Waterline IQ — Water Infrastructure
Location
Ashland, Oregon
Project code
SD-24-420

Treatment Active

Ashland Water Treatment Plant Resilience Project

Funded (WIFIA, DWSRF); construction intent to award issued to Slayden Constructors Nov 5, 2026. Next: bidding planned for winter 2026.

Last verified Nov 24, 2026 22 official sources

Status

Each stage is set from the records below. Stages can overlap.

  1. Planning

    Done: Identified

    2024
  2. Funding

    Done: Loan closed

    Dec 2025
  3. Design

    Done: Complete

    Sep 2026
  4. Permitting

    Not settled: Needed

  5. Procurement

    Under way: Intent to award

    Nov 2026
  6. Construction

    Not settled: Unknown

Solicitations

Each procurement is a separate public purchase with its own documents, deadline and outcome. This project has two.

Scope

The system is replacing the water treatment plant with a new 7.0 MGD direct filtration plant (with the ability to expand to 9.0 MGD for future demands). The WTP improvements include adding ozone, replacing the sand filter, chlorine feed, and flocculation basin. They will also add solar panels to offset the energy costs.

Official scope · 2 statements
  • Project description: The system is replacing the water treatment plant with a new 7.0 MGD direct filtration plant (with the ability to expand to 9.0 MGD for future demands). The WTP improvements include adding ozone, replacing the sand filter, chlorine feed, and flocculation basin. They will also add solar panels to offset the energy costs. The engineering design is done so this project is only for construction and construction management. Source 1 Source 2 Source 3
  • Project scope: The City of Ashland is requesting Bids for the construction of the Ashland Creek Water Treatment Plant. The Project includes the Construction of a new drinking water treatment plant including raw water conveyance, pressure reduction, chemical pretreatment equipment, filtration, filtered water storage and pumping, chemical storage and metering, water and sewer lines, and all other work described in the contract documents for a complete and functioning system. Source
Capacity
7.0 MGD
Estimated cost
$113MReplacement plant and associated transmission program

Waterline IQ interpretation Likely work: Treatment plant, pumping and storage, process and controls, and civil and site work

Funding and authorization

  • $73M loan

    Water Infrastructure Finance and Innovation Act (WIFIA) · United States Environmental Protection Agency

    Closed Dec 17, 2025
    Executed
  • $6M requested

    Drinking Water SRF, SD-24-420

    Priority list rank 30
    On priority list
  • Authorization

    City publishes plant relocation and EPA borrowing news release

    Mar 21, 2024
    Authorized

Contract packages

The procurements above, over time. Solid: recorded · dashed: forecast

Participants

Design / consulting
HDR Engineering, Inc.
Funding agencies
United States Environmental Protection Agency
Reviewing agencies
Not established
Contractors
Not established
Professional services
Owner’s representative awarded to West Yost

Recent changes

  1. Official intent to award reported

  2. 1. Addendum No. 4 published

  3. 1. Addendum No. 3 published

  4. Addendum No. 1 published

  5. Formal procurement opportunity published

Open questions

  • Procurement method

    A solicitation exists, but some details haven't been published.

  • Financing scope

    Plant-only allocation, exact signed principal and disbursement are not established. Source

History

  • Funding
  • Design
  • Procurement
  1. OHA records priority-list addition for SD-24-420 in SFY 2024, quarter 3

    OHA records the quarter and state fiscal year of priority-list addition.

    OHA priority list
  2. City publishes plant relocation and EPA borrowing news release

    The dated City release describes a recently passed financing resolution for replacement and relocation of the water treatment plant.

    City of Ashland news release
  3. EPA records WIFIA loan closing for Ashland water treatment program

    EPA records a $73 million WIFIA loan closing for the City of Ashland Water Treatment Plant Project on December 17, 2025.

    EPA loan record
  4. West Yost selected as owner’s representative

    The City project update reports selection of West Yost as owner’s representative and negotiation of Phase I scope and fee.

    City of Ashland project page
  5. OHA revised priority list includes project

    This project appears in the OHA section revised 2026-06-09.

    OHA priority list
  6. Listed on Oregon's drinking water SRF priority list

    The Oregon Health Authority's Drinking Water State Revolving Fund priority list dated June 09, 2026 lists application SD-24-420, requesting $6,000,000.

    OHA priority list
  7. Water treatment plant construction invitation to bid released

    City of Ashland project page
  8. Formal procurement opportunity published

    OregonBuys solicitation notice
  9. Addendum No. 1 published

    OregonBuys solicitation notice
  10. 1. Addendum No. 3 published

    OregonBuys solicitation notice
  11. 1. Addendum No. 4 published

    OregonBuys solicitation notice
  12. Official intent to award reported

    The owner states its intent to award.

    OregonBuys solicitation notice
  13. Today

More from the owner

Follow what City of Ashland is planning and building next

One more City of Ashland project, each with its own history, funding and procurements.

2 projects 11 solicitations 6 recent changes

Explore City of Ashland

City of Ashland's whole portfolio, solicitations and recent changes in one place.

Sources

34 facts · 22 official document versions

  1. Ashland Water Treatment Plant City of Ashland · retrieved Nov 14, 2026

    Inspect exact excerpt View official source

    List item on the official webpage

    Excerpt · List item on the official webpage
    “An invitation to bid for construction was released on September 20, 2026. The bid open is scheduled for November 5, 2026, at 1 p.m. All documents are available on OregonBuys. Construction is anticipated to start early winter 2026.”
    Facts from this document
    Construction bid opening scheduled
    Retrieved
    Nov 14, 2026
    Published
    Not stated
  2. Ashland Water Treatment Plant City of Ashland · retrieved Nov 5, 2026

    Inspect exact excerpt View official source

    List item on the official webpage

    Excerpt · List item on the official webpage
    “An invitation to bid for construction was released on September 20, 2026. The bid open is scheduled for November 5, 2026, at 1 p.m. All documents are available on OregonBuys. Construction is anticipated to start early winter 2026.”
    Facts from this document
    Active procurement
    Retrieved
    Nov 5, 2026
    Published
    Not stated
  3. Bid Summary Original 11.5.2026 (S-KA0010-00018090) Oregon public agencies via OregonBuys · retrieved Nov 5, 2026

    Inspect exact excerpt View official source

    PDF page 1

    Excerpt · PDF page 1
    “Project: AshlandWTP Onsite Project No: 2018-20 CityofAshland -Public Works Engineering-SummaryofProposals Date of BidOpening:11/5/2026@1pm Noof Addendums: 4 BID OPEN CHECKLIST Bidder 1: Bidder 2: Bidder 3: Bidder 4: Bidder 5: Bidder 6: Name of Bidder Emery & Sons ESI McAlvain McClure & Sons Slayden Constructors Pacific Excavation Construction Group Lump Sum Bid Price $ 67,908,651 $ 67,400,000 $ 69,270,024 $ 59,065,060 $ 56,490,000 $ 61,791,000 Alternative A Price $ 525,620 $ 950,000 $ 509,687 $ 1,050,000 $ 760,000 $ 1,050,000 Alternative B Price $ 559,673 $ 565,000 $ 547,501 $ 565,000 $ 620,000 $ 550,000 Contingency Allowance $ 300,000 $ 300,000 $ 300,000 $ 300,000 $ 300,000 $ 300,000 Unit Price U1 $ 647,850 $ 262,500 $ 278,550 $ 1,425,000 $ 300,000 $ 502,500 Unit Price U2 $ 318,750 $ 300,000 $ 998,625 $ 3,187,500 $ 375,000 $ 337,500 Total Lump Sum (All) $ 70,260,544 $ 69,777,500 $ 71,904,387 $ 65,592,560 $ 58,845,000 $ 64,531,000 Bid Administrative Items Responsive Responsive Non-Responsive Responsive Responsive Responsive Attended Mandatory Pre-bid Yes Yes Yes Yes Yes Yes Bidder Pre-Qualifications (w/in 5 days of Bid Open) Yes Yes No Yes Yes Yes Bid Form Signed Yes Yes Yes Yes Yes Yes Addenda 1 acknowledged Yes Yes Yes Yes Yes Yes Addenda 2 acknowledged Yes Yes Yes Yes Yes Yes Addenda 3 acknowledged Yes Yes Yes Yes Yes Yes Addenda 4 acknowledged Yes Yes Yes Yes Yes Yes A. Required Bid Security (Bond) 10% Zurich 10% Continental 10% Zurich 10% Federal 10% Zurich 10% Travelers B. List of Proposed Subcontractors Yes Yes No Yes Yes Yes C. Fist-Tier Subcontractor Disclosure Form Yes Yes Yes Yes Yes Yes D. List of Proposed Suppliers Yes Yes Yes Yes Yes Yes E. Proposed Major Equipment Form Yes Yes Yes Yes Yes Yes F. Evidance of Authority to do Business Yes Yes Yes Yes Yes Yes G. Contractors License Yes Yes Yes Yes Yes Yes H. Bidder Qualification Statement Yes Yes Yes Yes Yes Yes Results: Intent to Award Apparent Low Responsive Bidder - Slayden Constructors - $58,845,000”
    Also supports
    Official intent to award reported
    Retrieved
    Nov 5, 2026
  4. Ashland Water Treatment Plant Oregon public agencies via OregonBuys · retrieved Nov 5, 2026

