City of Eugene
Reviewed intelligence covers 4 projects across procurement. Current commercial scope concentrates on distribution, process and controls, and pumping and storage.
Last verified Oct 12, 2026 4 published project histories
- Last verified
- Oct 12, 2026
- Reviewed portfolio
- 4 projects
- Source families
- 1 official family
- Historical depth
- 2023
Account brief
Current reviewed account position
Current Waterline IQ coverage includes 4 published project histories across active solicitation. Accepted project records cover drinking water, with reviewed work concentrated in distribution, process and controls, and pumping and storage. This is a portfolio-derived account view, not a complete capital-program, staffing, facility, or procurement inventory.
- Published projects
- 4
- Official source families
- 1
- Lifecycle breadth
- 1 stage
- Recent material changes
- 1
- Nearest external milestone
- Timing not yet reviewed
What changed
Highest-value recent account changes
-
Procurement
Formal procurement opportunity published
The reviewed response window has ended or closed; this publication does not establish a current open pursuit or an award.
2026 ITB 17 Park Forest Dr from 28th Ave Stormwater Improvements · Aug 11, 2026
Reviewed project portfolio
What the owner is planning and building
Active solicitation
42026 ITB 17 Park Forest Dr from 28th Ave Stormwater Improvements
Eugene, Oregon · S-KE0010-00017725
Upcoming external milestones
Next reviewed decision points
Official response deadline
2026 ITB 17 Park Forest Dr from 28th Ave Stormwater Improvements
- Timing
- Timing not yet reviewed
- Confidence
- Timing unknown
- Could change timing
- Funding status is not established in reviewed records.
Official response deadline
2026 ITB 7 Old Coburg Road Stormwater Retrofit
- Timing
- Timing not yet reviewed
- Confidence
- Timing unknown
- Could change timing
- Funding status is not established in reviewed records.
Official response deadline
2026 ITB 9 100-Year-Old Wastewater Pipe Rehabilitation
- Timing
- Timing not yet reviewed
- Confidence
- Timing unknown
- Could change timing
- Funding status is not established in reviewed records.
Official response deadline
West Irwin Pump Station Replacement
- Timing
- Timing not yet reviewed
- Confidence
- Timing unknown
- Could change timing
- Funding status is not established in reviewed records.
Funding profile
Funding progression by project
No accepted funding record or reviewed funding signal is available.
Procurement and delivery
Reviewed buying position
2026 ITB 17 Park Forest Dr from 28th Ave Stormwater Improvements
Procurement details incomplete
Procurement details incomplete
2026 ITB 7 Old Coburg Road Stormwater Retrofit
Procurement details incomplete
Procurement details incomplete
2026 ITB 9 100-Year-Old Wastewater Pipe Rehabilitation
Procurement details incomplete
Procurement details incomplete
West Irwin Pump Station Replacement
Procurement details incomplete
Procurement details incomplete
Organizations and relationships
Documented project-specific roles
No consultant, contractor, funding-agency, or partner relationship has been accepted for this portfolio.
Facilities and systems
Commercially relevant public assets
No reviewed facility record is available. Waterline IQ does not infer facilities from project names.
Consequential unknowns and conflicts
What current coverage does not establish
-
Coverage boundary
Portfolio completeness is not established
Current coverage includes published Waterline IQ project histories; it is not a complete capital-program inventory.
-
Coverage limitation
2026 ITB 17 Park Forest Dr from 28th Ave Stormwater Improvements
Initial project record from an official solicitation; earlier planning history is not yet established.
Open project -
Coverage limitation
2026 ITB 7 Old Coburg Road Stormwater Retrofit
Initial project record from an official solicitation; earlier planning history is not yet established.
Open project -
Coverage limitation
2026 ITB 9 100-Year-Old Wastewater Pipe Rehabilitation
Initial project record from an official solicitation; earlier planning history is not yet established.
Open project -
Coverage limitation
West Irwin Pump Station Replacement
Initial project record from an official solicitation; earlier planning history is not yet established.
Open project
Chronological owner activity
Complete reviewed account history
-
Procurement · Project-level
Formal procurement opportunity published
2026 ITB 17 Park Forest Dr from 28th Ave Stormwater Improvements: The scope of work for this contract includes: Stormwater pipe rehabilitation and construction; Concrete paving; Earthwork; Temporary traffic control Responses due 2026-08-25.
2026 ITB 17 Park Forest Dr from 28th Ave Stormwater Improvements · Official evidence -
Baseline history · Project-level
Formal procurement opportunity published
2026 ITB 7 Old Coburg Road Stormwater Retrofit: The scope of work for this contract includes: Removal of old curbless, concrete splash pads in stormwater facilities. Temporary traffic control and erosion control. Tree preservation. Construction of concrete splash pads. Construction of concrete stormwater planters. Construction of concrete mow curbs. Minor lawn repair associated with the improvement. Stormwater soil and mulch. Stormwater planting. Responses due 2026-05-21.
2026 ITB 7 Old Coburg Road Stormwater Retrofit · Official evidence -
Baseline history · Project-level
Official solicitation addendum published
West Irwin Pump Station Replacement: The official solicitation requests competitive construction bids for West Irwin Pump Station Replacement. Responses due 2023-11-29.
West Irwin Pump Station Replacement · Official evidence
Source coverage and freshness
What Waterline IQ has reviewed
OregonBuys water-infrastructure outcome discovery
Oregon public agencies via OregonBuys
Evidence and official sources
Accepted owner and portfolio facts
Evidence and material facts — 4 verified claims
Project scope
The scope of work for this contract includes: Stormwater pipe rehabilitation and construction; Concrete paving; Earthwork; Temporary traffic control
“The scope of work for this contract includes: Stormwater pipe rehabilitation and construction; Concrete paving; Earthwork; Temporary traffic control”
Project scope
The scope of work for this contract includes: Removal of old curbless, concrete splash pads in stormwater facilities. Temporary traffic control and erosion control. Tree preservation. Construction of concrete splash pads. Construction of concrete stormwater planters. Construction of concrete mow curbs. Minor lawn repair associated with the improvement. Stormwater soil and mulch. Stormwater planting.
“The scope of work for this contract includes: Removal of old curbless, concrete splash pads in stormwater facilities. Temporary traffic control and erosion control. Tree preservation. Construction of concrete splash pads. Construction of concrete stormwater planters. Construction of concrete mow curbs. Minor lawn repair associated with the improvement. Stormwater soil and mulch. Stormwater planting.”
Project scope
This project is for the elimination of groundwater infiltration and inflow into the public wastewater collection system by installing liners into wastewater mains within the Public Right of Way.
“This project is for the elimination of groundwater infiltration and inflow into the public wastewater collection system by installing liners into wastewater mains within the Public Right of Way.”
Project scope
The scope of work includes: Installing and operating a temporary bypass pumping system. Demolishing and salvaging existing pump station facilities and equipment. Converting the existing caisson into a wet well. Furnishing and installing five submersible pumps, associated piping, three buried concrete vaults, and electrical and instrumentation equipment. Constructing a new above-ground building. Site grading, paving, and grasscrete surfacing construction. Facility startup and testing.
“The scope of work includes: Installing and operating a temporary bypass pumping system. Demolishing and salvaging existing pump station facilities and equipment. Converting the existing caisson into a wet well. Furnishing and installing five submersible pumps, associated piping, three buried concrete vaults, and electrical and instrumentation equipment. Constructing a new above-ground building. Site grading, paving, and grasscrete surfacing construction. Facility startup and testing.”