City of Coquille
Reviewed intelligence covers 1 project across funding pipeline. Current commercial scope concentrates on process and controls, pumping and storage, and treatment plant.
Last verified Sep 25, 2026 1 published project history
- Last verified
- Sep 25, 2026
- Reviewed portfolio
- 1 project
- Source families
- 3 official families
- Historical depth
- 2023
Account brief
Current reviewed account position
Current Waterline IQ coverage includes 1 published project history across funding pipeline. Accepted project records cover drinking water, with reviewed work concentrated in process and controls, pumping and storage, and treatment plant. This is a portfolio-derived account view, not a complete capital-program, staffing, facility, or procurement inventory.
- Published projects
- 1
- Official source families
- 3
- Lifecycle breadth
- 1 stage
- Recent material changes
- 0
- Nearest external milestone
- Jul 2026–Jun 2027
What changed
Highest-value recent account changes
No separate reviewed material account change has been published.
Reviewed project portfolio
What the owner is planning and building
Funding pipeline
1Upcoming external milestones
Next reviewed decision points
Reapply for CDBG construction funding and establish the treatment-plant bid schedule
Coquille Water Treatment Plant Improvements
- Timing
- Jul 2026–Jun 2027
- Confidence
- Moderate confidence
- Could change timing
- Requested / Priority-listed funding is documented; no award or executed financing is established.
Funding profile
Funding progression by project
Coquille Water Treatment Plant Improvements
Requested / Priority-listed · $1,120,510 requested
No award confirmed- Programs
- OHA Drinking Water State Revolving Fund (DWSRF)
- Remaining funding gap
- Not established
Procurement and delivery
Reviewed buying position
Coquille Water Treatment Plant Improvements
Procurement forecast
Procurement forecast
Organizations and relationships
Documented project-specific roles
No consultant, contractor, funding-agency, or partner relationship has been accepted for this portfolio.
Facilities and systems
Commercially relevant public assets
No reviewed facility record is available. Waterline IQ does not infer facilities from project names.
Consequential unknowns and conflicts
What current coverage does not establish
-
Coverage boundary
Portfolio completeness is not established
Current coverage includes published Waterline IQ project histories; it is not a complete capital-program inventory.
-
Funding position
Coquille Water Treatment Plant Improvements: no award or executed financing is established
No award confirmed
Open project -
Coverage limitation
Coquille Water Treatment Plant Improvements
The funded reservoir package is separate; no active treatment-plant construction solicitation is confirmed in the reviewed record.
Open project
Chronological owner activity
Complete reviewed account history
-
Baseline history · Project-level
Added during OHA's 1Q2023 DWSRF priority-list cycle
OHA lists the project for DWSRF funding consideration; the workbook does not establish a formal procurement date.
Coquille Water Treatment Plant Improvements · Official evidence
Source coverage and freshness
What Waterline IQ has reviewed
Coquille Phase I water-system procurement updates
City of Coquille
OHA DWSRF infrastructure project priority list
Oregon Health Authority
OHA DWSRF infrastructure project priority list — public-comment edition
Oregon Health Authority
Evidence and official sources
Accepted owner and portfolio facts
Evidence and material facts — 11 verified claims
Organization governance type
city_municipality
“City of Coquille”
Construction procurement dependency
Treatment-plant construction procurement awaits a renewed CDBG funding application
“PUBLIC WORKS DEPARTMENT UPDATE: March 27, 2026 birds. Even the smallest green spaces, like flower boxes and curb strips, can be part of a pathway. There is no cost to be part of the Pollinator Pathway. Additionally, it shows the city in a very positive environmentally conscious light. WATER The city has requested Categorical Exclusion from further environmental review for our upcoming work on the Rink Creek Reservoir and the Knowlton Heights and Oerding finished water tanks. This is the portion of the Phase I Water System Improvements that has been funded through a loan/forgivable-loan package from the Safe Drinking Water Revolving Loan Fund. Engineers at the Dyer are preparing the final plans and documents for plan review by the Oregon Health Authority. We expect to begin advertising these projects for bid this spring. The city was not awarded assistance through the Community Development Block Grant Program for the other portion of the Phase I Water System Improvements (replacement of the river pump force main and numerous repairs and upgrades at the water treatment plant). Engineering for these projects, fully funded through CDBG, has been completed and approved by OHA. We will apply for CDBG funding again for the bidding and construction phases of these projects at the next available opportunity. Our lighting upgrade contracts with the Energy Trust of Oregon have been finalized, and we look forward to getting all the lighting upgraded at the water and sewer plants and the Public Works