Joplin Sewer Pump Station Improvements
The Joplin Sewer Pump Station Improvement Project will remove and replace existing electrical equipment from below ground to an above ground covered shelter and install a 120-foot monopole antenna and an emergency back-up generator for redundancy. Temporary and permanent easements are necessary to construct and maintain these new improvements.
Last verified Oct 9, 2026 2 official source families
Project brief
What is proposed
The Joplin Sewer Pump Station Improvement Project will remove and replace existing electrical equipment from below ground to an above ground covered shelter and install a 120-foot monopole antenna and an emergency back-up generator for redundancy. Temporary and permanent easements are necessary to construct and maintain these new improvements.
Latest material change
Council adopts resolution authorizing Joplin easement negotiations
The July 13 Council minutes record adoption of Resolution 2026-33 declaring public need and intent to negotiate for Joplin improvement easements. This establishes the negotiation authorization, not completed acquisition, an executed construction contract, a notice to proceed or completed improvements.
Commercial scope
Confirmed work and commercial interpretation
What is proposed
The Joplin Sewer Pump Station Improvement Project will remove and replace existing electrical equipment from below ground to an above ground covered shelter and install a 120-foot monopole antenna and an emergency back-up generator for redundancy. Temporary and permanent easements are necessary to construct and maintain these new improvements.
Potential commercial work
Waterline IQ interpretation of accepted scope. These items are not confirmed contract packages or specifications.
Pumping and storage
Emergency generators
Process and controls
Electrical and controls
Permits and approvals
Documented permitting
Permit records have not been captured; requirements and approval remain unverified.
Selected lifecycle
Key official milestones
-
Official event
Recommended capital plan identifies Joplin improvements and FY2027 expenditure
The FY2027–2031 Budget Committee recommended capital-plan attachment, whose executive summary is dated June 22, lists Joplin project 0001745 and $300,000 utility-rate expenditure in FY2027. The date is the document's stated date, not a verified upload or first-publication date. This planning document does not establish an appropriation, executed financing or an approved final capital-plan edition.
View evidence for Recommended capital plan identifies Joplin improvements and FY2027 expenditure -
Official event
Council adopts resolution authorizing Joplin easement negotiations
The July 13 Council minutes record adoption of Resolution 2026-33 declaring public need and intent to negotiate for Joplin improvement easements. This establishes the negotiation authorization, not completed acquisition, an executed construction contract, a notice to proceed or completed improvements.
View evidence for Council adopts resolution authorizing Joplin easement negotiations
Evidence and sources
5 accepted claims across 3 official document versions
Selected official evidence · Inspect exact excerpts and locators
City Council 2026-07-13 PostMinutes
Salem Council and work-session published agendas and minutes“Adopted Resolution 2026-33 declaring a public need to acquire and the City’s intent to negotiate for the acquisition of easements for the Joplin Sewer Pump Station Improvement Project.”
Salem selected capital-plan publication evidence
Salem selected capital-plan publication evidence“Project Number: 0001745 Category: Wastewater Ward: 7 Neighborhood: Sunnyslope Neighborhood Association Title: Joplin Sewer Pump Station Improvements Funding Source FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Total Utility Rates 300,000 - - - - 300,000 Current C...”