    Inspect exact excerpt View official source

    Table row on the official webpage

    Excerpt · Table row on the official webpage
    “Bid Number: S-KA0010-00018090 Description: Ashland Water Treatment Plant Bid Opening Date: 11/05/2026 01:00:00 PM Purchaser: Scott Fleury Organization: City of Ashland Department: KA001006 - Public Works Location: KA002 - Engineering Fiscal Year: 27 Allow Electronic Quote: No Alternate Id: 2018-20 Required Date: 11/05/2026 Available Date : 09/29/2026 01:00:00 PM Info Contact: Scott Fleury, 541-488-5587, [email protected] Bid Type: OPEN Informal Bid Flag: No Purchase Method: Open Market Pre Bid Conference: Mandatory pre-bid conference for the Project will be held on Tuesday, October 13, 2026 at 10:00 AM at the Community Development building located at 51 Winburn Way, Ashland, OR 97520. Bulletin Desc: The City of Ashland is requesting Bids for the construction of the Ashland Creek Water Treatment Plant. The Project includes the Construction of a new drinking water treatment plant including raw water conveyance, pressure reduction, chemical pretreatment equipment, filtration, filtered water storage and pumping, chemical storage and metering, water and sewer lines, and all other work described in the contract documents for a complete and functioning system. Ship-to Address: Scott Fleury51 Winburn WayAshland, OR 97520USEmail: Phone: (541) 552-2412 Bill-to Address: Scott Fleury51 Winburn WayAshland, OR 97520USEmail: Phone: (541) 552-2412 Print Format: Bid Print New File Attachments: 1. 2026-10-19 Addendum No. 2.pdf 1a. Addendum No. 2 drawings - combined set.pdf 1b. 46 43 62 - BALLASTED FLOCCULATION SYSTEM.pdf 1. Addendum No. 3.pdf 2. Ashland WTP- AD 3 Drawings.pdf 3. 1948 WTP Drawings.pdf 4. 1995 WTP Drawings.pdf 1. Addendum No. 4.pdf 2. 00 41 13 - BID FORM Addendum No. 4.pdf 3. Ashland WTP Drawings Addendum No. 4.pdf Bid Summary Original 11.5.2026 (S-KA0010-00018090).pdf WTP Bid Advertisement.pdf City-of-Ashland_WTP_IFB-Specs_09252026-Front End Vol 1.pdf City-of-Ashland_WTP_IFB-Specs_09252026-Back End Vol 2.pdf City-of-Ashland_WTP_IFB-Drawings_09252026.pdf COA Prequal Application-2025-27~2.pdf 1. 2026-10-14 Addendum No. 1.pdf 2. 10.13.2026 7.0 MGD WTP Mandatory Pre-Bid Attendee List.pdf 3. 2026-10-13 Ashland WTP Pre-Bid Meeting Agenda and Notes.pdf 4. Ashland WTP GER - Vol 1.pdf 4a. Ashland WTP GER - Amendment - Vol 2.pdf Form Attachments: Required Quote Attachments Desired Attachment Name Description Discipline Type: Public Improvement Procurement Method: Competitive Sealed Bid Amendments: Amendment # Amendment Date Amendment Note 1 10/14/2026 02:46:17 PM Addendum No. 1 and Informational Uploads Attachment File Changes: Header 1. File '1. 2026-10-14 Addendum No. 1.pdf': File '1. 2026-10-14 Addendum No. 1.pdf' added . 2. File '2. 10.13.2026 7.0 MGD WTP Mandatory Pre-Bid Attendee List.pdf': File '2. 10.13.2026 7.0 MGD WTP Mandatory Pre-Bid Attendee List.pdf' added . 3. File '3. 2026-10-13 Ashland WTP Pre-Bid Meeting Agenda and Notes.pdf': File '3. 2026-10-13 Ashland WTP Pre-Bid Meeting Agenda and Notes.pdf' added . 4. File '4. Ashland WTP GER - Vol 1.pdf': File '4. Ashland WTP GER - Vol 1.pdf' added . 5. File '4a. Ashland WTP GER - Amendment - Vol 2.pdf': File '4a. Ashland WTP GER - Amendment - Vol 2.pdf' added . 2 10/20/2026 09:55:06 AM Addendum No. 2 Attachment File Changes: Header 1. File '1. 2026-10-19 Addendum No. 2.pdf': File '1. 2026-10-19 Addendum No. 2.pdf' added . 2. File '1a. Addendum No. 2 drawings - combined set.pdf': File '1a. Addendum No. 2 drawings - combined set.pdf' added . 3. File '1b. 46 43 62 - BALLASTED FLOCCULATION SYSTEM.pdf': File '1b. 46 43 62 - BALLASTED FLOCCULATION SYSTEM.pdf' added . 3 10/27/2026 10:58:50 AM Addendum No. 3 and Informational Uploads Attachment File Changes: Header 1. File '1. Addendum No. 3.pdf': File '1. Addendum No. 3.pdf' added . 2. File '2. Ashland WTP- AD 3 Drawings.pdf': File '2. Ashland WTP- AD 3 Drawings.pdf' added . 3. File '3. 1948 WTP Drawings.pdf': File '3. 1948 WTP Drawings.pdf' added . 4. File '4. 1995 WTP Drawings.pdf': File '4. 1995 WTP Drawings.pdf' added . 4 10/29/2026 05:43:42 PM Addendum No. 4 Attachment File Changes: Header 1. File '1. Addendum No. 4.pdf': File '1. Addendum No. 4.pdf' added . 2. File '2. 00 41 13 - BID FORM Addendum No. 4.pdf': File '2. 00 41 13 - BID FORM Addendum No. 4.pdf' added . 3. File '3. Ashland WTP Drawings Addendum No. 4.pdf': File '3. Ashland WTP Drawings Addendum No. 4.pdf' added . 5 11/05/2026 03:13:32 PM Bid Summary Attachment File Changes: Header 1. File 'Bid Summary Original 11.5.2026 (S-KA0010-00018090).pdf': File 'Bid Summary Original 11.5.2026 (S-KA0010-00018090).pdf' added . Item Information Item # 1: ( 913 - 60 ) The City of Ashland is requesting Bids for the construction of the Ashland Creek Water Treatment Plant. The Project includes the construction of a new drinking water treatment plant including raw water conveyance, pressure reduction, chemical pretreatment equipment, filtration, filtered water storage and pumping, chemical storage and metering, water and sewer lines, and all other work described in the contract documents for a complete and functioning system. NIGP Code: 913-60 Construction, Water System, Plants, Main and Service Line Qty Unit Cost UOM Total Discount Amt. Total Cost 1.0 EA - Each Manufacturer: Brand: Model: Make: Packaging: Item # 2: ( 913 - 92 ) The City of Ashland is requesting Bids for the construction of the Ashland Creek Water Treatment Plant. The Project includes the construction of a new drinking water treatment plant including raw water conveyance, pressure reduction, chemical pretreatment equipment, filtration, filtered water storage and pumping, chemical storage and metering, water and sewer lines, and all other work described in the contract documents for a complete and functioning system NIGP Code: 913-92 Maintenance and Repair, Water System, Main and Service Line Qty Unit Cost UOM Total Discount Amt. Total Cost 1.0 EA - Each Manufacturer: Brand: Model: Make: Packaging: Item # 3: ( 909 - 30 ) The City of Ashland is requesting Bids for the construction of the Ashland Creek Water Treatment Plant. The Project includes the construction of a new drinking water treatment plant including raw water conveyance, pressure reduction, chemical pretreatment equipment, filtration, filtered water storage and pumping, chemical storage and metering, water and sewer lines, and all other work described in the contract documents for a complete and functioning system NIGP Code: 909-30 Building Construction, (Not Otherwise Classified) Qty Unit Cost UOM Total Discount Amt. Total Cost 1.0 EA - Each Manufacturer: Brand: Model: Make: Packaging: Copyright © 2026 Periscope Holdings, Inc. - All Rights Reserved. window.dataLayer = window.dataLayer || []; window.dataLayer.push({ 'event': 'uxToggle', 'uxChosen': 'old' }); (function(w,d,s,l,i) { w[l]=w[l]||[]; w[l].push( { 'gtm.start': new Date().getTime(), event:'gtm.js' } ); let f=d.getElementsByTagName(s)[0], j=d.createElement(s),dl=l!='dataLayer'?'&l='+l:''; j.async=true; j.src= 'https://www.googletagmanager.com/gtm.js?id='+i+dl; f.parentNode.insertBefore(j,f); })(window,document,'script','dataLayer','GTM-TDBMP45Z');”
    Also supports
    Ashland Water Treatment Plant
    Retrieved
    Nov 5, 2026
    Published
    Not stated
  5. Ashland Water Treatment Plant City of Ashland · retrieved Oct 30, 2026

