Supporting official record
2026 Q3 Combined Base DWSRF and IIJA General Supplemental PPL — public-comment PDF
Oregon Health Authority · PDF page 4
This passage is cited in Waterline IQ’s reviewed records. Read it alongside the project history to understand the fact it supports and what remains unresolved.
The cited passage
“ssues will need to be maintained and improved Rating results include: to ensure compliance with drinking water rules and safety standards: 15 pts (Health Risk) SD-23-392 Coos • Reinforcement of the sedimentation basin exterior wall (considered 10 pts (Compliance) Christopher Frazier / Tawni Bean...”Read the official document · page 4
Opens the publisher’s record in a new tab. The passage is an extract; use the original document for the surrounding context.
Saved excerpt and document details
The full captured excerpt is preserved below, including any partial sentences at its boundaries.
ssues will need to be maintained and improved Rating results include: to ensure compliance with drinking water rules and safety standards: 15 pts (Health Risk) SD-23-392 Coos • Reinforcement of the sedimentation basin exterior wall (considered 10 pts (Compliance) Christopher Frazier / Tawni Bean as a major structural flaw). 0 pts (Consolidation) • Construction of a FRP baffle wall separating the flocculation 25 pts (Affordability) 3,953 chamber and settling basin. 1 pts (Water System Size) • Replacement of a 12-inch raw water line with a 14-inch line due to leakage and other high maintenance issues. • New improvements needed for the Oerding pump station: a 200 gpm To be confirmed at the time duplex booster pump, a pressure reducing vault (PRV) station and the of invitation to apply and installment of a solar powered active mixier in the Oerding Tank. subject to subsidy • The river pump station and the 14-inch raw water line are needed to availability. Disadvantaged Treatment 2023 12 ensure water availability during the summer months, when the Distribution/Trans. $1,120,510 $560,255 $801,319 $400,659 communities may qualify (LOI expires on 1Q2023 reservoir is not able to meet the water demand. Pump Stations for up to $1,500,000 in Yes 9/3/26) 51 • Treatment nearing the end of its useful life: replace chemical feed forgivable loan funding, or pumps, onsite chlorine generation system, control systems and 50% of total project costs settling basing sediment removal system. (whiche
- Retrieved
- July 14, 2026 20:08
- Source location
- PDF page 4
- Document version fingerprint (SHA-256)
8010b94ca72a797080071cd90ad62855c3a3255d8a0a3b9ea1375f7e2b28cf38
This fingerprint identifies the saved document version. The publisher’s current file may have changed since retrieval.