Reviewed intelligence covers 1 project across funding pipeline. Current commercial scope concentrates on distribution, process and controls, and pumping and storage.
Last verified Sep 25, 2026 1 published project history
- Last verified
- Sep 25, 2026
- Reviewed portfolio
- 1 project
- Source families
- 3 official families
- Historical depth
- 2023
Account brief
Current reviewed account position
Current Waterline IQ coverage includes 1 published project history across funding pipeline. Accepted project records cover drinking water, with reviewed work concentrated in distribution, process and controls, pumping and storage, and treatment plant. This is a portfolio-derived account view, not a complete capital-program, staffing, facility, or procurement inventory.
- Published projects
- 1
- Official source families
- 3
- Lifecycle breadth
- 1 stage
- Recent material changes
- 0
- Nearest external milestone
- Jul 2026–Jun 2027
What changed
Highest-value recent account changes
No separate reviewed material account change has been published.
Reviewed project portfolio
What the owner is planning and building
Funding pipeline
1Upcoming external milestones
Next reviewed decision points
Business Oregon financing invitation and confirmation of the current project delivery plan
Sandy Water Treatment and Transmission Improvements
- Timing
- Jul 2026–Jun 2027
- Confidence
- Moderate confidence
- Could change timing
- No accepted project relationship establishes the current design lead.
Funding profile
Funding progression by project
Sandy Water Treatment and Transmission Improvements
Requested / Priority-listed / Awarded · $45,416,000 requested
Awarded funding confirmed- Programs
- OHA Drinking Water State Revolving Fund (DWSRF)
- Remaining funding gap
- Not established
Procurement and delivery
Reviewed buying position
Sandy Water Treatment and Transmission Improvements
Awarded procurement
Awarded procurement
Awarded to N8 Holmlund Inc., DBA N8 Excavation · $2,687,000Organizations and relationships
Documented project-specific roles
Contractor
- N8 Holmlund Inc., DBA N8 ExcavationSandy Water Treatment and Transmission ImprovementsEvidence
Facilities and systems
Commercially relevant public assets
No reviewed facility record is available. Waterline IQ does not infer facilities from project names.
Consequential unknowns and conflicts
What current coverage does not establish
-
Coverage boundary
Portfolio completeness is not established
Current coverage includes published Waterline IQ project histories; it is not a complete capital-program inventory.
-
Coverage limitation
Sandy Water Treatment and Transmission Improvements
The award applies to the transmission-main package, not necessarily every treatment-system component in the broader Sandy program.
Open project
Chronological owner activity
Complete reviewed account history
-
Baseline history · Project-level
Transmission-main construction contract authorized
City Council authorized a construction contract with N8 Excavation for the transmission-main package in an amount not to exceed $2,687,000.
Sandy Water Treatment and Transmission Improvements · Official evidence -
Baseline history · Project-level
Transmission-main construction bids due
The City invitation to bid set April 15, 2025 as the bid deadline for the 16-inch transmission-main package.
Sandy Water Treatment and Transmission Improvements · Official evidence -
Baseline history · Project-level
Added during OHA's 1Q2023 DWSRF priority-list cycle
OHA lists the project for DWSRF funding consideration; the workbook does not establish a formal procurement date.
Sandy Water Treatment and Transmission Improvements · Official evidence
Source coverage and freshness
What Waterline IQ has reviewed
OHA DWSRF infrastructure project priority list
Oregon Health Authority
OHA DWSRF infrastructure project priority list — public-comment edition
Oregon Health Authority
Sandy water transmission procurement records
City of Sandy
Evidence and official sources
Accepted owner and portfolio facts
Evidence and material facts — 12 verified claims
Organization governance type
city_municipality
“City of Sandy”
Procurement package
Portland-to-Sandy 16-inch transmission-main construction package
“The Project includes furnishing all labor, materials, and equipment necessary for the installation of approximately 5,500 lineal feet of 16-inch diameter ductile iron water transmission main along SE Bluff Road, between the intersections of SE Proctor Road and SE Hudson Road, in a combined trench with a 3- inch diameter, PVC fiber conduit, the required pipe and conduit appurtenances. Owner’s Engineer estimates the cost of this Project to be in the range of $3.8 million to $4.2 million.”
