Utility

HealthyLast success Sep 25, 2026

OHA DWSRF infrastructure project priority list

Oregon Health Authority

HealthyLast success Sep 25, 2026

OHA DWSRF infrastructure project priority list — public-comment edition

Oregon Health Authority

HealthyLast success Sep 25, 2026

Evidence and official sources

Accepted owner and portfolio facts

11 accepted claims
Evidence and material facts — 11 verified claims
Owner fact · Canby Utility

Organization governance type

municipal_utility_bureau

“Canby Utility Board”
Portfolio-derived · Canby Water Supply and Treatment Improvements

Professional services award

Stantec selected for conceptual engineering and Year 1 owner’s representative services

“Canby Utility Regular Board Meeting Minutes January 14, 2025 Page 2 of 4 Chair Thompson presented the annual election of the Board’s Chairperson for 2025 and then opened the floor for nominations. Member Molamphy made a *MOTION to appoint the present board chair, Melody Thompson, as Chairperson for 2025. Chair Thompson accepted the nomination. Member Hill seconded the motion. Member Molamphy made another motion to close nominations. Member Hill seconded the motion. The motion passed with four yes votes and one abstention. Thompson abstained from the voting process. Let the record show that the second motion was to close nominations; however, the first motion appointed Thompson as chair. General Manager Carol Sullivan introduced Mark Knudson, the consultant from the Special Districts Association of Oregon whom Canby Utility retained as project advisor for procurement of professional services for Conceptual Engineering and Owner’s Representative Services for the Canby Drinking Water Supply System project. Knudson said that in working with Canby Utility’s leadership team, they conducted a comprehensive professional services procurement process to comply with ORS 279C requirements, procurement of contracts for engineering and other certain professional services, and Canby Utility’s board-established policies. Knudson reviewed the complete process, beginning with preparing the scope of work for the project and the request for proposals (RFP) to the seven-member Consultant Evaluation Committee’s recommended selection of Stantec. The notice of intent to award was issued on November 27, 2024; no protests were received. Canby Utility staff entered into negotiations with Stantec to finalize the scope of work, project schedule, and fee for the requested services. Staff also consulted with Canby Utility’s legal counsel to prepare the final professional services agreement for the project. Knudson highlighted features of the agreement. These included two major work elements and separate fees associated with each: Conceptual Engineering and Project Definition for $1,481,983.10 and Year 1 Owner’s Representative Services for $414,390.22. The total fee awarded under this contract is $1,896,373.32. Since the water supply project will continue over several years, the Owner’s Representative Services will be a year-to-year agreement, and the board is only being asked to authorize Year 1 services. Near the end of the project's first year, s”
Portfolio-derived · Canby Water Supply and Treatment Improvements

Oha dwsrf loi

SD-26-10

“SD-26-10”
Portfolio-derived · Canby Water Supply and Treatment Improvements

Priority rank

36

“36”
Portfolio-derived · Canby Water Supply and Treatment Improvements

Project description

Issue: The Molalla River doesn’t currently meet available volumes above the treatment plants 8 MGD capacity. The current treatment plant also cannot treat for cyanotoxins or taste & odor problems associated with geosmin and MIB. The treatment plant is also not seismic ready. Project: New intake on Willamette River with greater capacity (up to 20.9MGD). New 17 MGD WTP: flocculation, ozone, filtration, chlorination. New finished water clearwell, pumping station, transmission main connected to existing distribution system.

“Issue: The Molalla River doesn’t currently meet available volumes above the treatment plants 8 MGD capacity. The current treatment plant also cannot treat for cyanotoxins or taste & odor problems associated with geosmin and MIB. The treatment plant is also not seismic ready. Project: New intake on Willamette River with greater capacity (up to 20.9MGD). New 17 MGD WTP: flocculation, ozone, filtration, chlorination. New finished water clearwell, pumping station, transmission main connected to existing distribution system.”
Portfolio-derived · Canby Water Supply and Treatment Improvements

Project focus

Treatment Engineering

“Treatment Engineering”
Portfolio-derived · Canby Water Supply and Treatment Improvements

Amount requested

$9,615,000 USD

“9615000”
Portfolio-derived · Canby Water Supply and Treatment Improvements

Disadvantaged community

No

“No”
Portfolio-derived · Canby Water Supply and Treatment Improvements

Ppl quarter added

3Q2026

“3Q2026”
Portfolio-derived · Canby Water Supply and Treatment Improvements

Project rating

5

“5”
Portfolio-derived · Canby Water Supply and Treatment Improvements

Public comment ppl listing

loi_id: SD-26-10, revised_on: 2026-06-09

“s lower), and interest rates at 80% of the market rate. Canby Utility Issue: The Molalla River doesn’t currently meet available volumes Rating results include: SD-26-10 above the treatment plants 8 MGD capacity. The current treatment 5 pts (Health Risk) due to proposed new plant also cannot treat for cyanotoxins or taste & odor problems treatment plant to mitigate potential Clackamas Jeff Hampton / Matt Celentano associated with geosmin and MIB. The treatment plant is also not Project is included on the Project is included on Project is included on the cyanotoxins and taste & odor issues. 18,754 seismic ready. 2026 IIJA Emerging the 2026 IIJA Emerging 2026 IIJA Emerging 0 pts (Compliance) Project: New intake on Willamette River with greater capacity (up to Contaminants Funding Contaminants Funding Contaminants Funding 0 pts (Consolidation) 20.9MGD). New 17 MGD WTP: flocculation, ozone, filtration, 2026 0 pts (Affordability) 36 chlorination. New finished water clearwell, pumping station, Treatment $9,615,000 $400,000 Project Priority List (PPL) Project Priority List Project Priority List (PPL) (LOI expires on 3Q2026 0 pts (Water System Size) transmission main connected to existing distribution system. Engineering and is eligible for up to(PPL) and is eligible forand is eligible for up to No TBD) 5 100% principal up to 100% principal 100% principal forgiveness forgiveness under that forgiveness under that under that funding funding program. funding program. program. $548,500,31”