Awbrey Glen and Westside Pump Station construction award issue summary — December 18, 2024
The purpose of the Project is to improve the condition, reliability, and safety of the Awbrey Glen and Westside Pump Stations. This project will address mechanical, electrical, system controls, security, access, and performance deficiencies. The Project includes installation of new pumps, generators, a dedicated backup system, automatic transfer switch, driveway access improvements, fencing, and mechanical, electrical, and control equipment. This project was identified in the 2014 Collection System Master Plan (CSMP).
Exact wording from the City's document.
Awbrey Glen and Westside Pump Station construction award issue summary — December 18, 2024
City of Bend · PDF page 2
Retrieved Jul 14, 2026
Verification detailsPreserved copy, document fingerprint
- Retrieved
- Jul 14, 2026
- Publisher
- City of Bend
- Source location
- PDF page 2
- Preserved copy
- Version 1 kept by Waterline IQ
- Document fingerprint (SHA-256)
83ca0e6f801980891e312ef82c68fc822326d1600d15ba69899264d89fe4a6ad
to “ensure water, wastewater, and stormwater systems are aligned with the needs of a growing city.” The purpose of the Project is to improve the condition, reliability, and safety of the Awbrey Glen and Westside Pump Stations. This project will address mechanical, electrical, system controls, security, access, and performance deficiencies. The Project includes installation of new pumps, generators, a dedicated backup system, automatic transfer switch, driveway access improvements, fencing, and mechanical, electrical, and control equipment. This project was identified in the 2014 Collection System Master Plan (CSMP). It is identified in the CSMP as a Lift Station Upgrade Improvement Project (CSMP