Awarded contractor
N8 Holmlund Inc., doing business as N8 Excavation
“MOTION: Authorize the City Manager to execute the construction contract with N8 Holmlund Inc, DBA N8 Excavation for the Transmission Main portion of the Portland to Sandy Water Filtration System project, in an amount not to exceed $2,687,000, as amended Motion made by Councilor Smallwood, Seconded by Councilor Ramseyer. Voting Yea: Mayor Walker, Council President Hokanson, Councilor Mayton, Councilor Smallwood, Councilor Sheldon, Councilor Ramseyer, Councilor Hanley MOTION CARRIED: 7-0 9. Contract Approval: Transit Operations Services 2025-2027 The Transit Director summarized the staff report in the meeting packet, provided details on the bids received and the scoring thereof, and clarified the changes regarding administration of the contract for Mount Hood Express services. Council discussion ensued on the following topics: • Overview of the protest received from MV, and the City’s response thereto • Discussion of the history of SAM operations contracts • Discussion of the difficulties experienced by contractor employees who have to change employers at a time that is not consistent with insurance deductible cycles; suggestion to better accommodate those timetables in the future • Note of the typographical error in the suggested motion language in the staff report • Discussion related to the indemnification clause in the contract • Clarification of the monthly bonus amounts included in the contract MOTION: Authorize the City Manager to sign the personal services contract between the Sandy Transit Department and RTW Management LLC as included in the meeting packet Motion made by Councilor Sheldon, Seconded by Councilor Ramseyer. Voting Yea: Mayor Walker, Council President Hokanson, Councilor Mayton, Councilor Smallwood, Councilor Sheldon, Councilor Ramseyer, Councilor Hanley MOTION CARRIED: 7-0 REPORT FROM THE CITY MANAGER • Recognition of the officers receiving the Outstanding Service Awards, and of the outstanding work of the Police Department generally • Note of the upcoming meeting with PGE’s CEO • Thanks for everyone’s participation and effort during the budget process • Reminder of the Memorial Day closure • Recap of recent bids received for Deer Pointe Park and the wastewater effluent pump station • Sharing of his son’s park concept illustration COMMITTEE / COUNCIL REPORTS”
Oha dwsrf loi
SD-23-385
“SD-23-385”
Public comment ppl listing
loi_id: SD-23-385, revised_on: 2026-06-09
“treatment facility, and intertie with Oak Lodge. City of Sandy Issue: With PWB’s new filtration plant, the current transmission line to Rating results include: SD-23-385 purchase water only allows for raw water to be distributed. The option 40 pts (Health Risk) Clackamas of building a new/updated treatment plant to treat all the purchased 20 pts (Compliance) water from PWB is not cost effective in the long term. To be confirmed at the time 0 pts (Consolidation) Jeff Hampton / Matt Mattia Project: The project involves construction of 11,500 ft of 24” diameter of invitation to apply and 0 pts (Affordability) 11,180 subject to subsidy transmission line to convey treated water from PWB’s filtration plant, availability. Non- 0 pts (Water System Size) new pump station, and reservoir repairs/replacements and disadvantaged improvements. Distribution/Trans. communities may qualify 2023 8 Storage $45,416,000 $150,000 N/A N/A No (LOI expires on 1Q2023 60 Land Acquisition for up to $400,000 in 9/3/26) forgivable loan funding, or 50% of total project costs (whichever is lower), and interest rates at 80% of the market rate. City of Junction City Issue: Rating results include: SD-25-451 a.) Loss of water production from wells, 40 pts (Health Risk) Abandonment of Lane b.) Inefficiency of wells E.coli and nitrate contaminated well, c.) Water distribution lines leaks removal of asbestos and cast iron Heather Stevens / Carolyn Craig d.) “Front Well” E.coli and nitrate contamination. To be confi”
Priority rank
8
“8”
Project description
Issue: With PWB’s new filtration plant, the current transmission line to purchase water only allows for raw water to be distributed. The option of building a new/updated treatment plant to treat all the purchased water from PWB is not cost effective in the long term. Project: The project involves construction of 11,500 ft of 24” diameter transmission line to convey treated water from PWB’s filtration plant, new pump station, and reservoir repairs/replacements and improvements.
“Issue: With PWB’s new filtration plant, the current transmission line to purchase water only allows for raw water to be distributed. The option of building a new/updated treatment plant to treat all the purchased water from PWB is not cost effective in the long term. Project: The project involves construction of 11,500 ft of 24” diameter transmission line to convey treated water from PWB’s filtration plant, new pump station, and reservoir repairs/replacements and improvements.”
Project focus
Distribution/Trans. Storage Land Acquisition
“Distribution/Trans. Storage Land Acquisition”
Amount requested
$45,416,000 USD
“45416000”
Disadvantaged community
No
“No”
Ppl quarter added
1Q2023
“1Q2023”
Project rating
60
“60”