Reviewed intelligence covers 1 project across funding pipeline. Current commercial scope concentrates on civil and site work, process and controls, and pumping and storage.

Last verified Sep 25, 2026 1 published project history

Last verified
Sep 25, 2026
Reviewed portfolio
1 project
Source families
3 official families
Historical depth
2024

What changed

Highest-value recent account changes

1 published material signal

Reviewed project portfolio

What the owner is planning and building

Published coverage, not a complete capital program

Funding pipeline

1
Project

Ashland Water Treatment Plant Resilience Project

Ashland, Oregon · SD-24-420

Current position Funding pipeline Requested / Priority-listed · Procurement forecast
Latest change Owner’s representative awarded to West Yost June 2026
Confirmed scope Treatment plant, Pumping and storage, Process and controls, and Civil and site work
Next external milestone Complete final engineering, permitting, and construction bidding Oct 2026–Mar 2027 · Moderate confidence
Evidence / exception 3 official source families Last verified Sep 25, 2026

Upcoming external milestones

Next reviewed decision points

Chronological, bounded forecasts
Consultant procurement

Complete final engineering, permitting, and construction bidding

Ashland Water Treatment Plant Resilience Project

Timing
Oct 2026–Mar 2027
Confidence
Moderate confidence
Could change timing
Requested / Priority-listed funding is documented; no award or executed financing is established.
The official project page anticipates final engineering, permitting, and bidding in winter 2026, with construction beginning shortly afterward.

Funding profile

Funding progression by project

Procurement and delivery

Reviewed buying position

Organizations and relationships

Documented project-specific roles

Not account-wide incumbency

No consultant, contractor, funding-agency, or partner relationship has been accepted for this portfolio.

Facilities and systems

Commercially relevant public assets

Public information only

No reviewed facility record is available. Waterline IQ does not infer facilities from project names.

Consequential unknowns and conflicts

What current coverage does not establish

Ranked qualification limits
  1. Coverage boundary

    Portfolio completeness is not established

    Current coverage includes published Waterline IQ project histories; it is not a complete capital-program inventory.

  2. Funding position

    Ashland Water Treatment Plant Resilience Project: no award or executed financing is established

    No award confirmed

    Open project
  3. Coverage limitation

    Ashland Water Treatment Plant Resilience Project

    Owner’s representative selection is confirmed; the main construction solicitation is forecast and is not yet confirmed active.

    Open project

Chronological owner activity

Complete reviewed account history

Official event date · newest first
  1. Professional services · Project-level

    Owner’s representative awarded to West Yost

    The City project update reports selection of West Yost as owner’s representative and negotiation of Phase I scope and fee.

    Ashland Water Treatment Plant Resilience Project · Official evidence
  2. Baseline history · Project-level

    Added during OHA's 3Q2024 DWSRF priority-list cycle

    OHA lists the project for DWSRF funding consideration; the workbook does not establish a formal procurement date.

    Ashland Water Treatment Plant Resilience Project · Official evidence

Source coverage and freshness

What Waterline IQ has reviewed

Historical depth2024
Official document versions3
Last successful reviewSep 25, 2026
Accepted claims11

Ashland water-treatment-plant project updates

City of Ashland

HealthyLast success Sep 25, 2026

OHA DWSRF infrastructure project priority list

Oregon Health Authority

HealthyLast success Sep 25, 2026

OHA DWSRF infrastructure project priority list — public-comment edition

Oregon Health Authority

HealthyLast success Sep 25, 2026

Evidence and official sources

Accepted owner and portfolio facts

11 accepted claims
Evidence and material facts — 11 verified claims
Owner fact · City of Ashland

Organization governance type

city_municipality

“City of Ashland”
Portfolio-derived · Ashland Water Treatment Plant Resilience Project

Procurement forecast

Final engineering, permitting, and bidding anticipated to conclude in winter 2026