    Inspect exact excerpt View official source

    List item on the official webpage

    Excerpt · List item on the official webpage
    “An invitation to bid for construction was released on September 20, 2026. The bid open is scheduled for November 5, 2026, at 1 p.m. All documents are available on OregonBuys. Construction is anticipated to start early winter 2026.”
    Facts from this document
    Active procurement
    Retrieved
    Oct 30, 2026
    Published
    Not stated
  6. Ashland Water Treatment Plant Oregon public agencies via OregonBuys · retrieved Oct 30, 2026

    Inspect exact excerpt View official source

    Table row on the official webpage

    Excerpt · Table row on the official webpage
    “Bid Number: S-KA0010-00018090 Description: Ashland Water Treatment Plant Bid Opening Date: 11/05/2026 01:00:00 PM Purchaser: Scott Fleury Organization: City of Ashland Department: KA001006 - Public Works Location: KA002 - Engineering Fiscal Year: 27 Allow Electronic Quote: No Alternate Id: 2018-20 Required Date: 11/05/2026 Available Date : 09/29/2026 01:00:00 PM Info Contact: Scott Fleury, 541-488-5587, [email protected] Bid Type: OPEN Informal Bid Flag: No Purchase Method: Open Market Pre Bid Conference: Mandatory pre-bid conference for the Project will be held on Tuesday, October 13, 2026 at 10:00 AM at the Community Development building located at 51 Winburn Way, Ashland, OR 97520. Bulletin Desc: The City of Ashland is requesting Bids for the construction of the Ashland Creek Water Treatment Plant. The Project includes the Construction of a new drinking water treatment plant including raw water conveyance, pressure reduction, chemical pretreatment equipment, filtration, filtered water storage and pumping, chemical storage and metering, water and sewer lines, and all other work described in the contract documents for a complete and functioning system. Ship-to Address: Scott Fleury51 Winburn WayAshland, OR 97520USEmail: Phone: (541) 552-2412 Bill-to Address: Scott Fleury51 Winburn WayAshland, OR 97520USEmail: Phone: (541) 552-2412 Print Format: Bid Print New File Attachments: 1. 2026-10-19 Addendum No. 2.pdf 1a. Addendum No. 2 drawings - combined set.pdf 1b. 46 43 62 - BALLASTED FLOCCULATION SYSTEM.pdf 1. Addendum No. 3.pdf 2. Ashland WTP- AD 3 Drawings.pdf 3. 1948 WTP Drawings.pdf 4. 1995 WTP Drawings.pdf 1. Addendum No. 4.pdf 2. 00 41 13 - BID FORM Addendum No. 4.pdf 3. Ashland WTP Drawings Addendum No. 4.pdf WTP Bid Advertisement.pdf City-of-Ashland_WTP_IFB-Specs_09252026-Front End Vol 1.pdf City-of-Ashland_WTP_IFB-Specs_09252026-Back End Vol 2.pdf City-of-Ashland_WTP_IFB-Drawings_09252026.pdf COA Prequal Application-2025-27~2.pdf 1. 2026-10-14 Addendum No. 1.pdf 2. 10.13.2026 7.0 MGD WTP Mandatory Pre-Bid Attendee List.pdf 3. 2026-10-13 Ashland WTP Pre-Bid Meeting Agenda and Notes.pdf 4. Ashland WTP GER - Vol 1.pdf 4a. Ashland WTP GER - Amendment - Vol 2.pdf Form Attachments: Required Quote Attachments Desired Attachment Name Description Discipline Type: Public Improvement Procurement Method: Competitive Sealed Bid Amendments: Amendment # Amendment Date Amendment Note 1 10/14/2026 02:46:17 PM Addendum No. 1 and Informational Uploads Attachment File Changes: Header 1. File '1. 2026-10-14 Addendum No. 1.pdf': File '1. 2026-10-14 Addendum No. 1.pdf' added . 2. File '2. 10.13.2026 7.0 MGD WTP Mandatory Pre-Bid Attendee List.pdf': File '2. 10.13.2026 7.0 MGD WTP Mandatory Pre-Bid Attendee List.pdf' added . 3. File '3. 2026-10-13 Ashland WTP Pre-Bid Meeting Agenda and Notes.pdf': File '3. 2026-10-13 Ashland WTP Pre-Bid Meeting Agenda and Notes.pdf' added . 4. File '4. Ashland WTP GER - Vol 1.pdf': File '4. Ashland WTP GER - Vol 1.pdf' added . 5. File '4a. Ashland WTP GER - Amendment - Vol 2.pdf': File '4a. Ashland WTP GER - Amendment - Vol 2.pdf' added . 2 10/20/2026 09:55:06 AM Addendum No. 2 Attachment File Changes: Header 1. File '1. 2026-10-19 Addendum No. 2.pdf': File '1. 2026-10-19 Addendum No. 2.pdf' added . 2. File '1a. Addendum No. 2 drawings - combined set.pdf': File '1a. Addendum No. 2 drawings - combined set.pdf' added . 3. File '1b. 46 43 62 - BALLASTED FLOCCULATION SYSTEM.pdf': File '1b. 46 43 62 - BALLASTED FLOCCULATION SYSTEM.pdf' added . 3 10/27/2026 10:58:50 AM Addendum No. 3 and Informational Uploads Attachment File Changes: Header 1. File '1. Addendum No. 3.pdf': File '1. Addendum No. 3.pdf' added . 2. File '2. Ashland WTP- AD 3 Drawings.pdf': File '2. Ashland WTP- AD 3 Drawings.pdf' added . 3. File '3. 1948 WTP Drawings.pdf': File '3. 1948 WTP Drawings.pdf' added . 4. File '4. 1995 WTP Drawings.pdf': File '4. 1995 WTP Drawings.pdf' added . 4 10/29/2026 05:43:42 PM Addendum No. 4 Attachment File Changes: Header 1. File '1. Addendum No. 4.pdf': File '1. Addendum No. 4.pdf' added . 2. File '2. 00 41 13 - BID FORM Addendum No. 4.pdf': File '2. 00 41 13 - BID FORM Addendum No. 4.pdf' added . 3. File '3. Ashland WTP Drawings Addendum No. 4.pdf': File '3. Ashland WTP Drawings Addendum No. 4.pdf' added . Item Information Item # 1: ( 913 - 60 ) The City of Ashland is requesting Bids for the construction of the Ashland Creek Water Treatment Plant. The Project includes the construction of a new drinking water treatment plant including raw water conveyance, pressure reduction, chemical pretreatment equipment, filtration, filtered water storage and pumping, chemical storage and metering, water and sewer lines, and all other work described in the contract documents for a complete and functioning system. NIGP Code: 913-60 Construction, Water System, Plants, Main and Service Line Qty Unit Cost UOM Total Discount Amt. Total Cost 1.0 EA - Each Manufacturer: Brand: Model: Make: Packaging: Item # 2: ( 913 - 92 ) The City of Ashland is requesting Bids for the construction of the Ashland Creek Water Treatment Plant. The Project includes the construction of a new drinking water treatment plant including raw water conveyance, pressure reduction, chemical pretreatment equipment, filtration, filtered water storage and pumping, chemical storage and metering, water and sewer lines, and all other work described in the contract documents for a complete and functioning system NIGP Code: 913-92 Maintenance and Repair, Water System, Main and Service Line Qty Unit Cost UOM Total Discount Amt. Total Cost 1.0 EA - Each Manufacturer: Brand: Model: Make: Packaging: Item # 3: ( 909 - 30 ) The City of Ashland is requesting Bids for the construction of the Ashland Creek Water Treatment Plant. The Project includes the construction of a new drinking water treatment plant including raw water conveyance, pressure reduction, chemical pretreatment equipment, filtration, filtered water storage and pumping, chemical storage and metering, water and sewer lines, and all other work described in the contract documents for a complete and functioning system NIGP Code: 909-30 Building Construction, (Not Otherwise Classified) Qty Unit Cost UOM Total Discount Amt. Total Cost 1.0 EA - Each Manufacturer: Brand: Model: Make: Packaging: Copyright © 2026 Periscope Holdings, Inc. - All Rights Reserved. window.dataLayer = window.dataLayer || []; window.dataLayer.push({ 'event': 'uxToggle', 'uxChosen': 'old' }); (function(w,d,s,l,i) { w[l]=w[l]||[]; w[l].push( { 'gtm.start': new Date().getTime(), event:'gtm.js' } ); let f=d.getElementsByTagName(s)[0], j=d.createElement(s),dl=l!='dataLayer'?'&l='+l:''; j.async=true; j.src= 'https://www.googletagmanager.com/gtm.js?id='+i+dl; f.parentNode.insertBefore(j,f); })(window,document,'script','dataLayer','GTM-TDBMP45Z');”
    Also supports
    1. Addendum No. 4 published
    Retrieved
    Oct 30, 2026
    Published
    Not stated
All 22 sources
  1. Ashland Water Treatment Plant Oregon public agencies via OregonBuys · retrieved Oct 28, 2026

