Awbrey Glen and Westside Pump Station construction award issue summary — December 18, 2024
The Contractor was selected through a competitive low-bid process. The bid documents were advertised on the City’s Bonfire platform on October 24, 2024. Three bids were received on November 26, 2024. The Engineer of Record’s (EOR) total project estimate based on the final design was $5,010,000. Emery & Sons Construction’s bid amount ($5,742,480) is 15% higher than the EOR’s estimate, but was the lowest bid received from a responsible and responsive bidder. While the contract price is slightly higher than the Engineer’s cost estimate, City staff recommends approval of this contract. Contract costs are consistent with the technical nature of the work and current limitations on material acquisition. The Notice to Proceed (NTP) is anticipated to be issued in January 2025 with construction beginning within 4 weeks of NTP.
Exact wording from the City's document.
Awbrey Glen and Westside Pump Station construction award issue summary — December 18, 2024
City of Bend · PDF page 2
Retrieved Jul 14, 2026
Verification detailsPreserved copy, document fingerprint
- Retrieved
- Jul 14, 2026
- Publisher
- City of Bend
- Source location
- PDF page 2
- Preserved copy
- Version 1 kept by Waterline IQ
- Document fingerprint (SHA-256)
83ca0e6f801980891e312ef82c68fc822326d1600d15ba69899264d89fe4a6ad
e main cleaning), and the components to more easily bypass the force main in the case of emergency. The Contractor was selected through a competitive low-bid process. The bid documents were advertised on the City’s Bonfire platform on October 24, 2024. Three bids were received on November 26, 2024. The Engineer of Record’s (EOR) total project estimate based on the final design was $5,010,000. Emery & Sons Construction’s bid amount ($5,742,480) is 15% higher than the EOR’s estimate, but was the lowest bid received from a responsible and responsive bidder. While the contract price is slightly higher than the Engineer’s cost estimate, City staff recommends approval of this contract. Contract costs are consistent with the technical nature of the work and current limitations on material acquisition. The Notice to Proceed (NTP) is anticipated to be issued in January 2025 with construction beginning within 4 weeks of NTP. Initial improvements to the Westsid