Cooper Mountain Pump Station Replacement and Reservoir 3
At 18755 SW Kemmer Road: replacement pump station, backup emergency generator, new 2-million-gallon concrete reservoir, connecting underground waterlines, stormwater detention, fencing and landscape. At 18888 SW Kemmer Road: remove the old pump station after new facilities are operational.
Last verified Oct 9, 2026 2 official source families
Project brief
What is proposed
At 18755 SW Kemmer Road: replacement pump station, backup emergency generator, new 2-million-gallon concrete reservoir, connecting underground waterlines, stormwater detention, fencing and landscape. At 18888 SW Kemmer Road: remove the old pump station after new facilities are operational.
Latest material change
August staff memo identifies aging Cooper Mountain pump station and replacement project
The dated TVWD staff memo identifies the same replacement pump station and Reservoir 3 project, explaining resilience and end-of-life needs. Its late-2028 completion expectation is retained as historical planning context. This memo is distinct from the already operating Kemmer intertie and its separate agreement.
Commercial scope
Confirmed work and commercial interpretation
What is proposed
At 18755 SW Kemmer Road: replacement pump station, backup emergency generator, new 2-million-gallon concrete reservoir, connecting underground waterlines, stormwater detention, fencing and landscape. At 18888 SW Kemmer Road: remove the old pump station after new facilities are operational.
Potential commercial work
Waterline IQ interpretation of accepted scope. These items are not confirmed contract packages or specifications.
Distribution
Water main replacement and Valves and appurtenances
Pumping and storage
Booster pump station, Water storage tank, and Emergency generators
Process and controls
Electrical and controls
Civil and site work
Concrete and structural and Security fencing and access
Permits and approvals
Documented permitting
Permit records have not been captured; requirements and approval remain unverified.
Selected lifecycle
Key official milestones
-
Official event
August staff memo identifies aging Cooper Mountain pump station and replacement project
The dated TVWD staff memo identifies the same replacement pump station and Reservoir 3 project, explaining resilience and end-of-life needs. Its late-2028 completion expectation is retained as historical planning context. This memo is distinct from the already operating Kemmer intertie and its separate agreement.
View evidence for August staff memo identifies aging Cooper Mountain pump station and replacement project -
Official forecast
Summer 2027 bidding forecast
Official project-linked outreach lists Bidding: Summer 2027, subject to change. Calendar-year precision avoids inventing a particular day or month; the exact published season remains in the title and evidence. The notice publication date is unknown. No formal notice, response deadline or current invitation has been verified.
View evidence for Summer 2027 bidding forecast
Evidence and sources
4 accepted claims across 2 official document versions
Selected official evidence · Inspect exact excerpts and locators
TVWD selected capital-project publication evidence
TVWD selected capital-project publication evidence“What is the Cooper Mountain Pump Station and Reservoir 3 Project? TVWD is planning improvements to increase the reliability and resilience of the Cooper Mountain water system. The project includes work at two existing TVWD properties: 18755 SW Kemmer Road C...”
TVWD manually acquired board publication evidence
TVWD manually acquired board publication evidence“TVWD’s 920 zone is served via direct pumping to service through the Cooper Mountain Pump Station, a single pump station that is nearing the end of its useful life. This pump station is scheduled to be replaced as part of the Cooper Mountain Pump Station Rep...”
TVWD selected capital-project publication evidence
TVWD selected capital-project publication evidence“Bidding: Summer 2027”