Owner type
City or municipality
Geography
Reviewed projects · Milton-Freewater, Oregon
Reviewed sectors
Drinking water

City of Milton-Freewater

Reviewed intelligence covers 1 project across funding pipeline. Current commercial scope concentrates on distribution and pumping and storage.

Last verified Sep 25, 2026 1 published project history

Last verified
Sep 25, 2026
Reviewed portfolio
1 project
Source families
3 official families
Historical depth
2023

What changed

Highest-value recent account changes

1 published material signal

Reviewed project portfolio

What the owner is planning and building

Published coverage, not a complete capital program

Funding pipeline

1
Project

Milton-Freewater Well, Reservoir, and Distribution Improvements

Milton-Freewater, Oregon · SD-26-15

Current position Funding pipeline Requested / Priority-listed · Procurement forecast
Latest change Added during OHA's 3Q2026 DWSRF priority-list cycle Q3 2026
Confirmed scope Distribution and Pumping and storage
Next external milestone Complete designs and publish the construction RFP Jul 2025–Jun 2026 · Moderate confidence
Evidence / exception 3 official source families Last verified Sep 25, 2026

Upcoming external milestones

Next reviewed decision points

Chronological, bounded forecasts

No future external milestone has a reviewed forecast window.

Funding profile

Funding progression by project

Procurement and delivery

Reviewed buying position

Organizations and relationships

Documented project-specific roles

Not account-wide incumbency

No consultant, contractor, funding-agency, or partner relationship has been accepted for this portfolio.

Facilities and systems

Commercially relevant public assets

Public information only

No reviewed facility record is available. Waterline IQ does not infer facilities from project names.

Consequential unknowns and conflicts

What current coverage does not establish

Ranked qualification limits
  1. Coverage boundary

    Portfolio completeness is not established

    Current coverage includes published Waterline IQ project histories; it is not a complete capital-program inventory.

  2. Funding position

    Milton-Freewater Well, Reservoir, and Distribution Improvements: no award or executed financing is established

    No award confirmed

    Open project
  3. Coverage limitation

    Milton-Freewater Well, Reservoir, and Distribution Improvements

    The design RFQ and construction forecast are confirmed; no active construction solicitation or construction award is confirmed in the reviewed records.

    Open project

Chronological owner activity

Complete reviewed account history

Official event date · newest first
  1. Funding signal · Project-level

    Added during OHA's 3Q2026 DWSRF priority-list cycle

    OHA lists the project for DWSRF funding consideration; the workbook does not establish a formal procurement date.

    Milton-Freewater Well, Reservoir, and Distribution Improvements · Official evidence
  2. Baseline history · Project-level

    Reservoir and Well 10 design qualifications due

    The City set March 29, 2023 as the RFQ deadline for design of a new two-million-gallon reservoir and Well 10 pump house.

    Milton-Freewater Well, Reservoir, and Distribution Improvements · Official evidence

Source coverage and freshness

What Waterline IQ has reviewed

Historical depth2023
Official document versions4
Last successful reviewSep 25, 2026
Accepted claims12

Milton-Freewater water-system procurement records

City of Milton-Freewater

HealthyLast success Sep 25, 2026

OHA DWSRF infrastructure project priority list

Oregon Health Authority

HealthyLast success Sep 25, 2026

OHA DWSRF infrastructure project priority list — public-comment edition

Oregon Health Authority

HealthyLast success Sep 25, 2026

Evidence and official sources

Accepted owner and portfolio facts

12 accepted claims
Evidence and material facts — 12 verified claims
Owner fact · City of Milton-Freewater

Organization governance type

city_municipality

“City of Milton-Freewater”
Portfolio-derived · Milton-Freewater Well, Reservoir, and Distribution Improvements

Professional services procurement

RFQ C307 sought design services for Middle Reservoir and Well 10 pump house

“PROJECT DESCRIPTION: The City of Milton-Freewater is seeking interested design engineering firms to submit a list of pertinent qualifications, proposed project timeline and price proposal for designing a new 2 million gallon concrete reservoir adjacent to the existing water reservoir at the west end of SW 8th Ave (existing reservoir will remain in place) and a pump house and associated equipment for a new well, Well 10, adjacent to the existing south reservoir located along highway OR 11 at the south end of Milton-Freewater. Price proposals shall be split into two projects (reservoir and pump house) with tasks as described in the information packet.”
body#background:nth-of-type(1) > div:nth-of-type(2) > div:nth-of-type(2) > div:nth-of-type(1) > div:nth-of-type(1) > div:nth-of-type(1) > div:nth-of-type(1) > div:nth-of-type(1) > div:nth-of-type(2) > div#block-system-main:nth-of-type(1) > div:nth-of-type(2) > div#node-8380:nth-of-type(1) > div:nth-of-type(1) > div:nth-of-type(2) > div:nth-of-type(1) > div:nth-of-type(1) > p:nth-of-type(4)Published UnknownOpen exact evidenceOfficial source
Portfolio-derived · Milton-Freewater Well, Reservoir, and Distribution Improvements

