It is an improvement project to maintain the quality of the system, increase fire flow, reduce unaccounted water losses, extend the life of the existing tanks, and install needed telemetry for the entire system.

Last verified Sep 25, 2026 3 official source families

What is proposed

It is an improvement project to maintain the quality of the system, increase fire flow, reduce unaccounted water losses, extend the life of the existing tanks, and install needed telemetry for the entire system.

OHA publishes project in revised DWSRF public-comment list

The project appears in OHA's June 9, 2026 revised public-comment PPL, preserving a second official project-specific publication record.

Reapply for CDBG construction funding and establish the treatment-plant bid schedule

Jul 2026–Jun 2027 Moderate confidence

Waterline IQ forecast

Confirmed work and commercial interpretation

What is proposed

It is an improvement project to maintain the quality of the system, increase fire flow, reduce unaccounted water losses, extend the life of the existing tanks, and install needed telemetry for the entire system.

Potential commercial work

Waterline IQ interpretation of accepted scope. These items are not confirmed contract packages or specifications.

Treatment plant

Water treatment plant and Water treatment filtration

Pumping and storage

Process pumps

Process and controls

Process piping and valves and Electrical and controls

Key official milestones

  1. Official event

    Added during OHA's 1Q2023 DWSRF priority-list cycle

    OHA lists the project for DWSRF funding consideration; the workbook does not establish a formal procurement date.

    View evidence for Added during OHA's 1Q2023 DWSRF priority-list cycle
  2. Official event

    OHA publishes project in revised DWSRF public-comment list

    The project appears in OHA's June 9, 2026 revised public-comment PPL, preserving a second official project-specific publication record.

    View evidence for OHA publishes project in revised DWSRF public-comment list
Evidence and sources
10 accepted claims across 3 official document versions
Selected official evidence · Inspect exact excerpts and locators

Coquille Public Works update — March 27, 2026

Coquille Phase I water-system procurement updates
Inspect exact excerpt and locator
“PUBLIC WORKS DEPARTMENT UPDATE: March 27, 2026 birds. Even the smallest green spaces, like flower boxes and curb strips, can be part of a pathway. There is no cost to be part of the Pollinator Pathway. Additionally, it shows the city in a very positive envi...”

2026 Q3 Combined Base DWSRF and IIJA General Supplemental PPL

OHA DWSRF infrastructure project priority list
Inspect exact excerpt and locator
“12 | City of Coquille SD-23-392 Coos Christopher Frazier / Tawni Bean 3,953 | | Issue: The following issues will need to be maintained and improved to ensure compliance with drinking water rules and safety standards: • Reinforcement of the sedimentation ba...”

2026 Q3 Combined Base DWSRF and IIJA General Supplemental PPL — public-comment PDF

OHA DWSRF infrastructure project priority list — public-comment edition
Inspect exact excerpt and locator
“ssues will need to be maintained and improved Rating results include: to ensure compliance with drinking water rules and safety standards: 15 pts (Health Risk) SD-23-392 Coos • Reinforcement of the sedimentation basin exterior wall (considered 10 pts (Compl...”