shop sometime in April, free of charge! SEWER During the Council Goal Setting Session on March 16 , I was asked about the costs for the addition of a second sludge press at the wastewater treatment plant. The figure I provided was representative of the cost of a second press similar to our existing one, however the engineer’s recommended project calls for a larger press and carries numerous costs in addition to the press itself, and I wanted to provide better information regarding the anticipated financial needs of the wastewater system. The engineer’s estimate for the proposed improvements to the Biosolids Dewatering System (an additional, larger sludge press) is approximately $1.14 million. Collection system improvements to reduce infiltration and inflow into the wastewater system were also discussed at the Goals Setting session. While we have remained in compliance with our NPDES permit since October, thanks largely to an unusually dry winter, we typically ha”
Oha dwsrf loi
SD-23-392
“SD-23-392”
Priority rank
12
“12”
Project description
Issue: The following issues will need to be maintained and improved to ensure compliance with drinking water rules and safety standards: • Reinforcement of the sedimentation basin exterior wall (considered as a major structural flaw). • Construction of a FRP baffle wall separating the flocculation chamber and settling basin. • Replacement of a 12-inch raw water line with a 14-inch line due to leakage and other high maintenance issues. • New improvements needed for the Oerding pump station: a 200 gpm duplex booster pump, a pressure reducing vault (PRV) station and the installment of a solar powered active mixier in the Oerding Tank. • The river pump station and the 14-inch raw water line are needed to ensure water availability during the summer months, when the reservoir is not able to meet the water demand. • Treatment nearing the end of its useful life: replace chemical feed pumps, onsite chlorine generation system, control systems and settling basing sediment removal system. Project: It is an improvement project to maintain the quality of the system, increase fire flow, reduce unaccounted water losses, extend the life of the existing tanks, and install needed telemetry for the entire system.
“Issue: The following issues will need to be maintained and improved to ensure compliance with drinking water rules and safety standards: • Reinforcement of the sedimentation basin exterior wall (considered as a major structural flaw). • Construction of a FRP baffle wall separating the flocculation chamber and settling basin. • Replacement of a 12-inch raw water line with a 14-inch line due to leakage and other high maintenance issues. • New improvements needed for the Oerding pump station: a 200 gpm duplex booster pump, a pressure reducing vault (PRV) station and the installment of a solar powered active mixier in the Oerding Tank. • The river pump station and the 14-inch raw water line are needed to ensure water availability during the summer months, when the reservoir is not able to meet the water demand. • Treatment nearing the end of its useful life: replace chemical feed pumps, onsite chlorine generation system, control systems and settling basing sediment removal system. Project: It is an improvement project to maintain the quality of the system, increase fire flow, reduce unaccounted water losses, extend the life of the existing tanks, and install needed telemetry for the entire system.”
Project focus
Treatment Distribution/Trans. Pump Stations
“Treatment Distribution/Trans. Pump Stations”
Public comment ppl listing
loi_id: SD-23-392, revised_on: 2026-06-09
“ssues will need to be maintained and improved Rating results include: to ensure compliance with drinking water rules and safety standards: 15 pts (Health Risk) SD-23-392 Coos • Reinforcement of the sedimentation basin exterior wall (considered 10 pts (Compliance) Christopher Frazier / Tawni Bean as a major structural flaw). 0 pts (Consolidation) • Construction of a FRP baffle wall separating the flocculation 25 pts (Affordability) 3,953 chamber and settling basin. 1 pts (Water System Size) • Replacement of a 12-inch raw water line with a 14-inch line due to leakage and other high maintenance issues. • New improvements needed for the Oerding pump station: a 200 gpm To be confirmed at the time duplex booster pump, a pressure reducing vault (PRV) station and the of invitation to apply and installment of a solar powered active mixier in the Oerding Tank. subject to subsidy • The river pump station and the 14-inch raw water line are needed to availability. Disadvantaged Treatment 2023 12 ensure water availability during the summer months, when the Distribution/Trans. $1,120,510 $560,255 $801,319 $400,659 communities may qualify (LOI expires on 1Q2023 reservoir is not able to meet the water demand. Pump Stations for up to $1,500,000 in Yes 9/3/26) 51 • Treatment nearing the end of its useful life: replace chemical feed forgivable loan funding, or pumps, onsite chlorine generation system, control systems and 50% of total project costs settling basing sediment removal system. (whiche”
Amount requested
$1,120,510 USD
“1120510”
Disadvantaged community
Yes
“Yes”
Ppl quarter added
1Q2023
“1Q2023”
Project rating
51
“51”