“Final engineering, permitting and bidding are anticipated to wrap up in Winter 2026, with construction beginning shortly thereafter. Once underway, construction is expected to span approximately three years as this critical infrastructure investment takes shape.”
body:nth-of-type(1) > div#outer-wrap:nth-of-type(5) > div#inner-wrap:nth-of-type(1) > div#bodyWrapper:nth-of-type(2) > div#bodyContainerTS:nth-of-type(2) > div#mainContainerTS:nth-of-type(2) > div:nth-of-type(1) > div#mainWrapTS:nth-of-type(1) > div#outerContentWrapTS:nth-of-type(1) > div#contentWrapTS:nth-of-type(1) > div#moduleContent:nth-of-type(2) > div#page:nth-of-type(1) > div#cc5f8c90dc-b4cb-431b-90ee-10648f8df655:nth-of-type(1) > div:nth-of-type(1) > div:nth-of-type(1) > div:nth-of-type(1) > div:nth-of-type(1) > div#divEditore3eafa10-8104-4124-b72b-455f208d0fa2:nth-of-type(1) > div:nth-of-type(1) > p:nth-of-type(2)Published UnknownOpen exact evidenceOfficial source
Portfolio-derived · Ashland Water Treatment Plant Resilience Project

Oha dwsrf loi

SD-24-420

“SD-24-420”
Portfolio-derived · Ashland Water Treatment Plant Resilience Project

Priority rank

30

“30”
Portfolio-derived · Ashland Water Treatment Plant Resilience Project

Project description

Issue: The existing water treatment plant was built in 1948 and has reached the end of its useful life and is located near Ashland Creek so it is prone to flooding and other natural disaster problems. Project: The system is replacing the water treatment plant with a new 7.0 MGD direct filtration plant (with the ability to expand to 9.0 MGD for future demands). The WTP improvements include adding ozone, replacing the sand filter, chlorine feed, and flocculation basin. They will also add solar panels to offset the energy costs. The engineering design is done so this project is only for construction and construction management.

“Issue: The existing water treatment plant was built in 1948 and has reached the end of its useful life and is located near Ashland Creek so it is prone to flooding and other natural disaster problems. Project: The system is replacing the water treatment plant with a new 7.0 MGD direct filtration plant (with the ability to expand to 9.0 MGD for future demands). The WTP improvements include adding ozone, replacing the sand filter, chlorine feed, and flocculation basin. They will also add solar panels to offset the energy costs. The engineering design is done so this project is only for construction and construction management.”
Portfolio-derived · Ashland Water Treatment Plant Resilience Project

Project focus

Treatment

“Treatment”
Portfolio-derived · Ashland Water Treatment Plant Resilience Project

Amount requested

$6,000,000 USD

“6000000”
Portfolio-derived · Ashland Water Treatment Plant Resilience Project

Disadvantaged community

Yes

“Yes”
Portfolio-derived · Ashland Water Treatment Plant Resilience Project

Ppl quarter added

3Q2024

“3Q2024”
Portfolio-derived · Ashland Water Treatment Plant Resilience Project

Project rating

18

“18”
Portfolio-derived · Ashland Water Treatment Plant Resilience Project

Public comment ppl listing

loi_id: SD-24-420, revised_on: 2026-06-09

“rought resiliency and increase wildfire protection. City of Ashland Issue: The existing water treatment plant was built in 1948 and has Rating results include: SD-24-420 reached the end of its useful life and is located near Ashland Creek 5 pts (Health Risk) For installing ozone Jackson so it is prone to flooding and other natural disaster problems. for prevention of future potential HAB Project: The system is replacing the water treatment plant with a new contamination. Marta Tarantsey / Tawni Bean 7.0 MGD direct filtration plant (with the ability to expand to 9.0 MGD To be confirmed at the time 0 pts (Compliance) 20,700 for future demands). The WTP improvements include adding ozone, of invitation to apply and 0 pts (Consolidation) replacing the sand filter, chlorine feed, and flocculation basin. They subject to subsidy 13 pts (Affordability) will also add solar panels to offset the energy costs. The engineering availability. Disadvantaged 2024 0 pts (Water System Size) design is done so this project is only for construction and construction communities may qualify 30 management. Treatment $6,000,000 $1,500,000 $6,000,000 $1,500,000 for up to $1,500,000 in Yes (LOI expires on 3Q2024 18 forgivable loan funding, or 8/27/27) 50% of total project costs (whichever is lower), and interest rates as low as 1%. City of Estacada Issue: The current treatment plant capacity will not be able to meet Rating results include: SD-26-02 demand in the next few years and parts of the treatment”