    Inspect exact excerpt View official source

    Table row on the official webpage

    Excerpt · Table row on the official webpage
    “Bid Number: S-KA0010-00018090 Description: Ashland Water Treatment Plant Bid Opening Date: 11/05/2026 01:00:00 PM Purchaser: Scott Fleury Organization: City of Ashland Department: KA001006 - Public Works Location: KA002 - Engineering Fiscal Year: 27 Allow Electronic Quote: No Alternate Id: 2018-20 Required Date: 11/05/2026 Available Date : 09/29/2026 01:00:00 PM Info Contact: Scott Fleury, 541-488-5587, [email protected] Bid Type: OPEN Informal Bid Flag: No Purchase Method: Open Market Pre Bid Conference: Mandatory pre-bid conference for the Project will be held on Tuesday, October 13, 2026 at 10:00 AM at the Community Development building located at 51 Winburn Way, Ashland, OR 97520. Bulletin Desc: The City of Ashland is requesting Bids for the construction of the Ashland Creek Water Treatment Plant. The Project includes the Construction of a new drinking water treatment plant including raw water conveyance, pressure reduction, chemical pretreatment equipment, filtration, filtered water storage and pumping, chemical storage and metering, water and sewer lines, and all other work described in the contract documents for a complete and functioning system. Ship-to Address: Scott Fleury51 Winburn WayAshland, OR 97520USEmail: Phone: (541) 552-2412 Bill-to Address: Scott Fleury51 Winburn WayAshland, OR 97520USEmail: Phone: (541) 552-2412 Print Format: Bid Print New File Attachments: 1. 2026-10-19 Addendum No. 2.pdf 1a. Addendum No. 2 drawings - combined set.pdf 1b. 46 43 62 - BALLASTED FLOCCULATION SYSTEM.pdf 1. Addendum No. 3.pdf 2. Ashland WTP- AD 3 Drawings.pdf 3. 1948 WTP Drawings.pdf 4. 1995 WTP Drawings.pdf WTP Bid Advertisement.pdf City-of-Ashland_WTP_IFB-Specs_09252026-Front End Vol 1.pdf City-of-Ashland_WTP_IFB-Specs_09252026-Back End Vol 2.pdf City-of-Ashland_WTP_IFB-Drawings_09252026.pdf COA Prequal Application-2025-27~2.pdf 1. 2026-10-14 Addendum No. 1.pdf 2. 10.13.2026 7.0 MGD WTP Mandatory Pre-Bid Attendee List.pdf 3. 2026-10-13 Ashland WTP Pre-Bid Meeting Agenda and Notes.pdf 4. Ashland WTP GER - Vol 1.pdf 4a. Ashland WTP GER - Amendment - Vol 2.pdf Form Attachments: Required Quote Attachments Desired Attachment Name Description Discipline Type: Public Improvement Procurement Method: Competitive Sealed Bid Amendments: Amendment # Amendment Date Amendment Note 1 10/14/2026 02:46:17 PM Addendum No. 1 and Informational Uploads Attachment File Changes: Header 1. File '1. 2026-10-14 Addendum No. 1.pdf': File '1. 2026-10-14 Addendum No. 1.pdf' added . 2. File '2. 10.13.2026 7.0 MGD WTP Mandatory Pre-Bid Attendee List.pdf': File '2. 10.13.2026 7.0 MGD WTP Mandatory Pre-Bid Attendee List.pdf' added . 3. File '3. 2026-10-13 Ashland WTP Pre-Bid Meeting Agenda and Notes.pdf': File '3. 2026-10-13 Ashland WTP Pre-Bid Meeting Agenda and Notes.pdf' added . 4. File '4. Ashland WTP GER - Vol 1.pdf': File '4. Ashland WTP GER - Vol 1.pdf' added . 5. File '4a. Ashland WTP GER - Amendment - Vol 2.pdf': File '4a. Ashland WTP GER - Amendment - Vol 2.pdf' added . 2 10/20/2026 09:55:06 AM Addendum No. 2 Attachment File Changes: Header 1. File '1. 2026-10-19 Addendum No. 2.pdf': File '1. 2026-10-19 Addendum No. 2.pdf' added . 2. File '1a. Addendum No. 2 drawings - combined set.pdf': File '1a. Addendum No. 2 drawings - combined set.pdf' added . 3. File '1b. 46 43 62 - BALLASTED FLOCCULATION SYSTEM.pdf': File '1b. 46 43 62 - BALLASTED FLOCCULATION SYSTEM.pdf' added . 3 10/27/2026 10:58:50 AM Addendum No. 3 and Informational Uploads Attachment File Changes: Header 1. File '1. Addendum No. 3.pdf': File '1. Addendum No. 3.pdf' added . 2. File '2. Ashland WTP- AD 3 Drawings.pdf': File '2. Ashland WTP- AD 3 Drawings.pdf' added . 3. File '3. 1948 WTP Drawings.pdf': File '3. 1948 WTP Drawings.pdf' added . 4. File '4. 1995 WTP Drawings.pdf': File '4. 1995 WTP Drawings.pdf' added . Item Information Item # 1: ( 913 - 60 ) The City of Ashland is requesting Bids for the construction of the Ashland Creek Water Treatment Plant. The Project includes the construction of a new drinking water treatment plant including raw water conveyance, pressure reduction, chemical pretreatment equipment, filtration, filtered water storage and pumping, chemical storage and metering, water and sewer lines, and all other work described in the contract documents for a complete and functioning system. NIGP Code: 913-60 Construction, Water System, Plants, Main and Service Line Qty Unit Cost UOM Total Discount Amt. Total Cost 1.0 EA - Each Manufacturer: Brand: Model: Make: Packaging: Item # 2: ( 913 - 92 ) The City of Ashland is requesting Bids for the construction of the Ashland Creek Water Treatment Plant. The Project includes the construction of a new drinking water treatment plant including raw water conveyance, pressure reduction, chemical pretreatment equipment, filtration, filtered water storage and pumping, chemical storage and metering, water and sewer lines, and all other work described in the contract documents for a complete and functioning system NIGP Code: 913-92 Maintenance and Repair, Water System, Main and Service Line Qty Unit Cost UOM Total Discount Amt. Total Cost 1.0 EA - Each Manufacturer: Brand: Model: Make: Packaging: Item # 3: ( 909 - 30 ) The City of Ashland is requesting Bids for the construction of the Ashland Creek Water Treatment Plant. The Project includes the construction of a new drinking water treatment plant including raw water conveyance, pressure reduction, chemical pretreatment equipment, filtration, filtered water storage and pumping, chemical storage and metering, water and sewer lines, and all other work described in the contract documents for a complete and functioning system NIGP Code: 909-30 Building Construction, (Not Otherwise Classified) Qty Unit Cost UOM Total Discount Amt. Total Cost 1.0 EA - Each Manufacturer: Brand: Model: Make: Packaging: Copyright © 2026 Periscope Holdings, Inc. - All Rights Reserved. window.dataLayer = window.dataLayer || []; window.dataLayer.push({ 'event': 'uxToggle', 'uxChosen': 'old' }); (function(w,d,s,l,i) { w[l]=w[l]||[]; w[l].push( { 'gtm.start': new Date().getTime(), event:'gtm.js' } ); let f=d.getElementsByTagName(s)[0], j=d.createElement(s),dl=l!='dataLayer'?'&l='+l:''; j.async=true; j.src= 'https://www.googletagmanager.com/gtm.js?id='+i+dl; f.parentNode.insertBefore(j,f); })(window,document,'script','dataLayer','GTM-TDBMP45Z');”
    Also supports
    1. Addendum No. 3 published
    Retrieved
    Oct 28, 2026
    Published
    Not stated
  2. Ashland Water Treatment Plant City of Ashland · retrieved Oct 28, 2026

    Inspect exact excerpt View official source

    List item on the official webpage

    Excerpt · List item on the official webpage
    “An invitation to bid for construction was released on September 20, 2026. The bid open is scheduled for November 5, 2026, at 1 p.m. All documents are available on OregonBuys. Construction is anticipated to start early winter 2026.”
    Facts from this document
    Active procurement
    Retrieved
    Oct 28, 2026
    Published
    Not stated
  3. Ashland Water Treatment Plant City of Ashland · retrieved Oct 24, 2026

