Supporting official record
2026 Q3 Combined Base DWSRF and IIJA General Supplemental PPL
Oregon Health Authority · 2026 COMBINED (H&C&C) PPL!A60:S60
This passage is cited in Waterline IQ’s reviewed records. Read it alongside the project history to understand the fact it supports and what remains unresolved.
The cited passage
“30 | City of Ashland SD-24-420 Jackson Marta Tarantsey / Tawni Bean 20,700 | | Issue: The existing water treatment plant was built in 1948 and has reached the end of its useful life and is located near Ashland Creek so it is prone to flooding and other natural disaster problems. Project: The...”Read the official document
Opens the publisher’s record in a new tab. The passage is an extract; use the original document for the surrounding context.
Saved excerpt and document details
The full captured excerpt is preserved below, including any partial sentences at its boundaries.
30 | City of Ashland SD-24-420 Jackson Marta Tarantsey / Tawni Bean 20,700 | | Issue: The existing water treatment plant was built in 1948 and has reached the end of its useful life and is located near Ashland Creek so it is prone to flooding and other natural disaster problems. Project: The system is replacing the water treatment plant with a new 7.0 MGD direct filtration plant (with the ability to expand to 9.0 MGD for future demands). The WTP improvements include adding ozone, replacing the sand filter, chlorine feed, and flocculation basin. They will also add solar panels to offset the energy costs. The engineering design is done so this project is only for construction and construction management. | | | | | Treatment | 6000000 | 1500000 | 6000000 | 1500000 | To be confirmed at the time of invitation to apply and subject to subsidy availability. Disadvantaged communities may qualify for up to $1,500,000 in forgivable loan funding, or 50% of total project costs (whichever is lower), and interest rates as low as 1%. | Yes | 2024 (LOI expires on 8/27/27) | 3Q2024 | 18 | Rating results include: 5 pts (Health Risk) For installing ozone for prevention of future potential HAB contamination. 0 pts (Compliance) 0 pts (Consolidation) 13 pts (Affordability) 0 pts (Water System Size)
- Retrieved
- July 14, 2026 18:34
- Source location
- 2026 COMBINED (H&C&C) PPL!A60:S60
- Document version fingerprint (SHA-256)
b9057387bb5476a629adc37193aa704e21ab14bc0c01e2e08539ede447fca4b7
This fingerprint identifies the saved document version. The publisher’s current file may have changed since retrieval.