Construction procurement forecast

Complete designs and publish an RFP to select a construction contractor during the 2025–2026 project phase

“Water System Improvements Project Timeline Middle Reservoir Replacement & Well 10 1956 2017 - most recent 2023-2024 2025-2026 Middle Reservoir Built Cleaning & Inspection RFQ, Initial Design Work Complete Designs & RFP Most recent cleaning and inspection City advertises RFQ for selecting an engineering firm to develop designs for a for the Middle Reservoir. new Middle Reservoir, Well 10 and Well/Pump house. Complete project designs Recommendation included replacing City hires Anderson Perry based on RFQ Publish RFP to select a contractor to reservoir interior coating, addressing construct the project. a few maintenance items (weather- Initial design work started including site surveys, site layout, geotechnical stripping) and continue inspection studies and drafting boundary line adjustments Finish any required permitting cycle City staff and Anderson Perry work to develop funding options for the project Anderson Perry engineers completed a Apply for CDBG grant funding to continue design process. water storage study that determines Middle Reservoir is too small. The Continue work on designs, boundary line adjustments and Construct new Middle Reservoir report provided options for replace- other aspects of the design phase above SW 8th Ave and drill new Well ment of the Middle Reservoir to meet 10 near the South Reservoir (along current and future water storage City and Anderson Perry staff will continue to seek additional Hwy 11 at the sound end of town). grant and funding options for the project. needs. On-going maintenance 2021-2022 2024-2025 2026-2028 & inspections Water Storage Study Funding & Start Designs Project Construction”
Portfolio-derived · Milton-Freewater Well, Reservoir, and Distribution Improvements

Oha dwsrf loi

SD-26-15

“SD-26-15”
Portfolio-derived · Milton-Freewater Well, Reservoir, and Distribution Improvements

Priority rank

16

“16”
Portfolio-derived · Milton-Freewater Well, Reservoir, and Distribution Improvements

Project description

Issue: Existing wells operate at near capacity during peak demand after well #9 was taken out of service. Middle reservoir nearing end of useful life and documented storage deficit in middle pressure zone. Project: Drill well #10, construct new reservoir to replace existing middle reservoir.

“Issue: Existing wells operate at near capacity during peak demand after well #9 was taken out of service. Middle reservoir nearing end of useful life and documented storage deficit in middle pressure zone. Project: Drill well #10, construct new reservoir to replace existing middle reservoir.”
Portfolio-derived · Milton-Freewater Well, Reservoir, and Distribution Improvements

Project focus

Storage Source Engineering

“Storage Source Engineering”
Portfolio-derived · Milton-Freewater Well, Reservoir, and Distribution Improvements

Amount requested

$4,028,800 USD

“4028800”
Portfolio-derived · Milton-Freewater Well, Reservoir, and Distribution Improvements

Disadvantaged community

Yes

“Yes”
Portfolio-derived · Milton-Freewater Well, Reservoir, and Distribution Improvements

Ppl quarter added

3Q2026

“3Q2026”
Portfolio-derived · Milton-Freewater Well, Reservoir, and Distribution Improvements

Project rating

41

“41”
Portfolio-derived · Milton-Freewater Well, Reservoir, and Distribution Improvements

Public comment ppl listing

loi_id: SD-26-15, revised_on: 2026-06-09

“is lower), and interest rates as low as 1%. City of Milton-Freewater Issue: Existing wells operate at near capacity during peak demand Rating results include: SD-26-15 after well #9 was taken out of service. Middle reservoir nearing end of 15 pts (Health Risk) due to middle Umatilla useful life and documented storage deficit in middle pressure zone. reservoir nearing end of useful life as Project: Drill well #10, construct new reservoir to replace existing documented in 2022 water storage Ryan DeGrofft / Gail Nelson middle reservoir. To be confirmed at the time study. 7,145 of invitation to apply and subject to subsidy 0 pts (Compliance) 0 pts (Consolidation) Storage availability. Disadvantaged 2026 25 pts (Affordability) Source $4,028,800 $1,500,000 $4,028,800 $1,500,000 communities may qualify (LOI expires on 3Q2026 1 pts (Water System Size) 16 for up to $1,500,000 in Yes 41 Engineering forgivable loan funding, or TBD) 50% of total project costs (whichever is lower), and interest rates as low as 1%. Maple Elsie Water Service Issue: Old, leaky and fragile distribution system. No service meters Rating results include: and few valves. System also has insufficient groundwater supply and 15 pts (Health Risk) due to the SD-26-09 Clatsop is on frequent boil water notices. unreliability of the system. These issues Melanie Olson / Melinda Hautala Project: are documented and demonstrated in 100 • Alternative 1: Transition from GW to SW. Install bag filters. Replace To be confirmed a”