    Inspect exact excerpt View official source

    List item on the official webpage

    Excerpt · List item on the official webpage
    “An invitation to bid for construction was released on September 20, 2026. The bid open is scheduled for November 5, 2026, at 1 p.m. All documents are available on OregonBuys. Construction is anticipated to start early winter 2026.”
    Facts from this document
    Active procurement
    Retrieved
    Oct 24, 2026
    Published
    Not stated
  4. Ashland Water Treatment Plant Oregon public agencies via OregonBuys · retrieved Oct 15, 2026

    Inspect exact excerpt View official source

    Table row on the official webpage

    Excerpt · Table row on the official webpage
    “Bid Number: S-KA0010-00018090 Description: Ashland Water Treatment Plant Bid Opening Date: 11/05/2026 01:00:00 PM Purchaser: Scott Fleury Organization: City of Ashland Department: KA001006 - Public Works Location: KA002 - Engineering Fiscal Year: 27 Allow Electronic Quote: No Alternate Id: 2018-20 Required Date: 11/05/2026 Available Date : 09/29/2026 01:00:00 PM Info Contact: Scott Fleury, 541-488-5587, [email protected] Bid Type: OPEN Informal Bid Flag: No Purchase Method: Open Market Pre Bid Conference: Mandatory pre-bid conference for the Project will be held on Tuesday, October 13, 2026 at 10:00 AM at the Community Development building located at 51 Winburn Way, Ashland, OR 97520. Bulletin Desc: The City of Ashland is requesting Bids for the construction of the Ashland Creek Water Treatment Plant. The Project includes the Construction of a new drinking water treatment plant including raw water conveyance, pressure reduction, chemical pretreatment equipment, filtration, filtered water storage and pumping, chemical storage and metering, water and sewer lines, and all other work described in the contract documents for a complete and functioning system. Ship-to Address: Scott Fleury51 Winburn WayAshland, OR 97520USEmail: Phone: (541) 552-2412 Bill-to Address: Scott Fleury51 Winburn WayAshland, OR 97520USEmail: Phone: (541) 552-2412 Print Format: Bid Print New File Attachments: WTP Bid Advertisement.pdf City-of-Ashland_WTP_IFB-Specs_09252026-Front End Vol 1.pdf City-of-Ashland_WTP_IFB-Specs_09252026-Back End Vol 2.pdf City-of-Ashland_WTP_IFB-Drawings_09252026.pdf COA Prequal Application-2025-27~2.pdf 1. 2026-10-14 Addendum No. 1.pdf 2. 10.13.2026 7.0 MGD WTP Mandatory Pre-Bid Attendee List.pdf 3. 2026-10-13 Ashland WTP Pre-Bid Meeting Agenda and Notes.pdf 4. Ashland WTP GER - Vol 1.pdf 4a. Ashland WTP GER - Amendment - Vol 2.pdf Form Attachments: Required Quote Attachments Desired Attachment Name Description Discipline Type: Public Improvement Procurement Method: Competitive Sealed Bid Amendments: Amendment # Amendment Date Amendment Note 1 10/14/2026 02:46:17 PM Addendum No. 1 and Informational Uploads Attachment File Changes: Header 1. File '1. 2026-10-14 Addendum No. 1.pdf': File '1. 2026-10-14 Addendum No. 1.pdf' added . 2. File '2. 10.13.2026 7.0 MGD WTP Mandatory Pre-Bid Attendee List.pdf': File '2. 10.13.2026 7.0 MGD WTP Mandatory Pre-Bid Attendee List.pdf' added . 3. File '3. 2026-10-13 Ashland WTP Pre-Bid Meeting Agenda and Notes.pdf': File '3. 2026-10-13 Ashland WTP Pre-Bid Meeting Agenda and Notes.pdf' added . 4. File '4. Ashland WTP GER - Vol 1.pdf': File '4. Ashland WTP GER - Vol 1.pdf' added . 5. File '4a. Ashland WTP GER - Amendment - Vol 2.pdf': File '4a. Ashland WTP GER - Amendment - Vol 2.pdf' added . Item Information Item # 1: ( 913 - 60 ) The City of Ashland is requesting Bids for the construction of the Ashland Creek Water Treatment Plant. The Project includes the construction of a new drinking water treatment plant including raw water conveyance, pressure reduction, chemical pretreatment equipment, filtration, filtered water storage and pumping, chemical storage and metering, water and sewer lines, and all other work described in the contract documents for a complete and functioning system. NIGP Code: 913-60 Construction, Water System, Plants, Main and Service Line Qty Unit Cost UOM Total Discount Amt. Total Cost 1.0 EA - Each Manufacturer: Brand: Model: Make: Packaging: Item # 2: ( 913 - 92 ) The City of Ashland is requesting Bids for the construction of the Ashland Creek Water Treatment Plant. The Project includes the construction of a new drinking water treatment plant including raw water conveyance, pressure reduction, chemical pretreatment equipment, filtration, filtered water storage and pumping, chemical storage and metering, water and sewer lines, and all other work described in the contract documents for a complete and functioning system NIGP Code: 913-92 Maintenance and Repair, Water System, Main and Service Line Qty Unit Cost UOM Total Discount Amt. Total Cost 1.0 EA - Each Manufacturer: Brand: Model: Make: Packaging: Item # 3: ( 909 - 30 ) The City of Ashland is requesting Bids for the construction of the Ashland Creek Water Treatment Plant. The Project includes the construction of a new drinking water treatment plant including raw water conveyance, pressure reduction, chemical pretreatment equipment, filtration, filtered water storage and pumping, chemical storage and metering, water and sewer lines, and all other work described in the contract documents for a complete and functioning system NIGP Code: 909-30 Building Construction, (Not Otherwise Classified) Qty Unit Cost UOM Total Discount Amt. Total Cost 1.0 EA - Each Manufacturer: Brand: Model: Make: Packaging: Copyright © 2026 Periscope Holdings, Inc. - All Rights Reserved. window.dataLayer = window.dataLayer || []; window.dataLayer.push({ 'event': 'uxToggle', 'uxChosen': 'old' }); (function(w,d,s,l,i) { w[l]=w[l]||[]; w[l].push( { 'gtm.start': new Date().getTime(), event:'gtm.js' } ); let f=d.getElementsByTagName(s)[0], j=d.createElement(s),dl=l!='dataLayer'?'&l='+l:''; j.async=true; j.src= 'https://www.googletagmanager.com/gtm.js?id='+i+dl; f.parentNode.insertBefore(j,f); })(window,document,'script','dataLayer','GTM-TDBMP45Z');”
    Also supports
    1. 2026-10-14 Addendum No. 1 published
    Retrieved
    Oct 15, 2026
    Published
    Not stated
  5. Ashland Water Treatment Plant Oregon public agencies via OregonBuys · retrieved Oct 12, 2026

    Inspect exact excerpt View official source

    Table row on the official webpage

    Excerpt · Table row on the official webpage
    “The City of Ashland is requesting Bids for the construction of the Ashland Creek Water Treatment Plant. The Project includes the Construction of a new drinking water treatment plant including raw water conveyance, pressure reduction, chemical pretreatment equipment, filtration, filtered water storage and pumping, chemical storage and metering, water and sewer lines, and all other work described in the contract documents for a complete and functioning system.”
    Facts from this document
    Project scope
    Retrieved
    Oct 12, 2026
    Published
    Not stated
  6. ITB Preparation Support and Project Management of a 7 Million Gallon a Day Water Treatment Plant Oregon public agencies via OregonBuys · retrieved Oct 4, 2026

