Supporting official record
2026 Q3 Combined Base DWSRF and IIJA General Supplemental PPL — public-comment PDF
Oregon Health Authority · PDF page 7
This passage is cited in Waterline IQ’s reviewed records. Read it alongside the project history to understand the fact it supports and what remains unresolved.
The cited passage
“City of Heppner Issue: Based on the City's current WMP, there are several key Rating results include: SD-26-13 projects that need to be addressed. 10 pts (Health Risk) due to emergency Project: related project. Currently, the system Morrow (1) Well improvements: replacing a well pump building,...”Read the official document · page 7
Opens the publisher’s record in a new tab. The passage is an extract; use the original document for the surrounding context.
Saved excerpt and document details
The full captured excerpt is preserved below, including any partial sentences at its boundaries.
City of Heppner Issue: Based on the City's current WMP, there are several key Rating results include: SD-26-13 projects that need to be addressed. 10 pts (Health Risk) due to emergency Project: related project. Currently, the system Morrow (1) Well improvements: replacing a well pump building, backup power has one transmission line along Willow Ryan DeGrofft / Gail Nelson 1,187 generator (x2), drilling a new well, adding an additional chlorination To be confirmed at the time Creek, should there be a natural system at the new well of invitation to apply and emergency, the line could be (2) Storage tank improvements: recoat current tank and build a 500K Treatment subject to subsidy compromised. This is part of the gallon tank to support the new well Distribution/Trans. availability. Disadvantaged resiliency component. (3) Distribution improvements: replacing under sized water main, Storage communities may qualify 2026 10 pts (Compliance) due to documented 18 $10,000,000 $1,500,000 $10,000,000 $1,500,000 Yes (LOI expires on 3Q2026 38 rehab current PRV stations and fire hydrants Source for up to $1,500,000 in TBD) areas with pressure loss under 20 psi. Engineering forgivable loan funding, or 0 pts (Consolidation) Pump Station 50% of total project costs 15 pts (Affordability) (whichever is lower), and 3 pts (Water System Size) interest rates as low as 1%. City of Sutherlin Issue: Water rights capacity limitations at the City of Sutherlin. Rating results include: Project: Water sys
- Retrieved
- July 14, 2026 20:08
- Source location
- PDF page 7
- Document version fingerprint (SHA-256)
8010b94ca72a797080071cd90ad62855c3a3255d8a0a3b9ea1375f7e2b28cf38
This fingerprint identifies the saved document version. The publisher’s current file may have changed since retrieval.