The system is replacing the water treatment plant with a new 7.0 MGD direct filtration plant (with the ability to expand to 9.0 MGD for future demands). The WTP improvements include adding ozone, replacing the sand filter, chlorine feed, and flocculation basin. They will also add solar panels to offset the energy costs. The engineering design is done so this project is only for construction and construction management.

Last verified Sep 25, 2026 3 official source families

What is proposed

The system is replacing the water treatment plant with a new 7.0 MGD direct filtration plant (with the ability to expand to 9.0 MGD for future demands). The WTP improvements include adding ozone, replacing the sand filter, chlorine feed, and flocculation basin. They will also add solar panels to offset the energy costs. The engineering design is done so this project is only for construction and construction management.

Owner’s representative awarded to West Yost

The City project update reports selection of West Yost as owner’s representative and negotiation of Phase I scope and fee.

Complete final engineering, permitting, and construction bidding

Oct 2026–Mar 2027 Moderate confidence

Waterline IQ forecast

Confirmed work and commercial interpretation

What is proposed

The system is replacing the water treatment plant with a new 7.0 MGD direct filtration plant (with the ability to expand to 9.0 MGD for future demands). The WTP improvements include adding ozone, replacing the sand filter, chlorine feed, and flocculation basin. They will also add solar panels to offset the energy costs. The engineering design is done so this project is only for construction and construction management.

Potential commercial work

Waterline IQ interpretation of accepted scope. These items are not confirmed contract packages or specifications.

Treatment plant

Water treatment plant and Water treatment filtration

Pumping and storage

Process pumps

Process and controls

Electrical and controls

Civil and site work

Seismic water infrastructure

Key official milestones

  1. Official event

    Added during OHA's 3Q2024 DWSRF priority-list cycle

    OHA lists the project for DWSRF funding consideration; the workbook does not establish a formal procurement date.

    View evidence for Added during OHA's 3Q2024 DWSRF priority-list cycle
  2. Official event

    OHA publishes project in revised DWSRF public-comment list

    The project appears in OHA's June 9, 2026 revised public-comment PPL, preserving a second official project-specific publication record.

    View evidence for OHA publishes project in revised DWSRF public-comment list
Evidence and sources
10 accepted claims across 3 official document versions
Selected official evidence · Inspect exact excerpts and locators

Ashland Water Treatment Plant

Ashland water-treatment-plant project updates
Inspect exact excerpt and locator
“Final engineering, permitting and bidding are anticipated to wrap up in Winter 2026, with construction beginning shortly thereafter. Once underway, construction is expected to span approximately three years as this critical infrastructure investment takes s...”

Ashland Water Treatment Plant

Ashland water-treatment-plant project updates
Inspect exact excerpt and locator
“Awarded the Owners Rep to West Yost. Currently we are negotiating Scope & Fee for Phase I”

2026 Q3 Combined Base DWSRF and IIJA General Supplemental PPL

OHA DWSRF infrastructure project priority list
Inspect exact excerpt and locator
“30 | City of Ashland SD-24-420 Jackson Marta Tarantsey / Tawni Bean 20,700 | | Issue: The existing water treatment plant was built in 1948 and has reached the end of its useful life and is located near Ashland Creek so it is prone to flooding and other nat...”

2026 Q3 Combined Base DWSRF and IIJA General Supplemental PPL — public-comment PDF

OHA DWSRF infrastructure project priority list — public-comment edition
Inspect exact excerpt and locator
“rought resiliency and increase wildfire protection. City of Ashland Issue: The existing water treatment plant was built in 1948 and has Rating results include: SD-24-420 reached the end of its useful life and is located near Ashland Creek 5 pts (Health Risk...”