    Inspect exact excerpt View official source

    Table row on the official webpage

    Excerpt · Table row on the official webpage
    “Bid Number: S-KA0010-00016217 Description: ITB PREPARATION SUPPORT AND PROJECT MANAGEMENT OF A 7 MILLION GALLON A DAY WATER TREATMENT PLANT Bid Opening Date: 04/07/2026 02:00:00 PM Purchaser: Chance Metcalf Organization: City of Ashland Department: KA001006 - Public Works Location: KA001 - Public Works Fiscal Year: 27 Allow Electronic Quote: No Alternate Id: 2018-20 Required Date: 04/07/2026 Available Date : 03/05/2026 02:56:07 PM Info Contact: Scott Fleury, 541-488-5587, [email protected] Bid Type: OPEN Informal Bid Flag: No Purchase Method: Open Market Pre Bid Conference: N/A Bulletin Desc: The City of Ashland (City) is seeking qualifications-based proposals from professional engineering consultants for all engineering services required for Project 2018-20, ITB PREPARATION SUPPORT AND PROJECT MANAGEMENT OF A 7 MILLION GALLON A DAY WATER TREATMENT PLANT Ship-to Address: Chance Metcalf51 Winburn WayAshland, OR 97520USEmail: Phone: (541) 552-2448 Bill-to Address: Chance Metcalf51 Winburn WayAshland, OR 97520USEmail: Phone: (541) 552-2448 Print Format: Bid Print New File Attachments: 20-18 RFP for WTP ITB Support and Project Management - Final.pdf Form Attachments: Required Quote Attachments Desired Attachment Name Description Discipline Type: Personal Services Procurement Method: Competitive Sealed Proposal Item Information Item # 1: ( 958 - 77 ) The City of Ashland (City) is seeking qualifications-based proposals from professional engineering consultants for all engineering services required for Project 2018-20, ITB PREPARATION SUPPORT AND PROJECT MANAGEMENT OF A 7 MILLION GALLON A DAY WATER TREATMENT PLANT NIGP Code: 958-77 Project Management Services Qty Unit Cost UOM Total Discount Amt. Total Cost 1.0 EA - Each Manufacturer: Brand: Model: Make: Packaging: Copyright © 2026 Periscope Holdings, Inc. - All Rights Reserved. window.dataLayer = window.dataLayer || []; window.dataLayer.push({ 'event': 'uxToggle', 'uxChosen': 'old' }); (function(w,d,s,l,i) { w[l]=w[l]||[]; w[l].push( { 'gtm.start': new Date().getTime(), event:'gtm.js' } ); let f=d.getElementsByTagName(s)[0], j=d.createElement(s),dl=l!='dataLayer'?'&l='+l:''; j.async=true; j.src= 'https://www.googletagmanager.com/gtm.js?id='+i+dl; f.parentNode.insertBefore(j,f); })(window,document,'script','dataLayer','GTM-TDBMP45Z');”
    Also supports
    ITB PREPARATION SUPPORT AND PROJECT MANAGEMENT OF A 7 MILLION GALLON A DAY WATER TREATMENT PLANT
    Retrieved
    Oct 4, 2026
    Published
    Not stated
  7. Ashland Water Treatment Plant Oregon public agencies via OregonBuys · retrieved Oct 4, 2026

    Inspect exact excerpt View official source

    Table row on the official webpage

    Excerpt · Table row on the official webpage
    “Bid Number: S-KA0010-00018090 Description: Ashland Water Treatment Plant Bid Opening Date: 11/05/2026 01:00:00 PM Purchaser: Scott Fleury Organization: City of Ashland Department: KA001006 - Public Works Location: KA002 - Engineering Fiscal Year: 27 Allow Electronic Quote: No Alternate Id: 2018-20 Required Date: 11/05/2026 Available Date : 09/29/2026 01:00:00 PM Info Contact: Scott Fleury, 541-488-5587, [email protected] Bid Type: OPEN Informal Bid Flag: No Purchase Method: Open Market Pre Bid Conference: Mandatory pre-bid conference for the Project will be held on Tuesday, October 13, 2026 at 10:00 AM at the Community Development building located at 51 Winburn Way, Ashland, OR 97520. Bulletin Desc: The City of Ashland is requesting Bids for the construction of the Ashland Creek Water Treatment Plant. The Project includes the Construction of a new drinking water treatment plant including raw water conveyance, pressure reduction, chemical pretreatment equipment, filtration, filtered water storage and pumping, chemical storage and metering, water and sewer lines, and all other work described in the contract documents for a complete and functioning system. Ship-to Address: Scott Fleury51 Winburn WayAshland, OR 97520USEmail: Phone: (541) 552-2412 Bill-to Address: Scott Fleury51 Winburn WayAshland, OR 97520USEmail: Phone: (541) 552-2412 Print Format: Bid Print New File Attachments: WTP Bid Advertisement.pdf City-of-Ashland_WTP_IFB-Specs_09252026-Front End Vol 1.pdf City-of-Ashland_WTP_IFB-Specs_09252026-Back End Vol 2.pdf City-of-Ashland_WTP_IFB-Drawings_09252026.pdf COA Prequal Application-2025-27~2.pdf Form Attachments: Required Quote Attachments Desired Attachment Name Description Discipline Type: Public Improvement Procurement Method: Competitive Sealed Bid Item Information Item # 1: ( 913 - 60 ) The City of Ashland is requesting Bids for the construction of the Ashland Creek Water Treatment Plant. The Project includes the construction of a new drinking water treatment plant including raw water conveyance, pressure reduction, chemical pretreatment equipment, filtration, filtered water storage and pumping, chemical storage and metering, water and sewer lines, and all other work described in the contract documents for a complete and functioning system. NIGP Code: 913-60 Construction, Water System, Plants, Main and Service Line Qty Unit Cost UOM Total Discount Amt. Total Cost 1.0 EA - Each Manufacturer: Brand: Model: Make: Packaging: Item # 2: ( 913 - 92 ) The City of Ashland is requesting Bids for the construction of the Ashland Creek Water Treatment Plant. The Project includes the construction of a new drinking water treatment plant including raw water conveyance, pressure reduction, chemical pretreatment equipment, filtration, filtered water storage and pumping, chemical storage and metering, water and sewer lines, and all other work described in the contract documents for a complete and functioning system NIGP Code: 913-92 Maintenance and Repair, Water System, Main and Service Line Qty Unit Cost UOM Total Discount Amt. Total Cost 1.0 EA - Each Manufacturer: Brand: Model: Make: Packaging: Item # 3: ( 909 - 30 ) The City of Ashland is requesting Bids for the construction of the Ashland Creek Water Treatment Plant. The Project includes the construction of a new drinking water treatment plant including raw water conveyance, pressure reduction, chemical pretreatment equipment, filtration, filtered water storage and pumping, chemical storage and metering, water and sewer lines, and all other work described in the contract documents for a complete and functioning system NIGP Code: 909-30 Building Construction, (Not Otherwise Classified) Qty Unit Cost UOM Total Discount Amt. Total Cost 1.0 EA - Each Manufacturer: Brand: Model: Make: Packaging: Copyright © 2026 Periscope Holdings, Inc. - All Rights Reserved. window.dataLayer = window.dataLayer || []; window.dataLayer.push({ 'event': 'uxToggle', 'uxChosen': 'old' }); (function(w,d,s,l,i) { w[l]=w[l]||[]; w[l].push( { 'gtm.start': new Date().getTime(), event:'gtm.js' } ); let f=d.getElementsByTagName(s)[0], j=d.createElement(s),dl=l!='dataLayer'?'&l='+l:''; j.async=true; j.src= 'https://www.googletagmanager.com/gtm.js?id='+i+dl; f.parentNode.insertBefore(j,f); })(window,document,'script','dataLayer','GTM-TDBMP45Z');”
    Also supports
    Formal procurement opportunity published
    Retrieved
    Oct 4, 2026
    Published
    Not stated
  8. Ashland plant financing news release March 21, 2024 City of Ashland · retrieved Oct 4, 2026

    Inspect exact excerpt View official source

    PDF page 1

    Excerpt · PDF page 1
    “News Release FOR IMMEDIATE RELEASE PLEASE Ashland City Council passes a resolution with favorable financing terms from the Environmental Protection Agency to construct and move the water treatment plant CONTACT: Sabrina Cotta, Interim City Manager/Deputy City Manager City of Ashland 541.552.2106 [email protected] March 21, 2024 Clean drinking water – An essential right Contaminated drinking water transmits diseases such as diarrhea, cholera, dysentery, typhoid and polio and is estimated to cause approximately 505,000 diarrheal deaths each year, according to the World Health Organization. Water crises across the United States have highlighted the continued fight for access to clean drinking water. From Texas, Mississippi, Maryland, Michigan, New Mexico to Hawaii, ABC News reports ongoing water crises that require people to boil their water before cooking, bathing and drinking due to many reasons, including water treatment plant failures. It is often taken for granted that the small town of Ashland not only has safe drinking water, but perhaps one of the cleanest drinking water sources due to the region and the good work of the City’s Water Department. However, the City of Ashland’s water treatment plant was constructed in 1948 and is reaching the end of its useful life. It is located in a steep, narrow canyon where landslide, fire, flood and earthquake risk could compromise its ability to produce potable water for the community. The existing plant also has limited treatment capacity for changes in raw water quality, specifically for algal toxins, which are rapid growth algae that can cause harm to people, animals and the local ecology. The good news is that the City has been planning for the eventual replacement of the treatment plant at a new, safer location. This project has been in development since 2012 when it was first identified in the Comprehensive Water Master Plan approved by Council at that time. Since then, the City has gone through preliminary and final engineering for design of the new plant in order to move into the construction phase, where the City is now. To support the project, City Council recently passed a resolution with favorable financing terms from the Environmental Protection Agency (EPA) to construct and move the plant to a new location to mitigate the risks. This new water treatment plant will support Ashlander’s drinking water need for the next two to three generations.”
    Also supports
    City publishes plant relocation and EPA borrowing news release
    Retrieved
    Oct 4, 2026
  9. EPA WIFIA closed loans United States Environmental Protection Agency · retrieved Oct 4, 2026

