Awbrey Glen and Westside Pump Station construction award issue summary — December 18, 2024
City of Bend · PDF page 2
This passage is cited in Waterline IQ’s reviewed records. Read it alongside the project history to understand the fact it supports and what remains unresolved.
The cited passage
“ified as Project ID 31 and 131 in the CSMP Capital Improvement Project List (CSMP pages 157 & 173). The Awbrey Glen Pump Station is located on the Awbrey Glen Golf Course property at 2540 NW Champion Circle within an existing easement and Putnam Road right of way. The pump station processes...”Read the official document · page 2
Opens the publisher’s record in a new tab. The passage is an extract; use the original document for the surrounding context.
Saved excerpt and document details
The full captured excerpt is preserved below, including any partial sentences at its boundaries.
ified as Project ID 31 and 131 in the CSMP Capital Improvement Project List (CSMP pages 157 & 173). The Awbrey Glen Pump Station is located on the Awbrey Glen Golf Course property at 2540 NW Champion Circle within an existing easement and Putnam Road right of way. The pump station processes approximately 120,000 gallons of sewage per day. The pump station was constructed in 1992, and improvements are needed to increase worker safety, comply with current code, and improve the efficiency of the pump station. The Westside Pump Station is located at 35 NW Portland Avenue and is one of the largest pump stations in Bend. It is immediately adjacent to the Deschutes River and conveys approximately 850,000 gallons of sewage per day. The pump station was originally constructed in 1980, with significant improvements completed in 2005. Additional improvements are needed to increase safety, reliability, and redundancy to improve worker safety and to prevent potential sanitary sewer overflows into the river. To improve resiliency and maintenance access of the existing 16” force main, the City is adding control valving, a pig port (used for force main cleaning), and the components to more easily bypass the force main in the case of emergency. The Contractor was selected through a competitive low-bid process. The bid documents were advertised on the City’s Bonfire platform on October 24, 2024. Three
- Retrieved
- July 14, 2026 15:53
- Source location
- PDF page 2
- Document version fingerprint (SHA-256)
83ca0e6f801980891e312ef82c68fc822326d1600d15ba69899264d89fe4a6ad
This fingerprint identifies the saved document version. The publisher’s current file may have changed since retrieval.