Skip to main content
Waterline IQ — Water Infrastructure

Supporting official record

Coquille Public Works update — March 27, 2026

City of Coquille · PDF page 22

This passage is cited in Waterline IQ’s reviewed records. Read it alongside the project history to understand the fact it supports and what remains unresolved.

The cited passage

“PUBLIC WORKS DEPARTMENT UPDATE: March 27, 2026 birds. Even the smallest green spaces, like flower boxes and curb strips, can be part of a pathway. There is no cost to be part of the Pollinator Pathway. Additionally, it shows the city in a very positive environmentally conscious light. WATER The...”
Read the official document · page 22

Opens the publisher’s record in a new tab. The passage is an extract; use the original document for the surrounding context.

Saved excerpt and document details

The full captured excerpt is preserved below, including any partial sentences at its boundaries.

PUBLIC WORKS DEPARTMENT UPDATE: March 27, 2026 birds. Even the smallest green spaces, like flower boxes and curb strips, can be part of a pathway. There is no cost to be part of the Pollinator Pathway. Additionally, it shows the city in a very positive environmentally conscious light. WATER The city has requested Categorical Exclusion from further environmental review for our upcoming work on the Rink Creek Reservoir and the Knowlton Heights and Oerding finished water tanks. This is the portion of the Phase I Water System Improvements that has been funded through a loan/forgivable-loan package from the Safe Drinking Water Revolving Loan Fund. Engineers at the Dyer are preparing the final plans and documents for plan review by the Oregon Health Authority. We expect to begin advertising these projects for bid this spring. The city was not awarded assistance through the Community Development Block Grant Program for the other portion of the Phase I Water System Improvements (replacement of the river pump force main and numerous repairs and upgrades at the water treatment plant). Engineering for these projects, fully funded through CDBG, has been completed and approved by OHA. We will apply for CDBG funding again for the bidding and construction phases of these projects at the next available opportunity. Our lighting upgrade contracts with the Energy Trust of Oregon have been finalized, and we look forward to getting all the lighting upgraded at the water and sewer plants and the Public Works shop sometime in April, free of charge! SEWER During the Council Goal Setting Session on March 16 , I was asked about the costs for the addition of a second sludge press at the wastewater treatment plant. The figure I provided was representative of the cost of a second press similar to our existing one, however the engineer’s recommended project calls for a larger press and carries numerous costs in addition to the press itself, and I wanted to provide better information regarding the anticipated financial needs of the wastewater system. The engineer’s estimate for the proposed improvements to the Biosolids Dewatering System (an additional, larger sludge press) is approximately $1.14 million. Collection system improvements to reduce infiltration and inflow into the wastewater system were also discussed at the Goals Setting session. While we have remained in compliance with our NPDES permit since October, thanks largely to an unusually dry winter, we typically ha
Retrieved
July 18, 2026 18:55
Source location
PDF page 22
Document version fingerprint (SHA-256)
9963581dbed611d64c3d89273ae4a9c2a6af871fea98dc28fd0f9b248179e4d1

This fingerprint identifies the saved document version. The publisher’s current file may have changed since retrieval.