Skip to main content
Waterline IQ — Water Infrastructure

Supporting official record

Portland to Sandy Water Filtration Transmission System invitation to bid

City of Sandy · body#background:nth-of-type(1) > div:nth-of-type(3) > div:nth-of-type(3) > div:nth-of-type(1) > div:nth-of-type(1) > div:nth-of-type(1) > div:nth-of-type(1) > div:nth-of-type(1) > div:nth-of-type(2) > div#block-system-main:nth-of-type(1) > div:nth-of-type(2) > div#node-23322:nth-of-type(1) > div:nth-of-type(1) > div:nth-of-type(2) > div:nth-of-type(1) > div:nth-of-type(1) > p:nth-of-type(6)

This passage is cited in Waterline IQ’s reviewed records. Read it alongside the project history to understand the fact it supports and what remains unresolved.

The cited passage

“The Project includes furnishing all labor, materials, and equipment necessary for the installation of approximately 5,500 lineal feet of 16-inch diameter ductile iron water transmission main along SE Bluff Road, between the intersections of SE Proctor Road and SE Hudson Road, in a combined trench...”
Read the official document

Opens the publisher’s record in a new tab. The passage is an extract; use the original document for the surrounding context.

Saved excerpt and document details

The full captured excerpt is preserved below, including any partial sentences at its boundaries.

The Project includes furnishing all labor, materials, and equipment necessary for the installation of approximately 5,500 lineal feet of 16-inch diameter ductile iron water transmission main along SE Bluff Road, between the intersections of SE Proctor Road and SE Hudson Road, in a combined trench with a 3- inch diameter, PVC fiber conduit, the required pipe and conduit appurtenances. Owner’s Engineer estimates the cost of this Project to be in the range of $3.8 million to $4.2 million.
Retrieved
July 18, 2026 18:55
Source location
body#background:nth-of-type(1) > div:nth-of-type(3) > div:nth-of-type(3) > div:nth-of-type(1) > div:nth-of-type(1) > div:nth-of-type(1) > div:nth-of-type(1) > div:nth-of-type(1) > div:nth-of-type(2) > div#block-system-main:nth-of-type(1) > div:nth-of-type(2) > div#node-23322:nth-of-type(1) > div:nth-of-type(1) > div:nth-of-type(2) > div:nth-of-type(1) > div:nth-of-type(1) > p:nth-of-type(6)
Document version fingerprint (SHA-256)
6f6f366d1be38d5c50db29fb6e9ff3d4ba82b650ee90e663520daeff3ffddea0

This fingerprint identifies the saved document version. The publisher’s current file may have changed since retrieval.