Heppner Water-System Reliability Improvements
(1) Well improvements: replacing a well pump building, backup power generator (x2), drilling a new well, adding an additional chlorination system at the new well (2) Storage tank improvements: recoat current tank and build a 500K gallon tank to support the new well (3) Distribution improvements: replacing under sized water main, rehab current PRV stations and fire hydrants
Last verified Sep 25, 2026 2 official source families
Project brief
What is proposed
(1) Well improvements: replacing a well pump building, backup power generator (x2), drilling a new well, adding an additional chlorination system at the new well (2) Storage tank improvements: recoat current tank and build a 500K gallon tank to support the new well (3) Distribution improvements: replacing under sized water main, rehab current PRV stations and fire hydrants
Latest material change
Added during OHA's 3Q2026 DWSRF priority-list cycle
OHA lists the project for DWSRF funding consideration; the workbook does not establish a formal procurement date.
Commercial scope
Confirmed work and commercial interpretation
What is proposed
(1) Well improvements: replacing a well pump building, backup power generator (x2), drilling a new well, adding an additional chlorination system at the new well (2) Storage tank improvements: recoat current tank and build a 500K gallon tank to support the new well (3) Distribution improvements: replacing under sized water main, rehab current PRV stations and fire hydrants
Potential commercial work
Waterline IQ interpretation of accepted scope. These items are not confirmed contract packages or specifications.
Pumping and storage
Water well drilling and Water storage tank
Process and controls
Electrical and controls
Selected lifecycle
Key official milestones
-
Official event
Added during OHA's 3Q2026 DWSRF priority-list cycle
OHA lists the project for DWSRF funding consideration; the workbook does not establish a formal procurement date.
View evidence for Added during OHA's 3Q2026 DWSRF priority-list cycle -
Official event
OHA publishes project in revised DWSRF public-comment list
The project appears in OHA's June 9, 2026 revised public-comment PPL, preserving a second official project-specific publication record.
View evidence for OHA publishes project in revised DWSRF public-comment list
Evidence and sources
9 accepted claims across 2 official document versions
Selected official evidence · Inspect exact excerpts and locators
2026 Q3 Combined Base DWSRF and IIJA General Supplemental PPL — public-comment PDF
OHA DWSRF infrastructure project priority list — public-comment edition“City of Heppner Issue: Based on the City's current WMP, there are several key Rating results include: SD-26-13 projects that need to be addressed. 10 pts (Health Risk) due to emergency Project: related project. Currently, the system Morrow (1) Well improvem...”
2026 Q3 Combined Base DWSRF and IIJA General Supplemental PPL
OHA DWSRF infrastructure project priority list“18 | City of Heppner SD-26-13 Morrow Ryan DeGrofft / Gail Nelson 1,187 | | Issue: Based on the City's current WMP, there are several key projects that need to be addressed. Project: (1) Well improvements: replacing a well pump building, backup power genera...”