    Inspect exact excerpt View official source

    Official webpage passage

    Excerpt · Official webpage passage
    “City of Ashland (pdf) (439.81 KB) Ashland Water Treatment Plant Project Oregon 12/17/2025 $73 million Conforms with WIFIA PEA”
    Also supports
    EPA records WIFIA loan closing for Ashland water treatment program and funding record
    Retrieved
    Oct 4, 2026
    Published
    Feb 4, 2020
  10. EPA Ashland WIFIA factsheet United States Environmental Protection Agency · retrieved Oct 4, 2026

    Inspect exact excerpt View official source

    PDF page 1

    Excerpt · PDF page 1
    “The Water Infrastructure Finance and Innovation Act (WIFIA) program accelerates investment in our nation’s water infrastructure by providing long-term, low-cost supplemental loans for regionally and nationally significant projects. A S H L A N D W A T ER TR E A T M EN T PL A NT P R OJ EC T BORROWER: City of Ashland LOCATION: Ashland, Oregon WIFIA LOAN AMOUNT: $73 million TOTAL WIFIA PROJECT COSTS: $113 million POPULATION SERVED BY PROJECT: 21,000 people Photo credit: Bob Palermini/City of Ashland NUMBER OF JOBS CREATED: 360 jobs PROJECT DESCRIPTION The City of Ashland’s Water Treatment Plant Project will enhance water quality and create a more reliable water system that can withstand the impacts of natural disasters. The city’s existing water treatment plant is outdated and located in a forested canyon prone to flooding, landslides, and wildfires. With this WIFIA loan, the city will build a new water treatment plant in a safer location, construct transmission pipes to the new water treatment plant, and replace aging transmission pipes. Additionally, the city will incorporate technology at the new water treatment plant to address algal toxins and harmful algal blooms. This project will ultimately increase the reliability and efficiency of the sole water treatment plant for this small community. PROJECT AND FINANCING BENEFITS • Increases system reliability by replacing an outdated water treatment plant. • Relocates the water treatment plant to a safer location to prevent damage from natural disasters. • Incorporates treatment technology to address harmful algal blooms. • Locks in funding early and provides a customized repayment schedule. These flexibilities will minimize impacts on ratepayers and save the City of Ashland $11 million over the life of the loan. WEBSITE: www.epa.gov/wifia EMAIL: [email protected]”
    Facts from this document
    Funding scope and wIFIA program project cost
    Retrieved
    Oct 4, 2026
  11. Ashland Water Treatment Plant City of Ashland · retrieved Sep 29, 2026

    Inspect exact excerpt View official source

    List item on the official webpage

    Excerpt · List item on the official webpage
    “An invitation to bid for construction was released on September 20, 2026. The bid open is scheduled for November 5, 2026, at 1 p.m. All documents are available on OregonBuys. Construction is anticipated to start early winter 2026.”
    Facts from this document
    Active procurement
    Also supports
    Water treatment plant construction invitation to bid released
    Retrieved
    Sep 29, 2026
    Published
    Not stated
  12. 2026 (Q32026) Base DWSRF & IIJA General Supplemental PPL Oregon Health Authority · retrieved Sep 29, 2026

    Inspect exact excerpt View official source

    Row 60

    Workbook row context

    Source row: 2026 COMBINED (H&C&C) PPL!A60:S60 · Header: 2026 COMBINED (H&C&C) PPL!A8:S8

    The cited cell is highlighted.

    Rank (A60; cited)
    30
    Applicant LOI (SD#) - (1) County RDO / RPM - (2) Population (B60; cited)
    City of Ashland SD-24-420 Jackson Marta Tarantsey / Tawni Bean 20,700
    Column C (C60; cited)
    Blank cell
    Project Descriptions (PD) (D60; cited)
    Issue: The existing water treatment plant was built in 1948 and has reached the end of its useful life and is located near Ashland Creek so it is prone to flooding and other natural disaster problems. Project: The system is replacing the water treatment plant with a new 7.0 MGD direct filtration plant (with the ability to expand to 9.0 MGD for future demands). The WTP improvements include adding ozone, replacing the sand filter, chlorine feed, and flocculation basin. They will also add solar panels to offset the energy costs. The engineering design is done so this project is only for construction and construction management.
    Column E (E60; cited)
    Blank cell
    Column F (F60; cited)
    Blank cell
    Column G (G60; cited)
    Blank cell
    Column H (H60; cited)
    Blank cell
    Primary Project Focus (e.g., Treat, Dist., Storage) (4) (I60; cited)
    Treatment
    Amount Req. (J60; cited)
    6000000
    POTENTIAL Base DWSRF Subsidy Amount (4) (K60; cited)
    1500000
    IIJA Supplemental Fundable Amount (L60; cited)
    6000000
    POTENTIAL IIJA Supp Subsidy Amount (4) (M60; cited)
    1500000
    ANTICIPATED IIJA Supp Rates & Terms (6) (N60; cited)
    To be confirmed at the time of invitation to apply and subject to subsidy availability. Disadvantaged communities may qualify for up to $1,500,000 in forgivable loan funding, or 50% of total project costs (whichever is lower), and interest rates as low as 1%.
    Disadvantaged Community (7) (O60; cited)
    Yes
    Grant Award(s) (5) (P60; cited)
    2024 (LOI expires on 8/27/27)
    Quarter & SFY Added to PPL (Q60; cited)
    3Q2024
    Project Rating (≤120) (8) (R60; cited)
    18
    Project Rating Description (9) (S60; cited)
    Rating results include: 5 pts (Health Risk) For installing ozone for prevention of future potential HAB contamination. 0 pts (Compliance) 0 pts (Consolidation) 13 pts (Affordability) 0 pts (Water System Size)
    Excerpt · Row 60
    “30 | City of Ashland SD-24-420 Jackson Marta Tarantsey / Tawni Bean 20,700 | | Issue: The existing water treatment plant was built in 1948 and has reached the end of its useful life and is located near Ashland Creek so it is prone to flooding and other natural disaster problems. Project: The system is replacing the water treatment plant with a new 7.0 MGD direct filtration plant (with the ability to expand to 9.0 MGD for future demands). The WTP improvements include adding ozone, replacing the sand filter, chlorine feed, and flocculation basin. They will also add solar panels to offset the energy costs. The engineering design is done so this project is only for construction and construction management. | | | | | Treatment | 6000000 | 1500000 | 6000000 | 1500000 | To be confirmed at the time of invitation to apply and subject to subsidy availability. Disadvantaged communities may qualify for up to $1,500,000 in forgivable loan funding, or 50% of total project costs (whichever is lower), and interest rates as low as 1%. | Yes | 2024 (LOI expires on 8/27/27) | 3Q2024 | 18 | Rating results include: 5 pts (Health Risk) For installing ozone for prevention of future potential HAB contamination. 0 pts (Compliance) 0 pts (Consolidation) 13 pts (Affordability) 0 pts (Water System Size)”
    Facts from this document
    Funding letter of interest, project description, priority rank, amount requested, project focus, and date added to funding list
    Also supports
    Listed on Oregon's drinking water SRF priority list
    Retrieved
    Sep 29, 2026
  13. 2026 Q3 Combined Base DWSRF and IIJA General Supplemental PPL Oregon Health Authority · retrieved Sep 25, 2026

    Inspect exact excerpt View official source

    Row 60

    Workbook row context

    Source row: 2026 COMBINED (H&C&C) PPL!A60:S60 · Header: 2026 COMBINED (H&C&C) PPL!A8:S8

    The cited cell is highlighted.

    Rank (A60)
    30
    Applicant LOI (SD#) - (1) County RDO / RPM - (2) Population (B60; cited)
    City of Ashland SD-24-420 Jackson Marta Tarantsey / Tawni Bean 20,700
    Project Descriptions (PD) (D60)
    Issue: The existing water treatment plant was built in 1948 and has reached the end of its useful life and is located near Ashland Creek so it is prone to flooding and other natural disaster problems. Project: The system is replacing the water treatment plant with a new 7.0 MGD direct filtration plant (with the ability to expand to 9.0 MGD for future demands). The WTP improvements include adding ozone, replacing the sand filter, chlorine feed, and flocculation basin. They will also add solar panels to offset the energy costs. The engineering design is done so this project is only for construction and construction management.
    Primary Project Focus (e.g., Treat, Dist., Storage) (4) (I60)
    Treatment
    Amount Req. (J60)
    6000000
    POTENTIAL Base DWSRF Subsidy Amount (4) (K60)
    1500000
    IIJA Supplemental Fundable Amount (L60)
    6000000
    POTENTIAL IIJA Supp Subsidy Amount (4) (M60)
    1500000
    ANTICIPATED IIJA Supp Rates & Terms (6) (N60)
    To be confirmed at the time of invitation to apply and subject to subsidy availability. Disadvantaged communities may qualify for up to $1,500,000 in forgivable loan funding, or 50% of total project costs (whichever is lower), and interest rates as low as 1%.
    Disadvantaged Community (7) (O60)
    Yes
    Grant Award(s) (5) (P60)
    2024 (LOI expires on 8/27/27)
    Quarter & SFY Added to PPL (Q60)
    3Q2024
    Project Rating (≤120) (8) (R60)
    18
    Project Rating Description (9) (S60)
    Rating results include: 5 pts (Health Risk) For installing ozone for prevention of future potential HAB contamination. 0 pts (Compliance) 0 pts (Consolidation) 13 pts (Affordability) 0 pts (Water System Size)
    Excerpt · Row 60
    “SD-24-420”
    Excerpt · Row 60
    “30”
    Excerpt · Row 60
    “Issue: The existing water treatment plant was built in 1948 and has reached the end of its useful life and is located near Ashland Creek so it is prone to flooding and other natural disaster problems. Project: The system is replacing the water treatment plant with a new 7.0 MGD direct filtration plant (with the ability to expand to 9.0 MGD for future demands). The WTP improvements include adding ozone, replacing the sand filter, chlorine feed, and flocculation basin. They will also add solar panels to offset the energy costs. The engineering design is done so this project is only for construction and construction management.”
    Excerpt · Row 60
    “Treatment”
    Excerpt · Row 60
    “6000000”
    Excerpt · Row 60
    “Yes”
    Excerpt · Row 60
    “3Q2024”
    Excerpt · Row 60
    “18”
    Excerpt · Row 60
    “30 | City of Ashland SD-24-420 Jackson Marta Tarantsey / Tawni Bean 20,700 | | Issue: The existing water treatment plant was built in 1948 and has reached the end of its useful life and is located near Ashland Creek so it is prone to flooding and other natural disaster problems. Project: The system is replacing the water treatment plant with a new 7.0 MGD direct filtration plant (with the ability to expand to 9.0 MGD for future demands). The WTP improvements include adding ozone, replacing the sand filter, chlorine feed, and flocculation basin. They will also add solar panels to offset the energy costs. The engineering design is done so this project is only for construction and construction management. | | | | | Treatment | 6000000 | 1500000 | 6000000 | 1500000 | To be confirmed at the time of invitation to apply and subject to subsidy availability. Disadvantaged communities may qualify for up to $1,500,000 in forgivable loan funding, or 50% of total project costs (whichever is lower), and interest rates as low as 1%. | Yes | 2024 (LOI expires on 8/27/27) | 3Q2024 | 18 | Rating results include: 5 pts (Health Risk) For installing ozone for prevention of future potential HAB contamination. 0 pts (Compliance) 0 pts (Consolidation) 13 pts (Affordability) 0 pts (Water System Size)”
    Facts from this document
    Funding letter of interest, priority rank, project description, project focus, amount requested, disadvantaged community, date added to funding list, and project rating
    Also supports
    OHA records priority-list addition for SD-24-420 in SFY 2024, quarter 3
    Retrieved
    Sep 25, 2026
  14. Ashland Water Treatment Plant City of Ashland · retrieved Jul 18, 2026

    Inspect exact excerpt View official source

    Paragraph on the official webpage

    Excerpt · Paragraph on the official webpage
    “Final engineering, permitting and bidding are anticipated to wrap up in Winter 2026, with construction beginning shortly thereafter. Once underway, construction is expected to span approximately three years as this critical infrastructure investment takes shape.”
    Excerpt · Paragraph on the official webpage
    “Final engineering, permitting and bidding are anticipated to wrap up in Winter 2026, with construction beginning shortly thereafter.”
    Excerpt · List item on the official webpage
    “Awarded the Owners Rep to West Yost. Currently we are negotiating Scope & Fee for Phase I”
    Facts from this document
    Procurement forecast and permitting activity
    Also supports
    Owner’s representative awarded to West Yost
    Retrieved
    Jul 18, 2026
    Published
    Not stated
  15. 2026 Q3 Combined Base DWSRF and IIJA General Supplemental PPL — public-comment PDF Oregon Health Authority · retrieved Jul 14, 2026

    Inspect exact excerpt View official source

    PDF page 11

    Excerpt · PDF page 11
    “rought resiliency and increase wildfire protection. City of Ashland Issue: The existing water treatment plant was built in 1948 and has Rating results include: SD-24-420 reached the end of its useful life and is located near Ashland Creek 5 pts (Health Risk) For installing ozone Jackson so it is prone to flooding and other natural disaster problems. for prevention of future potential HAB Project: The system is replacing the water treatment plant with a new contamination. Marta Tarantsey / Tawni Bean 7.0 MGD direct filtration plant (with the ability to expand to 9.0 MGD To be confirmed at the time 0 pts (Compliance) 20,700 for future demands). The WTP improvements include adding ozone, of invitation to apply and 0 pts (Consolidation) replacing the sand filter, chlorine feed, and flocculation basin. They subject to subsidy 13 pts (Affordability) will also add solar panels to offset the energy costs. The engineering availability. Disadvantaged 2024 0 pts (Water System Size) design is done so this project is only for construction and construction communities may qualify 30 management. Treatment $6,000,000 $1,500,000 $6,000,000 $1,500,000 for up to $1,500,000 in Yes (LOI expires on 3Q2024 18 forgivable loan funding, or 8/27/27) 50% of total project costs (whichever is lower), and interest rates as low as 1%. City of Estacada Issue: The current treatment plant capacity will not be able to meet Rating results include: SD-26-02 demand in the next few years and parts of the treatment”
    Facts from this document
    Public comment funding list listing
    Also supports
    OHA revised priority list includes project
    Retrieved
    Jul 14, 2026
  16. 2026 Q3 Combined Base DWSRF and IIJA General Supplemental PPL Oregon Health Authority · retrieved Jul 14, 2026

    Inspect exact excerpt View official source

    Row 60

    Workbook row context

    Source row: 2026 COMBINED (H&C&C) PPL!A60:S60 · Header: 2026 COMBINED (H&C&C) PPL!A8:S8

    The cited cell is highlighted.

    Rank (A60)
    30
    Applicant LOI (SD#) - (1) County RDO / RPM - (2) Population (B60; cited)
    City of Ashland SD-24-420 Jackson Marta Tarantsey / Tawni Bean 20,700
    Project Descriptions (PD) (D60)
    Issue: The existing water treatment plant was built in 1948 and has reached the end of its useful life and is located near Ashland Creek so it is prone to flooding and other natural disaster problems. Project: The system is replacing the water treatment plant with a new 7.0 MGD direct filtration plant (with the ability to expand to 9.0 MGD for future demands). The WTP improvements include adding ozone, replacing the sand filter, chlorine feed, and flocculation basin. They will also add solar panels to offset the energy costs. The engineering design is done so this project is only for construction and construction management.
    Primary Project Focus (e.g., Treat, Dist., Storage) (4) (I60)
    Treatment
    Amount Req. (J60)
    6000000
    POTENTIAL Base DWSRF Subsidy Amount (4) (K60)
    1500000
    IIJA Supplemental Fundable Amount (L60)
    6000000
    POTENTIAL IIJA Supp Subsidy Amount (4) (M60)
    1500000
    ANTICIPATED IIJA Supp Rates & Terms (6) (N60)
    To be confirmed at the time of invitation to apply and subject to subsidy availability. Disadvantaged communities may qualify for up to $1,500,000 in forgivable loan funding, or 50% of total project costs (whichever is lower), and interest rates as low as 1%.
    Disadvantaged Community (7) (O60)
    Yes
    Grant Award(s) (5) (P60)
    2024 (LOI expires on 8/27/27)
    Quarter & SFY Added to PPL (Q60)
    3Q2024
    Project Rating (≤120) (8) (R60)
    18
    Project Rating Description (9) (S60)
    Rating results include: 5 pts (Health Risk) For installing ozone for prevention of future potential HAB contamination. 0 pts (Compliance) 0 pts (Consolidation) 13 pts (Affordability) 0 pts (Water System Size)
    Excerpt · Row 60
    “SD-24-420”
    Excerpt · Row 60
    “30”
    Excerpt · Row 60
    “Issue: The existing water treatment plant was built in 1948 and has reached the end of its useful life and is located near Ashland Creek so it is prone to flooding and other natural disaster problems. Project: The system is replacing the water treatment plant with a new 7.0 MGD direct filtration plant (with the ability to expand to 9.0 MGD for future demands). The WTP improvements include adding ozone, replacing the sand filter, chlorine feed, and flocculation basin. They will also add solar panels to offset the energy costs. The engineering design is done so this project is only for construction and construction management.”
    Excerpt · Row 60
    “Treatment”
    Excerpt · Row 60
    “6000000”
    Excerpt · Row 60
    “Yes”
    Excerpt · Row 60
    “3Q2024”
    Excerpt · Row 60
    “18”
    Facts from this document
    Funding letter of interest, priority rank, project description, project focus, amount requested, disadvantaged community, date added to funding list, and project rating
    Retrieved
    Jul 14, 2026